What is Quality System Audit Report? Different Types Of Final Inspection

What is Quality System Audit Report? Different Types Of Final Inspection

Quality System Audit

Quality System Audit – Select 5 garments at random from the packed goods and bring them to clean, clear and well-illuminated table.

  • Check the garments one by one and record nature and number of efects classified under 3 categories :
  • A – critical
  • B – major
  • C – minor
  • Calculate the DHU (defects per hundred units). Record this.
  • Enter the Weekly Quality System Audit Summary.
  • Discuss the quality issues specifically with the production manager.
  • The auditor is normally the senior-most person in the factory.
  • The auditor is estimating the defects missed. The efficiency of the quality system is the defects found by the line checkers expressed as a percentage of the total defects (got from the in-line sampler or the sum of the defects found & the defects missed).
  • The efficiency of a line checker can also be calculated by doing a quality audit on pieces passed by her. We sale Garments Quality Control Inspection Report Software

DIFFERENT TYPES OF FINAL INSPECTION

There are three types of inspection that must be conducted during a final inspection-

  • Workmanship Quality
  • Spec Measurement
  • Packing Integrity (which consist of two checks called the Count and Accuracy Quality System Audit )
  • All three inspections must be conducted when a PO has been packed completely (100%).
  • A Packing List (P/L) must be available for use by the QA to perform the above inspections, so that appropriate random sample size can be selected for the final inspection.

FORMS TO BE USED FOR EACH INSPECTION

PEI and Vendor QA should use the approved PEI formats globally.

Final Inspection Reports (page-1) which provides a summary of the result of inspection Final Inspection Check-List (Tops or Bottoms- page-2) used as a guide for the QA to check the product in a systematic manner. Measurement Quality System Audit Report for spec measurements

Using the reports

Report Usage
Cut quality report Monitor & target quality by cutter – CS Know in advance which parts have a cutting problem – PM Monitor cutting quality – FM
Roving inspection record sheet Know trend in operator’s quality over the week and deal with operators who are not improving– QS Check how many operators the sampler has visited – QS
100% inspection Show which operations are producing defects and require attention –QS Know which are the problem operations and take corrective action – PM  
Repair list Keep track of repairs and ensure that they are returned promptly – QS  
Quality audit Monitor the efficiency of the quality system and provide feedback on the quality being passed – FM  
Weekly audit summary Follow-up on actions arising from the Quality System Audit – FM  
Daily quality report Know which are the problem operations and take corrective action – PM Monitor the quality produced by the lines – FM  
Weekly quality report Know which are the problem operations and take corrective action –PM Monitor the quality produced by the lines – FM  

INFORMATION AND GUIDELINES-

Verify the following is available when performing a Final Inspection-

Ensure FIT, PPS has been approved and PPS available for reference. If PPS has not been approved DO NOT proceed with Final Inspections.
Verify if TOP has been sent prior to conducting Final Inspections. Contact local  merchandiser if TOP has not been sent. DO NOT mark ‘PASS’ on Final Inspection report of TOP is not approved.
QC file available with PPS comments from  office, complete PDM (tech pack), purchase order sheet with UPC information sheet etc.
Fabric and Hand / Color standard that has been approved.
Shade band in the case of indigo or piece dyed product that has been approved.
Trim card complete with all trims that has been approved including embroidery, printing standards.
Fabric and Garment test reports confirming that the product meets the care label instructions.
Final Packing List.

PACKING MODE

Circle the shipping mode and packing method on the inspection report-

Verify packing method
Verify if the order is a standard pack (solid size/color) or pre-pack.
Verify if the style should be shipped with individual or master poly bag.
Inspect container for any holes, damages etc.

