Achieving business target. trainee workers are doing overtime
Ensure excellent customer service.
Ensure product display. no proper performance evaluation system for trainee workers, e.g. trainee period is extended without proper evaluation
Maintaining shop cleanliness. mothers are not allowed to go to child care centre at any time
Factory did not maintain benefit register properly e.g. need authority’s signature in payment voucher. Ensuring and monitoring staff attendance.
Maintaining shop opening and closing balance.
Evaluate shop attendant performance. factory does not have worker’s participation and welfare fund to share profit with the workers
Maintain an updated stock register book.
Give product knowledge to the shop attendant.
Deposit to daily sales to Bank.
Prepare sales statement and submit to A/C dept.
Prepare to petty cash statement.
Prevent shop lifting. not all workers are participating in relevant insurance schemes, such as retirement, illness or injury, disability caused by work related injury, or occupational disease, unemployment, child-bearing
Managing product stock and maintain report.
Ensure FIFO (First in and first out) in product performance .(120 day’s method)
Fast moving, slow moving and non moving product status.
Ensure maintenance of equipment such as computer, AC, UPS, and printer in the shop.
Ensure security of the shop from extortion, fire hazard.
Update monthly employee attendance report and leave status report.
Regular professional contact with reporting person.
Working Environment
waste contractors who collect the waste and dispose of it have no licence
waste not sold to a legal authority
waste not identified, segregated and labelled by type and hazard (e.g. plastics, cotton, electrical wastage, polythene etc.)
waste not stored in an allocated & appropriate area that avoids fire, spills or infestation
factory does not have a waste inventory and tracking system
no noise level assessment carried out in the factory, no system in place
factory does not have an inventory of & registered air emission sources incl. prevention and protection technical data and information
air emission units not registered and not regularly inspected, relevant documentation not available
factory has not obtained relevant consent orders from the pollution control board to operate (e.g. for air, water etc.)(India)
no EIA conducted and no EIA approval obtained environmental authority (China)
workers, cleaners and wastage loaders are not properly trained on waste handling, wastage identification, labelling and disposal
Garments Merchandiser Job To build up a carrier in garments based organization which provides the opportunity to share my knowledge ,experience and academic skills for the entire development of the organization and to coupe up myself with the real working environment. We sale RMG Online CRM System. Top CRM Software
Find out color breakdown form order sheet
Find out Fabric consumption for fabric and accessories .
Making requirement sheet Fabrics and accessories for order
Making cost statement sheet for suppliers.
Making initial cost breakdown for Fabrics and Accessories
To contact with Suppliers for Access. And Fabrics booking .
To contact with Suppliers in-house these items with in lead time
To give Carton and Poly booking for order
To give Space Booking for shipment goods .
Dealing with BUYER such as i)Soccer- “UMBRO” (items: woven long Pant , Woven Trouser) ii)WMM –(Mark Wearehouse) : Rib stop pant , 210t jacket. Dealing with local buyer as given : i)TEXEBO INT’AL, ii)DSL
To corresponding with Exquisite in Hon Kong BUYER By mail Such as SUMS CLUB order ( To pack Flannel Pant , Wahi pant etc.and dealing also this order .
Follow-up order from sample development to shipment (Do Costing to quote to buyer, communicate with supplier to negotiate & fix the prices of materials & also arrange materials & give the guide line to factory concern person where needed to follow-up the production to give the shipment smoothly.
To corresponding with Buyer for given best garments price quotation.
To corresponding with buyer by email for approved Trim and Lab dip.
To corresponding with suppliers for given booking and in-house this items with in lead time.
To corresponding with Buyer for approved sample such as Fit/stylying,proto,salesmen ship,pp sample.
To corresponding with buyer for approved shipping marks .
To corresponding with Buyer for proper decision for making shipment
Corresponding & communicate with Buyers.
Liaised with buyer & supplier and negotiated prices, cost break down pre-checking & deliveries and quality parameters according to the required specification.
Proto- sample to Pre- production samples send to the buyer for approval.
Follow up factory production like, knitting, dyeing, sewing & packing.
Follow up shipment schedule for in time delivery. Buyers: Outerstuff (USA), Customer: Wal-Mart, K-Mart, Gap,Departments: Men’s, Ladies & Kids, Brand: Reebok, Adidas, NBA, NFL, Old Navy, Area: Both Knit & Woven
Item: T-shirt, Polo shirt, Cheerleader, Jog pant, Jog Suit, Jacket, Widnsuit etc.
