What is Equalization Tank in Wastewater Treatment Plant

What is Equalization Tank in Wastewater Treatment Plant

Equalization Tank

Effluent from the collection tank comes to the equalization tank in wastewater treatment. The main function is to act as buffer. To collect the incoming raw effluent that comes at widely fluctuating rates and position to the rest of the ETP at steady ( Average ) flow rate. During the peak hours ETP comes at high flow rate. The equalization tank stores this effluent and lets it out during  the non peak time when there is no /little incoming effluent. The inlet pipe of equalization tank carries filtered effluent from cooling tower. The effluent NPSH lifting pumps move the effluent to the EC SKID.

  • The delivery pipe takes the effluent to the EC SKID.
  • The coarse bubble diffusers are short length of tubes that have holes at regular spacing .they release large bubbles in the tank to lightly aerate the effluent and also to agitate the mix continuously.
  • Compressed air from blower s through this air supply pipe line. This may be rigid pipe line.
  • inlet pipe line 2.collection tank  3.raw effluent lift sump . 4. delivery pipe 5.coarse bubble diffuser 6.air supply pipe line.

Equalization Tank Operation And Maintenance

  • Keep air mixing on at all times.
  • Ensure that the air flow /mixing is uniform over the entire floor of the tank. Adjust the placement of diffusers and the air- flow rate needed.
  • Keep the equalization tank in wastewater treatment nearly empty before the expected peak load hours (otherwise it will over flow)
  • Check and clean clogged diffusers at regular intervals.
  • Manually evacuate settled much/sediments at least once in a year.

Equalization Tank Trouble Shooting

 S.NOProblemsCause
1Insufficient mixing/aerationPoor maintenance of diffuser cleaning and blower maintenance
2Excessive odorInsufficient air supply, poor maintenance and operation
3Insufficient capacity to handle peak flowsConstant outflow pumping, do not maintained.
4Usable capacity reduced due to solids accumulationPoor maintenance.

Construction of coarse bubble diffusers  in equalization tank.

  • If keeps the raw effluent aerated thereby avoiding septicity  and suppressing odor generation.
  • If keeps said in suspension and prevents setting of said in the tank ,thereby reducing frequency
  • Of manual  cleaning of the tank.
  • If membrane diffusers are used ,they will fail frequently, due to the repeated cycles expansion  and contraction caused by fluctuating water levels in the equalization tank. there fore only coarse bubble diffusers must be used in the equalization tank in wastewater treatment.

Equalization Tank Maintenance

  • PUMPS : 2.SUCTION PIPE : 3 .DELIVERY PIPE 4.BYEPASS LINE: 5. VALVES :
  • switch between the main and standby pump (every 4 hrs approximately).
  • Check oil in the pump every day. Top up if necessary.
  • Check motor to pump alignment after every dismantling operation.
  • Check condition of coupling and replace damaged parts immediately.
  • Check for vibration and tighten the anchor bolts and other fasteners.
  • Check condition of bearing ,oil seals, mechanical seal and replaced if necessary.
  • Completely drain outoil and replace afresh as per manufactures recommendation.
  • Always keep safety guard in its proper position.
  • Follow the LOTO safety principle while performing maintenance activities.
Equalization Tank Maintenance
Equalization Tank

Maine use of Equalization tank

  • To reduce the temperature in Equalization tank
  • For homogeneous mixing
  • To give the optimum dosing of HCl for neutralizing
  • To increase the Bacteria growth in FBBR
  • To reduce the insoluble BOD and COD in the System
  • To avoided the solids cloaking in the air distribution system in Equalization tank
  • To increase the air volume in equalization tank in wastewater treatment
  • To remove the odor in Equalization tank due to anaerobic reaction
  • To increase the efficiency of Biological system
  • To reduce the current and electrode consumption in EC system

List of civil tank dimension

Collection tank  (1.5 m* 1.5 m* 1.5 m).

Equalization tank in wastewater treatment (3.6 m* 3.6* 2.4m).

Biological tanks for Activated Sludge Process  (3.0* 3.0* 2.4m).

Flash mixer (0.9*0.9* 1.2m).

HRSCC (3.6 * 3.3 * 2.4m).

Filter  Feed  Tank ((3.0 *3.0*2.4 m).