PACKAGING

Go through the check list against the packaging and place a check mark against YES, NO or N/A-

Verify if carton quality is good and strong, condition is dry and not damp.
Ensure cartons are taped with approved security tape.
Verify by measuring the carton dimension against what is printed on carton and ensure they are within the requirements.
Ensure carton markings are correct as per requirement of store/customer.
Ensure carton pack ID label is placed in the correct place.
Verify if there are any other extra carton labeling required by specific customer.
Verify if there is no wastage of space within carton while carton size is correct to the size of the stack. Space around garment inside the carton is loose all around.
Verify that the garments are stacked carefully so that there are minimal movements within carton.
Ensure hangers are secured safely within the carton either to the elastic or hanger grooves (hook holder) made out of corrugated sheets.
Ensure poly bag quality and gauge is correct while the bag fits to the garment size and that they are not wet or damp, while also checking if perforation is needed or not.
Ensure hanger and hanger sizer quality is correct while the color and size is also correct.
If garments are folded and packed flat, ensure they are folded correctly as per specification and there are no dead creases or wrinkle marks.
If there are other items for packaging, add the point/s and mark accordingly.

COUNT AUDIT-

Perform a count audit by counting the number of units within the box and ensure it matches the carton marking and ID label quantity.

Accuracy Quality System Audit

Verify poly bag sticker size is correct when compared to hang tag size. R emove poly bag.
Verify hang tag/ joker tag & price ticket quality is correct while the placement is as per specification.
Verify hang tag/ joker tag & price ticket information and price is correct.
Verify hang tag / joker tag & price ticket size is correct when compared with size label.
Ensure flasher quality and information is correct while the placement is also correct and secured. If flasher calls for NO IRON or WRINKLE FREE or PERMANENT CREASE etc., then the garments have undergone testing for repeated home laundering and passes PEI or customer standard as per manual
Ensure size strip quality is correct and it sticks on to garment very well while upon pealing the size strip, there are no residues settling on the surface of the fabric. Also verify the color of fabric is not running onto size strip.
Ensure the size on the size strip is correct to hang tag/ joker tag and size label.
If there are any ‘Other’ trims for packaging ensure to add to check-list and mark accordingly of Quality System Audit
How to Prepare Roving Inspection Record Sheet

How to Prepare Roving Inspection Record Sheet

How to prepare the roving inspection record sheet:

  • Obtain a copy of the Roving Inspection manning
  • Write down which week this sheet will be used for.
  • Write down, which line this report, is going to be used for.
  • Write the operation names in the first column, leaving rows for as many operators as have been allocated and 2 more for operators who are moved to this operation for balancing purposes.
  • Write the names of the operators allocated against their operations.
  • After the space for each operation draw a horizontal line across the ‘operation’ column and across the ‘analysis by operation’ column. We sale Garments Quality Control Inspection Report Software

How to complete the roving inspection record sheet:

  • Total the number of faults for the week for an operation, excluding clearance checks. Write this under the ‘faults’ column.
  • Count how many times that operator was visited for that operation, excluding clearance checks. Multiply this by the lot size and write this down under the ‘sample’ column.
  • Divide the number of faults by the sample, multiply by 100 and enter this for the for the operator.
  • Add up the number of faults made by all the operators for an operation. Enter this in the ‘faults’ column for the operation.
  • Total the samples for all the operators who did that operation. Write this number as the sample for the operation.
  • Divide the number of faults by the sample, multiply by 100 and enter this for the for the operation.

PACKING INTEGRITY INSPECTION

By performing a comprehensive Packing Integrity Roving Inspection either during in-line, pre-final or final inspection stages, we can detect errors caused due to incorrect trims (style, size or color), incorrect garment size/color assortment or incorrect carton marking and labeling, so that the end product reaches the customer efficiently and without the need to perform extra handling thus saving time and money.

TYPES OF PACKING INTEGRITY INSPECTIONS

COUNT- To verify the quantity of units within a size and/or carton is correct to specifications.

ACCURACY- To verify the accuracy of trims and labeling within a garment and that of which is marked/labeled on the carton

HOW TO PERFORM A PACKING INTEGRITY INSPECTION

A packing integrity inspection must be conducted on all Purchase Orders (PO). During the Packing Integrity Inspection, the entire PO must be completely packed. Packing list must be on hand to perform such Roving Inspection. All carton numbers that have been selected for the random inspection must be marked on the inspection report

While selecting cartons, ensure to place a signature across the top opening of carton while making sure that the same cartons are brought into inspection area. Have the PO and Final Inspection detail Check-List on hand to perform the Packing Integrity Inspection. After review of performance of the factory, the inspector may be asked to switch back to Reduced Level Sampling Plan.