Cost analysis and price quotation to develop business with new customers.
Local and overseas supplier sourcing.
PI verification with budgeted cost.
Order and production follow up.
Run a merchandising team of 12 members and report to MD.
Cost analysis and price quotation. Develop samples.
Have to source local and overseas suppliers.
Order and production follow up.
Direct corresponding with buyer of UK.
Run an individual account and report to Managing Director.
Conclusion
Garments Merchandiser Job differ factory to factory. To utilize educational knowledge in garment sector as a textile engineer. Since garment is the finished product of textile so I can imply my knowledge of textile on garment. To set up my career in a well organized company to reach my goal in the field of merchandising by utilizing my experiences, honesty and headwork. And I want to be a successful Director of Merchandising in an established company.
Importance of Supply Chain Management – I would like to explain, to the best of my ability, the rationale behind my decision to study for the master program in International Logistics and Importance of Supply Chain Management at Jonkoping University, Sweden for the autumn 2016 intake. I am drawing my particulars as below for your attention and kind consideration. We provide 10 Top Supply Chain Management Software with Analysis …
Buyer actively takes part in global governmental security programmes, currently in the “Customs-Trade Partnership Against Terrorism C-TPAT” in the USA and in the “Authorized Economic Operator in Europe. I have sincerely studied a diverse range of subjects. I studied at Asian University of Bangladesh (AUB) and obtained Bachelor of Arts (B.A) in English which was four- year integrated Honors program and Master of Arts (M.A) in English one year and Master of Business Administration (MBA) majoring HRM two- year program where the medium of instruction for all these programs were fully in English. Furthermore, It may be mentioned here that I have five business research articles which have been published in different National (One article) and International (Four articles) Journal(s) on different titled. Throughout my academic life, I have enjoyed and performed very well. The objective is to ensure minimum standards for security in the Buyer and in its business partner’s organisation.
In respect of compliance
with basic requirements to security in the supply chain and to recognition in
respective existing and coming programmes, Buyer is obligated to collect and
provide information about own security measures in place and also about
security situation at its supplier.
I am currently working in a legendary private group of company named “ASQ Group” since 1st February 2008 to till date as a “Senior Officer, Shipping & Logistics Department”. My major job responsibilities are; to maintain all sorts of shipping & logistics related issue which to be considered as international logistics and supply chain management.
In this period, I have observed that it is impossible to reach a corporate managerial position. This is because, I have recently decided to pursue a foreign degree (Master) in International Logistics andImportance of Supply Chain Management from your University considering my present job as well as future endeavor. My trust is to study the Master program in International Logistics and Supply Chain Management at Jonkoping University colors me for a range of roles in business and career in corporate managerial level. As the university has authentic and expert teaching staff, they will help me develop the skills
For demonstration of actual
standards for security in different areas at supplier’s organisation Buyer provides
the following documents that are connected to this Commitment and that must be
filled in by the supplier:
Foreign Manufacturer Questionnaire,
Supplier Assessment Questionnaire,
Risk Assessment Business Partner.
The appendices comprise basic requirements to security and the predominant majority is quite naturally. In case of insufficient standards Buyer will ask for implementation of measures to reach minimum standards.
I hope university will provide me with an understanding of
the business world as well as offering me a wide range of choices and
connections after the completion of my program. I know the program is unique in
that it offers a cross-disciplinary education, combining the core topics of
logistics and supply chain management with marketing, and economic geography. I
will be able to gain deep theoretical knowledge and understanding of the supply
chain network and its development and be able to prepare myself for
international business and career. I hope this will give me the highest levels
of tuition and top-quality education. The decision to pursue a Master in International
Logistics & Supply Chain Management is an important step in realizing my
life ambitions.
In addition to this, with a solid grounding on my current employment history and previous academic credential, I am well-equipped to commence my Master program as well as higher studies in International Logistics & Supply Chain Management at Jonkoping University. I hope that you will analyze this piece carefully enough to offer me a place with waver of Masters in Importance of Supply Chain Management at your University, and trust that you have yet to witness the bigger picture of me.
