Comments: 1) When Remove the Crease Mark Then Make Dia
Problem.
Bayer: Okaiiiu
Order No.: uuya
Problem:
Brush Problem
Parts Shading
Comments:
Brush Problem is done the outside of factory.
When 1 Parts Prints and passing the curing machine then color change.
Over All Comments: Dyeing Problem
is very much big.
Sewing Section
Bayer: Leooo
Order No.: 27654080
Problem:
Fabric Dia. Problem (Small & Large).
Crease Mark, Edge Mark (Every Roll).
Comments:
Knitting & Dyeing Program Problem.
Bayer: Oooiudi
Order No.: ooirn
Problem:
Crease Mark, Edge Mark (Every Roll).
Wash & Printing Problem
Comments: Pattern master do not know this garment has to be wash. He did not make the pattern according To wash.Information Collected From:
Factory Manager.
Bayer: Lettres
Order No.: 2866540
Problem:
Fabric Dia. Problem.
Crease Mark, Edge Mark (Every Roll).
Comments: Knitting & Dyeing Program Problem & Do not follow up Knitting & dyeing section.
Bayer: Oiiuyi
Order No.: hhgrn
Problem:
Crease Mark, Edge Mark (Every Roll).
Wash & Printing Problem
Comments:
Dyeing Problem.
Knitting Section
Information Collected From: Liakot
Ali.
Bayer: 88os
Order No.: 28222280
Comments:
Dia Select Problem.
To Possible Remove Edge Mark In Dyeing Section.
To Control Shrinkage do not pull.
Dyeing Section:Information Collected From:
G. M. (Dyeing)
Chemical consumption are the main ingredients used with dyes and auxiliaries means the aids or helper to get better results like levelness, adsorption, crease free and other quality parameters. But WATER (H2O) is the important ingredient needed in all dyeing…
Does factory have safe chemicals usage? (provide Oeko Tex )
Does factory maintain Lab test?
Does factory have available fire equipment?
First Aid kits are sufficient?
Environmental Management
Are all evacuation route marked clearly?
Is there found any necked cable?
Are all safety issues of cutting /sewing/ finishing/ washing/ printing followed?
Keep the working area, machine, and everything always clean. Put everything in its proper place and have a proper place for everything. Does factory maintain updated photograph on each section for fire fighters & rescue team?
Does factory maintain a tracker for recording of production activity including chemical usage per style/ date of production for easier tracking system?
Does factory provide proper instruction for safety equipment usage?
Are workers regularly trained on the usage of PPE?
Does factory provide training on Fire / first aid?
Does factory provide Health & Safety Awareness training?
Emergency exit sign are sufficient?
Does factory have written standard operating procedure/ work instruction?
Does factory post sign of personnel protective usage?
Is there sign of no smoking?
Is there sign of high voltage?
Are there signs for occupational health & safety awareness?
Does factory have emergency team?
Are there sufficient rubber mat for Ironman?
Does factory conduct Fire drill on monthly basis?
Does factory checked fire equipment regularly?
Does factory have proper waste water treatment? (proved with independent lab analysis)
Is the fire alarm active?
Does factory have sufficient Eye Washer?
Does factory have License from government?
Does factory have proper collecting tank?
Chemical Materials Calculation
laboratory dyeing machine can dye fabric, yarn or even some accessories like button, zipper and loose fibre but main products are the knitted fabrics. Knitted fabrics have different constructions and GSM (weight of fabric in one square meter) and this have different dye pick-up or adsorption. Table given below shows the common fabrics produced at and used in laboratory.
@ Tk. 3, 2250/- per Cleaner for 8-00 hours duty including reliever Current requirement 05 nos X 3,2250/-
Tk. 126,250/- including Chemical & Materials (Except Toiletries)
Supervisor
@ Tk. 4,2000/- = ×01 for Supervisor each 8-00 hours duty.
Tk.4,2000/-
Chemicals & materials (Except to toiletries)
Required quantity to complete daily cleaning service.
Included
Total
20,2250/-
Floor cleaning machine + Brush to wash floor as & when
necessary, Machine to be kept at your site. Per month (If Machine is placed)
4,0200/-
Rent for Vacuum cleaner per machine per month . (If
Machine is placed)
12500/-
Taka Twenty five thousand seven hundred and fifty only.
Tk. 25,2750/-
Vat & IT, if
any, to be borne by you, not including in the above quotation
Payment Terms: Cleaning bill to be submitted at the end of
the month and Payment of which to be made within first week of every next
month.
Other terms and conditions:
6 days in a week, If worker in Holidays O/T to be paid by you @ Tk. 30/- per hour per person.
Salaries, bonus, Accommodations for the cleaners to be borne by us.
Dresses to be provided by us.
Replacement to be made at quickest possible time.
Inspector to be sent to monitor the work.
Cleaning Chemicals, Materials (except Toiletries) to be provided by us.
Over time to be paid by you if workers work more than 08 hours over time will be count @ TK. .30/= per hour person.
Two Festival Bonuses equal to one month salary to be paid by you during the Eid-Festival. In this context, a separate bill to be submitted to you before Eid Festival.
This contract will be valid for one year up to 15 June 2008, may be renewed upon mutual consent. Either of the party can terminate service during this period by giving 30 days notice or pay in lieu. We sale Clothing Inventory Management Software ERP for Sale
Re: Manpower Allocation: In case
of manpower increases/decreases the invoice value will be increased/decreased
proportionately.