Sand filter (dia 1.8 m* 2.1 m).

Sludge thickener tank ( dia 1.5 m * 2.4 m).

IMPORTANT PROCESS PARAMTERS

  • Ph
  • Total dissloved solids(tds)
  • Color
  • Temperature
  • Dissloved oxygen (do)
  • Mixed liquor suspended solids (mlss)
  • Constant feed flow (biological process)
  • Total suspented solids(tss)
  • Bod
  • Cod
  • Nurients requirment
  • Pva content

Sampling points

  • Equlization tank
  • Biological process
  • Ec feed
  • Ec out
  • Sand filter out
  • Post areation tank

Test equipments

  • tds meter
  • ph meter.
  • Turbidity meter.
  • Cod skid.
  • Spectro photo meter.
  • Magnetic stirrer
  • Weighing balance
  • Jar test (flacculator)
  • Distillation unit (dm water preparation)
  • Titration equipments (pipette, buratte, conical flask, chemicals).

Internal Test

  • Equlization tank: raw efrfluent
  • Test : ph, tds, tss,hardness, frc,cod,bod,color,turbidity, pva content,
  • Biological process:
  • Test : ph,do, turbidity, cod, bod, mlss, sv- 30, svi, frc,temperaure.
  • Ec feed (biological outlet ):
  • Test : ph, tds, turbidity,color, cod , hardness, tss.
  • Sand filter feed (ec out)
  • Test :ph, cod, tss, turbidity,tds, color.
  • Post areation ( sandfilter  out)
  • Test : tds,cod, ph, bod, tss, color, do,temperature, turbidity.
  • Filter press : dry sludge
  • Test : ph, moisture content , densidy.

External Test

Three months once

  • sampling point :equliation tank, biological outlet, ec out, post atreation out : test – cod, ph, tss,tds,bod
  • Filter press (dry sludge ); test : moisture content, volatile matter, toxicity, density, ph.

Emfm meter postion

  • Equlization tank (bio feed )
  • Ec feed
  • psf out (ec out)

Log sheets

  • Elctro coagulation sheet(daily log sheet)
  • Etp labanalysis.
  • Management checking list( lab report).
  • Maintenace activities.
  • Weekly report (qty treated record).
  • cost analysis report (monthly report).
  • Etp maintenance chart

Monitoring and control

  • hree months once external lab test  report (all parameter -pollution board requirements)
  • Every day sludge genration record.
  • Monthly sludge genration record.
  • Yearly sludge storage record.
  • 6 months once air stock monitaring analysis report(bioler, power house(dg ), etp in and out area,sludge storage area).
  • Yeraly environmental statement record.
  • yearly once external lab test report (dry slduge)
  • Slf (secured land filling) diagram
  • Etp plant layout(pi&pid ).
  • mass balace chart.
  • Msds of all etp handling materils.
  • safe operation :
  • Without authorized person do not change in the Electrical panel
  • All the pumps ,motors and Blowers give ground EARTH connection
  • When cleaning process of filter press and EC skid use safety dress.
  • When cleaning process switch off the EC skid power.
  • Always follow the instruction manual of equalization tank in wastewater treatment process

Conclusion

  • Before handling ETP chemical ,Must wear safety equipments like  gloves,  shoes, mask, etc.
  • Must identified Hazardous ,non hazardous chemical list.
  • Every one Follow 5 ‘S RULES.
  • Must identified high electrical power (Danger symbol )equipments.
  • EC process must wear shoes, gloves and mask.
  • Must Identified All civil tank dimension.
  • Maintenance period of equalization tank in wastewater treatment must follow LOTO procedure.
Equipment List of Common Effluent Treatment Plant in Textile Industry

Equipment List of Common Effluent Treatment Plant in Textile Industry

What is Effluent Treatment Plant

ETP is stand for Effluent Treatment Plant. It is used in sewerage and wastewater system. ETPS is very important for Garments and Textile Industry. ETP purify waste water comes from different industry like textile, garments, ternary, pharmaceuticals etc. The industrial effluent treatment plants involve different stages of treatment including physio chemical treatment and biological treatment flowed by tertiary treatment. ETP reduce the cost of environmental control, the principal activities undertaken by Ministry of Environment and Forest consist of protection of environment, in the framework of egislations directed by the United Nations Environment program (UNEP)