It is imperative that the factory arrange all cartons in single or double row with carton number facing out, so that QA can view the carton numbers. Factories are not allowed to arrange cartons with carton number facing inwards. Factories are not allowed to arrange cartons in triple or quadruple rows for Roving Inspection.

Garment Line Checker Task and Job Responsibilities

Garment Line Checker Task and Job Responsibilities

Line Checker Task

  • Line Checker Check the finished garment.
  • Pass the garment if it does not have any defects.
  • Reject the garment if it has defects. Keep it aside, with the other defective pieces in the bundle. sss
  • Major task is to check Sewing Software for Garment Line Input
  • Mark the defects found on the garment with clearly visible stickers (or a thread if the stickers leave marks).
  • Record the defect on the 100% Inspection Record
  • Repeat steps l – lV for the rest of the bundle.
  • Count the number of defective pieces in the bundle. Note it down in the repair list. Give the pieces to the Quality supervisor. Keep the rest of the bundle aside. Note down the time the pieces were given to the Quality supervisor.
  • Trace the operator who made the defect.
  • Give the pieces back to the operators for alteration.
  • Pieces are altered and given back to the supervisor / repair girl. These are given back to the garment line checker.
  • Note down the time when the pieces are returned.
  • Recheck the garments. If there are no defects pass the bundle. If there are defects repeat the procedure from step Vl.
Garment Quality Inspector Job Responsibility

Garment Quality Inspector Job Responsibility

Quality Inspector Job

  • Quality Inspector – To stop defective cut parts from leaving the cutting room.
  • To ensure that cut parts meet sewing room requirements in terms of size, notches and drill holes.
  • Select 9 parts from the garment at random for inspection and enter on the cut quality report.
  • Garments Quality Control Inspection Report Software operation
  • Place the pattern on the top ply for the first part. Align the pattern on one edge (reference edge) and check for deviations on other edges.
  • For each deviation from the pattern that exceeds the tolerance, note a defect for that part under “Top”.
  • Check the same part (top ply) for position and depth of notches and position of drill holes. Record defects, if any, under corresponding column.
  • Repeat steps II, III and IV for a ply from the middle of the stack and the bottom ply. Record defects, if any.
  • Repeat steps II, III, IV and V for the remaining parts.
  • Show size defects to the cutter and cutting room supervisor. The cutter should rectify the defects immediately.
  • Compute DHU (defects per hundred units) and record this.
  • Notes:
  • Tolerance for straight knife machine is +/- 3 mm and for band saw, +/- 2 mm.
  • The cut Garment Quality Inspector report is sent to the Factory Manager as a part of the daily Cutting Room performance report (Appendix IX).
  • The middle ply is taken without disturbing the stack of cut parts so that defects, if any, can be rectified by the cutter.
  • Parts are inspected based on the requirement of the sewing room. If the sewing room does not require that collars, cuffs etc. is cut exact, inspect these accordingly.

HOW TO CONDUCT A FINAL INSPECTION?

  • As a practice, a final inspection must be done in the following sequence-
  • Packing Integrity
  • Workmanship Garment Quality Inspector
  • Spec Measurement

FINAL INSPECTION REPORTS-

  • Below is a guideline for the auditor on how to use the inspection reports.-
  • Use the approved Final Inspection summary report
  • Use the detailed check list as a guide to cross check with garment and information on hand
  • Use the spec measurement report.
  • All three documents must be sent electronically to the QC dept. for IC issuance purpose by PDF format.
  • PE QAs must also ensure to verify the factory QA’s performed the compulsory 100% packing inspection and 10% packing integrity audit and all reports are properly recorded and filed prior to accepting a shipment
  • The Final Inspection Detail Check-List (Tops, Bottoms) must be used as a guide during a Final Inspection.
  • The inspector must put a check mark against YES only if no issues were found for that area or operation.
  • A check mark must be placed against NO if issues were found in that area or operation.
  • If an operation is not applicable, then a check mark should be placed against N/A

Joining Report Sample

JOINING REPORT

Read about Employee Management System Software Free/ Premium

Name: _______________________ Designation: _________________________

Section: ______________________________Pin No: _________________________     

Self  Phone No: ________________________________________________________

Blood Group: ________________________________________________________

Date of Joining: (Day/Month/Year) _______________________________________

Father / Mothers Name: ______________________________________________

Permanent Address: ___________________________________________________

________________________________________________________

Date of Birth: (Day/Month/Year) _________________________________________

Marital Status: ____________________   

Emergency Contact (EC) Person Name, Relation & Cell No

___________________________________________

Emergency Contact (EC) Person Name , Relation & Contract No in Dhaka: ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­-

_____________________________________________________________________

FOR OFFICE USE ONLY

Unit  
Department  
Section  

                                                                                       ___________________________                                                                                                                                                                              Signature of Employee

Advantage of Backup plan:

Help for smooth execution during absence of key position.

