What is 3Kva UPS ? General UPS Functionality

What is 3Kva UPS ? General UPS Functionality

3Kva UPS – Read about General Guidelines for UPS

outr power capacity 2.7 KWatts / 3.0 kVA  
KW Configurable Power (watts 2.7 KWatts / 3.0 kVA  
Pvinal Output Voltage 230V  
OtraVoltage Note Configurable for 220: 230 or 240 nominal output voltage  
Output Voltage Distortion Less than 3%  
Output Frequency (sync to mains) 50/60Hz •1- 3 Hz  
Load Crest Factor 3:01  
Topology Double Conversion Online  
Waveform type Sine wave  
Output Connections (8) IEC 320 C13 (Battery Backup)
(2) IEC Jumpers (Satiety Backup)
(21 IEC 320 C19 (Battery Backup)
 
Bypass Internal Bypass (Automatic and Manual)  
Input  
Nominal Input Voltage 230V  
Input frequency 40 – 70 Hz (auto sensing)  
Input Connections British 651363A, IEC-320 C20, Schuko CEE 7/EU1-I6P  
Input voltage range for main operations 160 – 275V  
Input voltage adjustable range for mains operation 100.275 (half load)V  
Cord Length 2.44meters  
Other input voltages 220, 240  
Number of Power Cords   3
Communications & Management  
Interface Port(s) R1-45 Serial , Smart-Slot , USB  
Control panel Multi-function LCD status and control console  
Audible Alarm Audible and visible alarms prioritized by severity  
Emergency Power Off (CPO) yes  
Surge Protection and Filtering  
Surge energy rating 340Joules  
Filtering 340Joules  
Featu es & Benefits  
Embedded network management card with environmental monitoring (5 kVA — 10 kVA models) Remote monitoring and control of the UPS and the environment via Ethernet connection while freeing up the SmartSlotTM so customers can add accessories for additional communication options.  
Display LCD Display  
Operate without battery Yes  

Sendon UPS functionality:

  1. Switch on your Sendon UPS. The ON/OFF Led should be Green. The green LED indicates that the voltage is normal. So you can operate your computer system as usual.
  2. When the red LED remains ON for a few seconds and then turn off, it means the internal control circuit has shutdown.  It is necessary to turn off the POWER switch for at least 6 seconds to reset this condition. Also check whether the UPS is overloaded or short circuited.
  3. Both the red LED and biff are on intermittently as long as the UPS is in back-up mode.
  4. When the battery charge is finished, the UPS will shutdown itself. The red LED and biff will be on for a few seconds and then turn OFF.   

Micro UPS Functionality:

There is three LED in the front of this UPS

  • AC Normal
    • Inverter
    • Charging

AC Normal: When the computer is run from AC via UPS this LED is ON

Inverter: When electricity is not available then the computer is run from battery /Inverter mode. On that time this LED is ON.

Charging: When battery will be charging this LED will be on. The benefit of micro UPS is when you leave office you must switch off your UPS. As a result instead of switch OFF of the UPS, it will be charging during your leaving time.

You can contact me to understand in detail.

More Equipment

• Automatic Voltage Stabilizer
• – Domestic and Industrial ( 1KVA to 5MVA)
• Uninterruptible Power Supply (UPS)
• ( On-Line UPS & Off Line UPS)
• – Domestic and Industrial
• Emergency Power Supply (IPS / EPS)
• Sub-Station Equipment
• – 5KVA to 5MVA
• Automatic Battery Charger
• Converter & Rectifier
• Digital Clock
• Distribution Transformer
• – 5KVA to 5MVA
• Static Inverter
• PFI Plant
• Water Level Controller (WLC)
• Electronic Fan Regulator (EFR)
• Electronic Ballast
• Electronic Moving Message Display
• Other Electronic Equipment
• Fire Hydrant System
• CC camera System
• CC camera Central monitoring System
• Building Management And Controlling System (BMC)