International Logistics and Supply Chain Management is a globally recognized qualification. I strongly believe that, if I successfully complete my program, it will ensure the highest professional standard of my knowledge and skills. I also believe that, the degree will enhance my reputation, strengthen my position in the marketplace and deliver added value to my business and career. At a later step in the process Buyer will also conduct another inspection of security standards without announcement.
Buyer will analyse the responses to the documents and randomly verify supplier’s information provided during a subsequent and announced inspection. .My ultimate ambition for the future is to become an International Businessman or to hold a corporate management position in any multinational company anywhere in the world.
Conclusion
Thank you for your attention and kind consideration. I am looking forward to hearing your acceptance about Importance of Supply Chain Management . The goal is to establish a smooth and secure cargo flow from the place of production and shipping at the supplier up to the points of final destination at Buyer. The implementation and maintenance of appropriate measures for security will lead to recognition of Buyer and its supplier as reliable business partners and facilitate free cross border trade.
Head of Marketing Job Description to know the customer, customer listing, visiting and existing customer handling and time to time follow up, sample collection and development, order collection and order sheet making, Proforma Invoice (PI) making LC collection from the customer and acceptance, UD & UP collection, always communication to the factory and time to time customer. Care about delivery lead-time, sales accounting, outstanding accounting, interdepartmental recovery process payment recovery policy, always sales planning etc. We provide BOM Management Software
Designing an effective marketing plan to ensure the product’s/ service’s success in the market and support the continuous growth of the company.
To Lead the Marketing Team.
Meet up sales targets and prepare sales forecasts.
Ensure regular and appropriate presence of Dhaka Phone’s Brands.
Monitor and report competitor’s activities.
To provide Fruitful services to the traders and focus the dynamic mage of the company.
Assist Sales Manager in establishing the Area Sales and Revenue targets, Key strategies and financial budget for approval by the Head Office.
Establish individual sales and promotional targets of the field staff and formulate a sales operational plan for review and approval by the Sales Manager.
Monitor the performance of the field staff through extensive visit to outlets and health providers, checking of DCR’s and provide on the job training as needed.
When requested by Sales Manager, Marketing Managers or Departmental Head’s organize and arrange training programs for BS Providers, non-pharmacy OCP outlets, Doctor’s seminar etc.
Assist Sales Manager and Marketing Department in identifying field level promotional activities and implement and monitor their impact.
Provide monthly, quarterly and annual sales reports to Sales Manager and Departmental Head.
Organized and preside over the monthly Area Conference, review sales performance, counsel and motivate sales staff and take corrective action when needed.
Organized and conduct NGO workers and TBA training program.
Reviewed and approve itinerary, expense bills, Per Diem, leave etc. of all Area officials.
Perform other duties from time to time as requested by the supervisor.
Build up excellent trade relation with business people.
To prepare and submit report as required.
Develop promotion materials.
Identify marketing initiatives through customer research, develop, targeting and segmentation planning.
Communicate with the executive and dealers.
Arrange different seminars, conference & present feedback report.
Communicate with the media sector
Achieve monthly/annual sales target.
Motive and inspire the sales executive to gear towards market dominance.
Assist the training and administrative work.
Take up regular field visits to ensure implementation of the marketing plan with a view to attain sales growth of the product.
Ensuring visibility and merchandising of the company’s brands.
Selling process, determined demand, regular follow up and monitoring of the fieldwork.
Formulating new marketing plan and implementation.
Providing customer services and maintaining trade relationship.
To make coordination with Monno’s sales centers & show rooms activities.
Working with and through the distributor’s sales force to achieve targets.
Preparing and implementation of marketing plan for commercial success.
Conclusion
Head of Marketing Job Description -Vast knowledge in Microsoft Operating System 98, 2000, XP & Microsoft Office Package and e-mail and Internet operations. Interne setup & Maintenance. To build up a challenging and rewarding career in organization that provides structured career advancement with the extent of competitive opportunities with self-confidence, hardworking and synergic ability and desired satisfaction.
Shirt Size Chart for Developed Sample – The purpose of this procedure is to ensure that any potential problems relating to the cutting and manufacturing of a style is eliminated prior to bulk production …
It is the responsibility of the Pattern Technical Manager to ensure the implementation of this procedure. If the first fit sample is rejected the garment must be remade with all the necessary corrections done. After the fit sample is approved by a buyer, the pre-production sample must be made using all the actual fabrics and trims.