Reduce miscommunication/ malfunctioning facts to others department. Others departments
            can communicate easily for any kind of emergence.

Sometimes this system can reduce hamper to Buyer’s/ Vendors/ service provider/ others in
            terms of various communication fact during absence of key position.

Sub-ordinates can’t be misguided during absence of key position.

Course : Research Methods                                             Submit by : September 07, 2012

1. Cite practical examples of multistage sampling.  
2. Janata Bank Ltd. would like to select 200 depositors who opened accounts in the said bank during the last two years. The depositors can be divided into four strata according to their occupations with stratum sizes N1=6,000, N2= 4,000, N3= 3,000,  N4=2,000. The respective standard deviations are: δ1=210, δ2=130, δ3= 302, and δ4= 175. Further, the sampling cost for each unit is Tk. 8. How a sample size of 200 should be allocated to four strata with (a) proportional allotment; and (b) optimal allotment.  
Question: 3 Mention the appropriate scale as well as logic for the following statements:      (a) The coordinator of CEMBA/CEMPA programme, Dhaka RRC has advised the students to make registration in order to select 10 students as per first come first serve basis for appointing with vice chancellor at BOU main campus.     (b)   A six member admission committee of CEMBA/CEMPA programme would be formed as per seniority of the faculty members at the School of Business, BOU. Answer: (a) Statement: The coordinator of CEMBA/CEMPA programme, Dhaka RRC has advised the students to make registration in order to select 10 students as per first come first serve basis for appointing with vice chancellor at BOU main campus. The above statement is falling into Nominal scale. The nominal scale simply allows the categorization of the responses into mutually exclusive categories. There is no relationship between categories, implying that there is no ranking or ordering. The typical application of nominal scale is in classification of responses by social class, “like” or “dislike”, “yes” or “no”, sex and so on. The statistical operation possible for nominally scaled data is counting only. From the above logic we can sees the similarities with the statement. So we can say it is a nominal scale. (b) Statement: A six member admission committee of CEMBA/CEMPA programme would be formed as per seniority of the faculty members at the School of Business, BOU   The above statement is falling into ordinal scale. The ordinal scale allows the respondent to rank some alternatives by some common variables. Here it is feasible for a user of the product/service to the best to worst. However the amount of difference between ranks cannot be found but it is only possible to compute positional statistical measures like median and mode for such data.   From the above logic we found similarities with questioned statement. So we can say that it is an ordinal scale.      
Rope Length and Cycle Time Calculation Process

Rope Length and Cycle Time Calculation Process

ROPE LENGTH :

  • Rope length in meter   = Fabric Weight / Weight per running meter
  • = Wt in kg*1000*100 / GSM*width in inch*2.54*2(tubular fabric)
  • = Wt in kg*1000*100 / GSM*width in inch*2.54(Open Width fabric)
  • = Wt in kg*1000*100 / GSM*width in centimeter*2(tubular fabric)
  • =             Wt in Kg*100000 / GSM*Width in Centimeter (for open width fabric)

REEL SPEED:

Reel speed       = Rope Length / Cycle Time . Read more about Chemical Consumption for Dyeing Fabric

CYCLE TIME:

Cycle time depends on dyestuff. For turquoise ( Blue 21) and R ( Sp) ( Blue 19) dyes I recommend cycle time 2.0 min and for other dyes I recommend 2.5 min. sss

MAXIMUM LOADING:

Max loading in Kgs = Rope Length ( in mtr)* GSMWidth in Inch2.54*2(for tubular)/ 100000

= Reel Speed*Cycle Time*GSM*Width in Inch*2.54*2(for tubular) / 100000

End of rope length article