What is Gas Diffusion Apparatus Unit . Apparatus Specification

What is Gas Diffusion Apparatus Unit . Apparatus Specification

Gas Diffusion Apparatus Unit

Gas diffusion apparatus unit: should have ability to separate CO2/air mixture by absorption in counter flow with water. Production of gas mixture should be possible by using CO2 from compressed gas cylinder and ambient air. Adjustment of mixing ratio should also be possible by using valves compressor for delivering the gas mixture into the absorption column. Continuous solvent regeneration in circuit with desorption column under vacuum. Water temperature control with heater and refrigeration system. sss

More

We have significantly increased the production capacity by commissioning the new set of fully Auto corrugated board making machine and Semi Auto corrugated board making machine. In addition to this we have added two color Offset printing machinery in our offset printing section. Also turning the offset printing Floor Air condition to meet buyer’s demand. Further, to meet the quality product we will have to commission high capacity Boiler.

In order to meet the growth of production and extension of the project we immediate need the bigger capacity of Power Gas Generator Unit. This is why we are interested to improve the 900KW/1125 KVA Gas Generator.

Gas Diffusion Apparatus Unit Specification

  • Absorption column height: 2x 750mm, internal diameter= 80mm,
  • Desorption column height: 750mm, internal diameter- 80mm
  • Pumps (absorption/desorptionl: max. Flow rate= 17Lit/min (02 No.)
  • Pump (coolingl: max. Flow rate: 29Lit/min (01 No.)
  • Compressor: max. Positive pressure= ibar, max. flow rate= 4m3/h
  • Measuring ranges: Air flow rates= 0.4 to 40 Lit/min, Solvent= 40 to 430Lit/hr, CO2= 0.5 to 6 Lit/min, temperature= 0 to 80°C, pressure= 0 to 2.5bar of Gas diffusion apparatus
Compressed Air Technologies Engine for System of Apparel Factory

Compressed Air Technologies Engine for System of Apparel Factory

Compressed Air Technologies

All Wartsila Power Plant needs compressed air the process-compressed air technologies systems are divided into two different systems: Read about  Diesel Air Compressor

  • Starting Air System
  • Used for starting of the engine
  • Back up control air
  • Pressure 30 bar
  • Control Air System(also called Instrument Air)
  • Used by pneumatically controlled components in the power plant
  • Pressure 7 bar
  • Used as working air for tools etc.

The specifications of Starting Air Compressor of JPP are following:

Rated Power…………………………..11 KW

Rated Voltage…………………………380/415 V

Rated Current………………………….22.2/20.5 A

Power Factor…………………………..90.1

No. of phase……………………………Three

compressed air technologies by 3-compressor then it is passed through a cooler. The compressed air from cooler is stored in air vessel. The Distributor supplies the starting air to cylinder as firing order.

The starting air unit has an outlet line with a pressure reducer, connected to the instrument air system. This enables the starting air unit compressor. The instrument air unit supplies air at lower pressure to pneumatically operated devices on the engine and in the auxiliary system.

The specifications of Instrument compressed air technologies of JPP are following:

Model…………………………………..UP52210 Rotary

Serial No………………………………..32054

Capacity…………………………………3.11 m3/min

Rated Pressure……………………………1.0 MPa

Rated power………………………………22 KW

Following specification is for Air dryer:

Model…………………………D3001N

Rated Air Flow………………5000 L/min

Rated Power………………….1.43 KW

Rated Pressure………………..14 Bar

Maximum Temperature……….60 C

Charge Air

  • The main function of the charge air system is to provide the engine with clean and dry combustion air of sufficient quantity and quality.
  • The combustion air (charge air) to the engine is drawn from outside the building (open air).
  • The air is drawn through the air intake filtration unit via a pipe system provided with a charge air silencer into the turbochargers installed to the engine. The compressed charge air is cooled in the charge air coolers before it enters the engine’s charge air receiver.
Charge Air

Exhaust System The exhaust gas system leads the exhaust gases to turbocharger and after  that  out  of  the  power  house,  thus  ensuring  that  emissions  and  noise  are kept on an acceptable level. The exhaust gas system consists of pipes, flexible bellows to compensate for thermal expansion, and an exhaust gas silencer. The exhaust gas system is equipped with a ventilation unit and explosion vents located at strategic places

Exhaust System

Ignition System of compressed air technologies

  • Ignition is initiated by a spark plug.
  • The control system determines the timing of the spark.

