Inspection Report Software
For any queries, please Contact Us .
We also sale
Contacted Email :
rahman@gmailcom
Inspection Date:
01-01-2013
Contract No.:
460-26116
Supplier:
AUTO KNITWEAR LID
Factory:
AUTO KNITWEAR LID
Product Description:
SS SS DD TEE
VPN / Style No.:
JF31DE2R912
Order Quantity:
11000 Pcs
Shipment Quantity:
11000 Pcs
Shipment Destination:
UK
Sealed sample Approved Date:
02-12-2016
Contract Shipment Date:
03-01-2017
LMPO/ORMS
INSPECTION CONCLUSION:
1. Style, material, colour product label conformity
Refer to supplier’s in-house inspection report
2. Workmanship appearance/functioning
Refer to supplier’s in-house inspection report
3. Date measurement/field tests
Refer to supplier’s in-house inspection report
4. Quantity, B/D, Shipping mark/label, barcode scanning
Refer to supplier’s in-house inspection report
5. Inspection without MISSING Information & Sample
Refer to supplier’s in-house inspection report
6. 1 If does not conform, missing details:
Other
Comments:
Name of Inspector: SANJIT KUMAR BISWAS
Name of Factory Representative: ASLAM SHEIKH
Signature:
Signature:
SHIPMENT CONCLUSION
Name of Technical Manager: N/A
Sales/Export Report Feature :
Buyer/debtor
wise comparative analysis f. o. b and cm mention;
Sub
contract sales performance comparative analysis
Indirect
income details comparative analysis;
Miscellaneous
income details comparative analysis;
At
a glance factory performance comparative analysis;
F.
O.B comparative analysis with increase/decrease graph;
CM
comparative analysis with increase/decrease graph ;
Inspection Report Sample
Material price/cost variance:
Materials
consumption comparative increase/decrease with graph;
Materials
cost/price comparative ;
Factory
overhead: detail comparative report required;
OT.
EOT and TIFFIN BILL expenses comparative
Office
and admin overhead: detail comparative report required;
Selling
and distribution overhead: detail comparative report required;
Finance
cost: detail comparative report required;
During my PP meeting I discuss above thing with
factory concern people:
Main Label
Attached at Center back, Label slanted & Center out not Acceptable.
Deco label
attached at Top of bottom 5 Cm Left side seam after war.( label Slanted &
center out not acceptable)
Care label
attached after wear left side seam from top of bottom 10 cm, care label
Slanted not acceptable & Measurement S/b follow pp sample
Poppers use all
size at neck & Hoed. (Please Proper way Machine Setting ,Pull test ok
then start poppers attach)
Please avoid
poppers Placed stitching at color stand edge.
Bottom hem is
not straight pals improve.
Hanger loop
length is longer than last sample, please follow back last sample.
NO pocket on
baby sizes. Stain loop too long, please keep 15mm after sew.
Feature of Quality Software
Need to maintain the whiskering pattern
templates for immediate two sizes to minimize the variation in bulk.
Initial lots to be shown to levi’s.
Maintain the record and observe the improvement
on a weekly basis.
Implement strong check points and have
experienced personnel at the checking stations.
Monitor the process at the beginning of the lot.
Implement strong check points and have
experienced personnel at the checking stations.
Monitor the process at the beginning of the lot.
Regular maintenance of spray booth and guns,
make sure that no leakages in the gun and wipe out the extra PP solution after
every garments spray.
Maintain the stage wise standard and control on
fixed recipe.
File the Recipe for every new lot as per Levi’s
format attached in subsequent sheet.
Follow up the production plan with levi’s and
find out the finishes planned for the month
Divide into two : 1.core 2. Pre book finishes
if you don’t have any core finish standard
demand for the same from us.
For pb need to follow-up with concerned vendor
and get the FCRs one week before the lot reaches laundry
Make sure that replication to be done as per
given standard.
In case of variation in the shade bring the
closest option to get approval.
Bring the unwashed references, and get the line
freeze and DP reference sample from WB. List of the same is already mailed to
you.
Strictly have to follow up one time every month
to collect the required samples and show it to Levis, get confirmation, use it
for FCR washing.
Maintain the approval history.
Learn from the same and improve in the next
attempt and next finishes.
Inform the people involved in the process not to
repeat the same mistakes
Meeting to be conducted to make sure that people
involved in the process know how many days are being consumed as lead time.
Always bring the approvals in the morning
between 9.30 to 11.30 on week days with prior information to us.
Based on the plan provided get the wash
standards
Go to the garment vendor and discuss the wash
cost frozen by Levis with garment vendor.
Wherever there is variance quote your wash cost.
If there is disagreement, bring it to Levi’s
notice well in advance before bulk garments reach laundry.
Try and work on reducing the wash cost, discuss
your initiatives with Levi’s
Laundry should know the targeted date for the
lot to dc with stitching vendor.
Prioritize lots accordingly and keep us in loop.
Currently we are digging into it and pressuring
you guys to prioritize the lots.
Make sure that laundry team is aware of the
targeted date.
Analyze the On-time and lead time report of the
previous week and plan for the corrective action to improve the same
Like this: Like Loading...
Related
Trackbacks/Pingbacks