Melt Index Tester
- Outlet diameter of Melt Index Tester : Φ 2.095 ± 0.005 mm, discharge port length: 8.000 ± 0.025 mm Loading cylinder diameter: Φ 9.550 ± 0.025 mm, loading cylinder length: 152 ± 0.1 mm Piston rod head diameter: 9.475 ± 0.015 mm, piston rod head length: 6.350 ± 0.100 mm
 - standard test load (a total of 8 full weight)
 - the temperature range: conventional room temperature – 400 ℃ (500 ℃ optional)
 - constant temperature accuracy: ± 0.5 ℃
 - display resolution: 0.1 ℃
 - cut material: optional manual or automatic cutting material
 - temperature recovery time: less than 4 minutes
 - print: micro-printer automatically print output
 - the power supply voltage: AC220V ± 10% 50HZ
 
You can read more tester Flex Durability Fatigue Tester
Compliance – Wages and Benefits
- factory does not maintain copy of wage records of contracted security guards for wage verification worker’s grade and salary breakdown not maintained in salary sheet and appointment letter
 - worker’s contracts do not state termination conditions, working hour, OT compensation, leave information, salary grade
 - workers do not get copy of their contract
 - OT allowance payment for weekend day work and OT payment on other days not in writing, e.g. not mentioned in pay slip, salary sheet, contract and/or factory regulations.
 - workers don’t receive detailed pay slips that include regular working hours, OT and excessive OT or don’t receive pay slips at all
 - counter copy of wage slip does not mention OT hours
 - insufficient coverage of social insurance, such as pension, medical, maternity, unemployment and industry injury insurance (to cover all employees)
 - group insurance has expired
 - not all workers are participating in relevant insurance schemes, such as retirement, illness or injury, disability caused by work related injury, or occupational disease, unemployment, child-bearing
 - factory does not have worker’s participation and welfare fund to share profit with the workers
 - factory did not maintain benefit register properly e.g. need authority’s signature in payment voucher
 - mothers are not allowed to go to child care centre at any time
 - no proper performance evaluation system for trainee workers, e.g. trainee period is extended without proper evaluation
 - trainee workers are doing overtime
 
				
												
Trackbacks/Pingbacks