The high voltage (20-25 KV) link between the ignition coil and the spark plug.

How Gas Engine Works?  Fuel Delivery System Process

How Gas Engine Works? Fuel Delivery System Process

Fuel Delivery System

The whole Fuel Delivery System of the gas engine is observed form a control room adjacent to the engine room. The Shift engineer is responsible for activities in the control room. He is assisted by other engineers to take regular readings from different instruments of the control room. In case of any emergency the engineers can shut down any engine even the whole plan, if they want from the control room. It has  Gas Diffusion Apparatus Unit

Gas Generator Specification

  • Serial Number……………………………  PAAE106678898
  • Engine Type……………………………… V-engine
  • Cylinder Bore……………………………. 340mm
  • Stroke…………………………………….. 400mm
  • No. of Cylinder…………………………… 20
  • Firing order……………………………….. Al -El -A7-B7-A3-B3-A9-B9-A5-B5-Al
  • 0-Bl0- A4- B4-A8-B8-A2-B2-A6-B6
  • Speed…………………………………….. 720/750 rpm
  • Mean Piston speed…………………………10 rn/s 
  • Engine Weight…………………………….86 tones
  • Engine Capacity……………………………9000 KW
  • Engine Output …………………………….8700 kW
  • Rotation……………………………………CCW
  • Electrical Efficiency………………………..46.5%

Gas Engine Components

  • The Engine Block              Exhaust Valves
  • The Cylinder Liner           Turbocharger
  • Main Bearing                    Charge Air Cooler
  • Crankshaft                          Oil Sump
  • Pistons                              Centrifugal Filter
  • Cylinder Head                    Pre-Combustion chamber (PCC)
  • Inlet Valves                       Main Combustion Chamber (MCC)

Control room of Gas Engine

The whole operation of the engine is observed form a control room adjacent to the engine room. The Shift engineer is responsible for activities in the control room. He is assisted by other engineers to take regular readings from different instruments of the control room. In case of any emergency the engineers can shut down any engine even the whole plan, if they want from the control room

he whole operation of the engine is observed form a control room adjacent to the engine room. The Shift engineer is responsible for activities in the control room. He is assisted by other engineers to take regular readings from different instruments of the control room. In case of any emergency the engineers can shut down any engine even the whole plan, if they want from the control room

Before Starting Condition of Gase Engine

  •   Low lube oil pressure
  •   HT water temperature >45C
  •   Starting air pressure >(18-32) bar
  •   Engine speed=750rpm
  •   Valve power supply>24 v DC
  •   Turning gear disengaged
  •   Exhaust gas ventilation
  •   Engine is not running
  •   Stop command inactive
  •   Shut down alarm inactive
  •   Tripping alarm inactive
  •   Breaker truck in service
  •   Pre lubricating performed
  •   PLC — WECS communication.

Details of Various Systems of JPP

  • Fuel Delivery System or Gas System
  • Lube oil System
  • Cooling System
  • Compressed Air System
  • Charge Air and Exhaust System
  • Ignition System
  • Other Equipment (Miscellaneous).

Details of Various Systems of JPP

  •   Fuel or Gas System
  •   Lube oil System
  •   Cooling System
  •   Compressed Air System
  •   Charge Air and Exhaust System
  •   Ignition System
  •   Other Equipment (Miscellaneous).

Fuel System

The purpose of gas Fuel Delivery System is to provide the engine with clean gas fuel at right pressure. Before start the gas fuel system for the engine the following should be checked:

  • Make a visual check of the entire unit (all connections are installed and secured).
  • Dispose of any unsecured items.
  • Ensure that the engine room is well ventilated and gas free.
  • Check that the main gas valve on the gas regulating unities closed.
  •   Check that the gas inlet pressure is normal.
  • Check that the control air pressure is sufficient to operate the system.
  • Check that the electrical control system is active & power available.
  • Control the gas regulating unit is functioning properly.
  • Control that the shut –off valves are tight.
Fuel System

Operation of fuel System

The Fuel Delivery System in JPP is Gas. The gas is supplied to the engine through a regulating unit. This unit includes filter, pressure regulator, shut-off valves and ventilating valves. The unit has separate outlets for the main gas and pre-chamber gas. The gas outlet pressure in the unit is controlled by the engine system (WECS) according to engine control. On the engine, the gas is led through a common pipe via individual fed pipes to each cylinder. A separate pipes system provides the pre-chambers with gas.