Equipment’s List

Flow Chart of ETPS: 

The flowchart of etps are given below-

Textile/Chemical/Ternary Industry etc

Bar Screen

Collection Tank

Process House

Equalization Tank

Neutralization

Chemical coagulation

Biological Oxidation Tank

Flash Mixer with Polymer

Settling and Separation of Sludge with pressure

Filtration

Treated water to discharge

List of Equipment for Common Effluent Treatment Plant :

  • Bar screen
  • Collection Tank cistern
  • Equalization Tank
  • Flash Mixer with Polymer
  • Biological Oxidation Tank

Bar Screen :

Bar screen are very well matched for removing suspended and floating coarse from wastewater such as weed, reed and rags. Bar screen is first step of etps – effluent water treatment process.

bar screens
Bar Screen

Feature of Bar Screens:

  1. Heavy accumulation of screening managed easily water pollution,
  2. No moving parts permanently under sewerage
  3. It is the process of cistern,
  4. Confident engineering use bar screens
  5. All unit easily accessible for lubrication of bar screens.

Collection Tank:

It is primary tank where wastewater stored from different section like dyeing, washing, knitting, finishing etc. Wastewater treatment plant is same meaning of effluent water treatment process.

collecton tank of effluent treatment plant in textile industry
Collecton tank

Equalization Tank for Effluent Treatment Plant in Textile Industry : 

After primary mixing, the liquor passes to equalization tank by mixing of effluent from various process takes place

etps Equalization tank
Equalization tank

Polymer Mixing Systems :

In flash mixer alum works upon sludge so that postponed solids settle down in etps. A polymeric material having a large number ion exchange sites. Generally polymer mixer is general system which is used in ETPs as flocculants and on some occasions as coagulants. Polymer mixing systems can be classified in 3 types e.g. cationic, anionic and nonionic polymer mixer.

Biological Oxidation Tank:

biological oxidiation
oxidiation

Echo system installed here. It is the last process of biological oxidation. ETP system use biological oxidation system, physical and chemical treatment process. Industrial water treatment and water recovery  is the process for good environment.

ANNEXURE 1 TO PI NUMBER CEPL/BD/ATL/01 DATED

S.NoDescriptionquantityBRAND
 Acid dosing pump of PP construction2 nos (1W + 1S)SURYA
 Fine Bubble Vertical Diffusers.600 nosIFU, GERMANY
 FBBR Random Bio-Media30m3CONFIDENT
 Effluent Feed Pumps (With motor and accessories)2 nos. (1W + 1S)JOHNSON / KIRLOSKAR
 Secondary Clarifier Mechanism and FRP Well.1 setCONFIDENT
 Sludge Re-Circulation Pump.2 (1W +1S)JOHNSON / KIRLOSKAR
 Motorised Rotary Bar Screen2 Nos.CONFIDENT
 Motors for Blowers5 nosELGI / KIRLOSKAR
 Electro coagulation skid3 nos (2W + 1S)CONFIDENT
 Polymer dosing pump of PP construction2 nos (1W + 1S)SURYA
 Flash mixer1 setBONFIGLIOLI
 Effluent Feed Pumps4 nos (2W +2S)JOHNSON / KIRLOSKAR
 HRSC Clarifier Mechanism and FRP well.1 setCONFIDENT
 Screw pump2 nos.HYDRO PROKAV
 Filter press1 no.HYDRO PRESS
 PH indicator & controller1 no.COUNTRONICS
 Level controller4 nosMINILEC
 Temperature indicator2 nosSELECTRON
 On-Line DO meter1 noINSTRONIX
 Inverter for Effluent Pumps2 nosYASKAWA
 Inverter for Aeration tank Blowers2 nosYASKAWA
 Lab Accessories1 setREPUTED
 Digital TDS meter1 noREPUTED
 Digital Portable pH Meter1 noREPUTED
 Digital Portable DO Meter1 noREPUTED
 PIPE LINES, VALVES AND ACCESSORIES ASSORTED
27.ETP panel with PLC and D.C. pulse Power controller from CROSBY Controls, UK., Inverters and control Accessories. 3 setsCONFIDENT

 

CROSBY, SCHNEIDER, IDEC, SIEMENS

Screw press dewatering is better than general effluent treatment plan.