Sl
MEASUREMENTS
Size 06
Size09
Size 12
Size 18
Size 24
Size 36
A
LENGTH FROM SHOULDER
31
33
35
37
39
41
B
CHEST WIDTH
25
26.5
28
29
30
31
C
CHEST WIDTH (1/2 ARMHOLE)
20.5
21.5
22.5
23.5
24.5
25.5
D
HEM WIDTH
27
28
29
30
31
32
E
BACK WIDTH
22
23
24
25
26
27
F
BACK WIDTH (1/2 ARMHOLE)
21.5
22.5
23.5
24.5
25.5
26.5
G
SHOULDER LENGTH
5.2
5.5
5.7
6
6.2
6.5
H
SLEEVE LENGTH + CUFF
22
24
26
28
30
32
I
INNER SLEEVE LENGTH+ CUFF
16
17.5
19
20.5
22
23.5
J
CUFF LENGTH
3
3
3.5
3.5
4
4
K
SLEEVE WIDTH
10
10.5
10.5
11
11.5
12
L
SLEEVE WIDTH (ABOVE CUFF)
7.5
7.5
8
8
8.5
8.5
M
SLEEVE OPENING
6
6
6.5
6.5
7
7
N
ARMHOLE
11
11.5
12.2
13
13.7
14.5
O
COLLAR LENGTH
28.5
29.5
30.5
31.5
32.5
33.5
P
COLLAR WIDTH
4
4
5
5
5.5
5.5
Q
COLLAR POINT WIDTH
4
4
4.5
4.5
5
5
R
PLACKET LENGTH
11
11
11
12
12
12
S
PLACKET WIDTH
2.5
2.5
2.5
2.5
2.5
2.5
T
SLIT LENGTH
2.5
2.5
2.5
3
3
3
BACK NECK DROP
1.7
1.7
1.7
2
2
2
Shirt Size Chart for Developed Sample
Manufacturing Process Test
Procedure
After the sealing process a test lot is automatically put into work at a point outlined on the Business Critical Path. Where there is a requirement for a specific size in a test lot, this is advised by Head Office. The manufacturing units procedure for test lot now comes into effect:
Technical Team process the test lot in sample room. Size of test lot is not specific but must be to specify sizes. It must also be constructed using the correct fabric, components and specified machinery / guides. (Where this is not possible the head office will give authorisation).
Sewing the lab test sample and sending it to an independent laboratory (test house). The sample garment must meet minimum performance standards to ensure the product is suitable for customers use. Team, who contribute to the test lot, will prepare the package (Methods, Quality specs, Set up the machine line).
As per the requirement Technical Department should make the Contract Seal garments, Concept Samples, Wearer Trials.
Also technical assistant will check the garments, get the measurements on each garment and recorded in the Fit Log sheet.
Once the pre-production sample is approved by a buyer, the sealed sample must be sent to the garments production factory along with graded pattern and CAD marker. On complete the reports are forwarded to the garment technical manager along with the garments each requested size for review.
Also any further pattern alteration need according to the measurement out come of the test lot will be do before send the pilot pattern to the factory.
When received the approved contract seal from, Pattern Technical Manager should call a meeting including following team to review the test lot.
During this meeting following packages will hand over to the production by relevant departments. GSD Sewing Methods: by Industrial Engineering
Quality Specifications for each operation: by Quality Assurance Department
Sewing the first fit sample; fitting the garment on a model or a dummy, and sending the first fit sample to the buyer. Technical Pack (including Operation breakdown, Size chart, How to measure diagram, CMS labelling information, Off machine measurements…etc) : by Technical Department
Sample types
They mostly make the samples which are as follows:
Quotation sample.
Style sample.
Fit sample.
Size set sample.
Counter sample.
Pre-production sample.
Production sample.
Photo sample.
Proto sample.
Shipment sample.
Key areas under scrutiny are:
Making pattern correction based on buyer’s comments. Handling Method achievability.
Method is suet to achieve the customer requirement.
Sewing the production size-set sample using all the actual fabrics and trims. If there is embroidery or print on the garment, approved artwork design must be followed strictly. Measurements.
Any amendments to achieve the size chart.
Machine requirements /Guide for pilot / bulk production.
Embroidery or print placement must be marked. Wastage ex: elastic
Key Quality Points.
Minutes from the meeting will be generated and document is going to factory style file.
NOTE: The approval of the test lot authorises the cutting instruction to be released for the pilot production.