The normal operation and supervision of the gas regulating unit consist mainly of simple daily checks, such as:

  • Check temperature & pressure in the system.
  • Check the pressure drop over the filtration unit.

Shut-down of Fuel Delivery System

Normal Shutdown –

  • Close the main gas inlet Valve on the train.
  • Close the main shut –off valve outside the building
  • Open the manual ventilation valve if the gas regulations unit shall be shut down for any prolonged time.
Shut-down of fuel system

Emergency Stop –

If the engine condition requires an immediate stop of the supply to the engine or engine room, an emergency stop must be performed as follows:

  • Shut – down the engine – use any of the emergency stop buttons.
  • Close the main gas inlet valve.

Lubricating oil system

The primary function of the Lubricating system is to provide the engine with a sufficient quantity of clean LO at the required pressure and temperature. The LO lubricates the engine and removes heat and contaminations generated by the combustion process

Lubricating oil system

Operation of LO System

Following readings and measurements have to take and fill up the log book daily:

  • Check the oil level in the engine sump.
  • Check the Function of the centrifugal filter.
  • Check the Pressure drop over the automatic filter.
  • Check the Pressure and temperature of the system.
  • Check the System for leaks.

Shut down of LO system:

In AUTO position the sump starts when the engine is stopped and respectively stops when the engine starts.

Cooling System

The main function of the engine cooling system is to remove the heat generated by the normal functions of the engine. The cooling system is provided into a HT & LT circulation system. Each system is fitted with its own circulation pump driven by the engine.

The HT circuit cools mainly the cylinders and the cylinder heads. A centrifugal pump circulates the water through the HT circuit. The LT circuit cools the charge air cooler and the lube oil cooler. The common circuit is cooled by radiator units.

In reciprocating engine, following are sources of heat from where cooling water carries away heat:

  • Engine Block
  • Cylinder Liner
  • Cylinder Head
  • Charge Air Cooler
  • Lube Oil Cooler
  • Turbocharger, in case it is water cooled

The specifications of Radiator of JPP are following:

Motor Power Capacity…………………………….7.5 KW

Total Radiators Fans………………………………48

Speed………………………………………………725 rpm

Space between Cooling Fins………………………2.5 mm

Internal of Cooling Fan per Radiator of Fuel Delivery System………………6

What is Lint Built UPS and Short Circuit 3 . Tenants Factory

Short Circuit 3

Short Circuit 3 – The primary objective is to ensure the factories used to produce products for VF in Bangladesh are safe for all of the workers employed. From broken and free electrical wiring association, particularly the wiring of dry iron utilized for CREASING PURPOSE. It is discovered that more often than not the iron wiring are appropriately settled while being continually utilized. The free wiring association gets in contact with negative and positive wires of iron, which gives start and odds of flame and electrical stun is high. Read about General Guidelines for UPS . …

Lint Built UPS

  • Build up constructed ups on overhead wiring channels.
  • Build up constructed ups inside electrical control boards.
  • Most normal build up constructed ups are inside sewing machine electrical engine packaging. Generally because of variance in current supply or because of Short Circuit 3 smoke ascends from these engine packaging, which laborers on observing this gets terrified.
  • Utilization of inflammable synthetic substances for spot expelling/Cleaning reason:
  • The most widely recognized concoction utilized for spot expelling is THINNER (Sprite containing
  • 100% Alcohol) the gear utilized for showering has an electrical attractive engine.
  • Normally, because of steady use, these types of gear are anything but difficult to get overheated and
  • odds of start are high. Then again odds of flame are likewise high.
  • We as a whole think about flame in CHOWDHURY KNIT. The fundamental driver of flame was because of this
  • concoction utilized for spot expelling.
  • synthetic concoctions in washing plant and coloring plant are put away unsystematically and void
  • synthetic concoctions drums/compartments are normally held under open sky. Exceptionally in the event that corrosive drums are held under open sky and on the off chance that it downpours , exhaust may ascend from these holders and may cause fire and furthermore that these might be dangerous to wellbeing and condition.
  • Specialists absence of flame security learning and fire penetrates because of which if there should be an occurrence of genuine fire
  • or on the other hand because of any false caution they get apprehensive and froze.
  • Plants holding the ways out safely guarded.
  • Blocked Aisles/exits/staircases.
  • We can recognize the previously mentioned focuses as the principle and real reason for flame and losses in Bangladeshi processing plants. When we have distinguished the purposes behind flame and losses, we ought to do the accompanying, as we have confidence in “PREVENTATION IS BETTER THAN CURE” in view of these , all industrial facilities should:
  • Evacuate and supplant every single flawed wiring.
  • At any rate check and keep record of wiring support fortnightly.
  • Extraordinary checks to be directed on Iron, combining machine, free attachments, switches, Short Circuit 3 breakers on regular schedule and wherever change required ought to quickly be supplanted.
  • Clean build up assembled ups once per week.
  • Check and clean engine packaging once every week.
  • Correct all free electrical associations.
  • Choose affirmed and authorized Short Circuit 3 tester to complete all the previously mentioned works.
  • Give preparing to specialists and dishearten them on utilizing of any broken types of gear, they ought to be prepared to ready to perceive any kind of variation from the norm in the types of gear they are taking care of.
  • Store synthetics according to guidelines put on their holders.
  • Try not to dump any void synthetic holders under open sky.
  • In the wake of perceiving the reasons and reasons for flame in Bangladesh, we can classified the

Manufacturing plants in Bangladesh into sort dependent on their areas:

Freestanding Factory and its requirement for fire preventions.

A freestanding factory is factory which may be a single storied shed type building or it may be a multi storied building which is being used by one single factory and which is not shared by any other tenants. We can chalk out procedure and methods for free standing factories on how to tackle fire situations and how to train workers on these issues as follows;

Factory should conduct unannounced fire drills at least once a month.

factory should let the workers know about the accidents occurred in other factories and the reason of casualties, and educated them how to tackle in situations that had occurred in that factory and also educated and motivate workers to participate in Fire drills seriously.

At least 40% of workers should be trained on how to use fire extinguishers, but would be suggestible that as part of factories best policy 100% of workers should be trained on use of fire extinguishers. Factory to form “Disaster Management and Prevention Committee” with the following teams who should be provided with uniforms:

  • Fire Fighting team
  • Rescue team
  • Rescue team for Child care center
  • Special Security team

The above team members should be properly trained and they should have their own written

DISASTER MANAGEMENT AND PREVENTION PROCEDURE, these teams should sit for

meeting at least once a month.Educate all workers the meaning and importance of exit/aisles/extinguishers and electrical panels markings

Factory should install battery operated fire alarm system and this should be heard all at a time from all floors of the building no matter where activated from. In case of gong bell, workers should be trained that whenever one hears a gong bell ring should immediately start ringing the other gong bell in the floor by person near to the bell and workers to evacuated building as per procedure.

Factory to implement a system that electrician should check all electrical switches, irons, fusing machines etc., and sign out in a log book before shutting down the main switches on closing down of the factories.

All workers should know how to shut down main switches and how to activate fire alarm switches. Workers should be able to understand evacuation floor plan and should know the nearest exit to be used during evacuation.

Tenants Factory and  its requirement for fire preventions.

Inhabitant manufacturing plant is a processing plant where the building is shared by different inhabitants or occupants and the fundamental passageway and ways out are altogether utilized usually. For Tenant kind processing plant every one of the focuses referenced for Freestanding processing plant is to be tracked with the accompanying focuses:

Should frame “Occupant DISASTER MANAGEMENT AND PREVENTION

Board of trustees”Should lead Fire penetrates and preparing together with different inhabitants . Guarantee that all staircases and ways out are kept clear unsurpassed. Have normal or public putting out fires hardware put at all stairwells, and crisis lights too. The fire caution alarm/signal/ringer ought to be gotten notification from all floors (all inhabitants) The occupant debacle the board and anticipation advisory group ought to sit for a gathering each month and should visit the entire working to discover resistance issues and they should take appropriate measure to amend the rebelliousness issues quickly.

Lead mindfulness meeting on these resistance issues. Blurbs/photos on security issues, for example, which means of different markings (exits/dousers/passageways and so forth) ought to be posted set up where by and large the consideration of laborers can be drawn.

Conclusion

Direct preparing ablaze wellbeing and medical problems of short circuit 3. direct reported and unannounced fire drills, board of trustees ought to encourage approaches to enhance if bore is nit agreeable. co-work with BGMEA and different purchasers to actualize the fire security, fire bore and preparing for all occupants inside a similar building.

Guidelines on Use of Compressed Gases Cylinder Valves

Guidelines on Use of Compressed Gases Cylinder Valves

Compressed Gases Cylinder Valves

The precautions to be taken in the transport, storage, handling and use of Compressed Gases Cylinder Valves are known and understood by all personnel. To meet statutory requirements and ensure the safety of persons using compressed gases.Hazards associated with the use of compressed gases include oxygen displacement (and possible asphyxiation), fires, explosions, toxic gas exposures, and the physical hazards related to high pressure systems. Read about Proof Cylinder Test Procedure

Racking :All pressure vessels including purge bottles to be listed, numbered and registered, inspections and tests to be carried out on due date in accordance with the legal requirement. The test period of vessels to be ascertained and indicated on the list. Still insufficient racking in the store rooms –currently sourcing more. We did not receive much of an update during our meeting so please help to update us on your progress.

Night fire drill: All vessels to be properly identified by painting the number on the body and or putting a numbered tag at appropriate place.

The guidelines of the night fire drill have been added to the fire drill SOP but we have not seen a copy so please help to send.

Risk assessment: Still need an update on whether you have reviewed your current risk assessment based on Auto Garment’s version.

Building check format

All safety valves (relief valves) to be list, numbered and registered with relief pressures. The test period of Safety valves to be ascertained and ideicated on the list. We were told that hamid is working on the building check format. Please can you update us on any progress made.

Red Line on Pressure Gauges.

All pressure gauges to be listed, numbered and registered. The test period of pressure gauges to be ascertained and indicated on the list.

All pressure gauges to be properly identified by putting a numbered tag or dymo taped number at appropriate place on the pressure gauges and also on the pipe / block connecting the pressure gauges.

The pressure gauges to have a red line on the dial or body not on the glass indicating the maximum operating pressure.

Cylinder Storage & Usage

Full and empty cylinders to be stored separately

Flammable and oxidizing cylinders to be stored separately

Cylinders used in vertical position to be fastened.

Cylinders to be tested & maintained as per statutory requirements.

Lighting

Factory lighting may have an impact on worker safety, productivity and product quality. There may be different needs for lighting depending upon the particular machinery being used or the task in which the workers are involved. Certain manufacturing tasks (e.g. stitching) may require greater than other tasks. Generally, the illumination that is provided should be sufficient to accidents and be consistent with the production of high quality goods. Specific lighting values for various factory areas are recommended .There must be emergency lighting provided in general factory areas, in stairwells, and along all of egress. This emergency lighting must have a power source that is independent of the general energy supply to the factory (e.g. battery-powered lights with continuous charging).Production areas should be kept clean and floors should be dry. Product and raw material storage should Factory Area

Illuminance Values (lux)

Office work areas 300 – 500

Storage areas and warehouses > 50

Aisles > 50

Stairs > 100

Manufacturing: assembly, stitching and general manual operations

> 300

Machining: cutting, grinding, punching, laser cut, lathe, milling, drilling, electric sawing,

.> 500

Quality assurance and control 650 – 800

Toilets > 100

First Aid rooms > 500

Conclusion

All safety valves to be properly identified by putting a numbered tag at appropriate place on the valve and also on the pipe connecting the safety valve. The safety valves to be sealed after testing so that the relief pressure setting cannot be changed. Compressed Gases Cylinder Valves -Emergency lighting >1, but also >1% of the general aisles lighting in the associated factory area