Standard Hours of Works

Standard Hours of Works

Standard

Contractor must have a system to ensure compliance with legally mandated hours of work; must ensure that overtime is used only when each employee is compensated according to local laws; and must ensure that each employee is informed at the time of hiring if mandatory overtime is a condition of employment.  Where local limits for regular and overtime work per week are less than 60 hours, the contractor must follow those limits.  Where such limits are greater than 60 hours, every hour worked above 60 hours must be voluntary as evidenced by the employee’s signature not less than once each week indicating a desire to work the additional hours.

Requirements

Regular Work Hours

Contractor must comply with local regulations for regular work hours.  Contractor must provide a mechanical or electronic time-keeping system for employees to record their work hours and must retain those records for a minimum of twelve months.

Overtime

If overtime is mandatory, each employee must be informed of this policy at the time of hiring.  Total work hours including overtime must not be required in excess of the local labor laws or 60 hours per week on a regularly scheduled basis, whichever is lower.

If local labor laws allow the contractor to apply for special permission for employees to work additional hours beyond those regularly permitted, the contractor must obtain the permit and post it in the workplace.

Auto  limit for hours of work is no more than 60 hours per week on a regularly scheduled basis, which means no more than 25% of any 12-week period, and due to extraordinary circumstances*.

Under extraordinary circumstances*, when hours of work exceed 60 per week, the contractor must obtain each employee’s signature on a weekly basis, stating that he or she understands the difference between mandatory and voluntary overtime and that he or she voluntarily chooses to work more than 60 hours in that particular week.

Extraordinary circumstances are defined as situations that are outside the control of the contractor (i.e., power is shut off by city, contractor has a flood or some other disaster, etc.) and do not include situations where the contractor must work to complete orders that exceeded their 60 hour/week capacity or capacity which meets lower overtime limits as mandated by local law.

Days Off

Every employee should receive at least one day off in seven on a regularly scheduled basis, which is defined as at least 75% of the weeks in any 12-week period.  Whenever possible the day off should be scheduled on the same day of the week so that the employee can plan for that day of rest.  If the day of rest is changed with less than one day’s (24 hours) prior notice that day should be paid as a regular rest day, if in accordance with local labor law.  Under extraordinary circumstances, when the regular day off is worked, contractors must obtain each employee’s signature stating that he or she understands the difference between mandatory and voluntary overtime and that he or she voluntarily chooses to work this time.

Exemptions

Where exemptions to the local overtime regulations are needed and where it is legal to do so, a contractor may apply for such allowances with prior written approval from the Nike Compliance Manager.  Once Nike approval is granted, contractor must complete the following steps:

Receive written, official approval from local labor authority

Have a system in place to ensure additional overtime work is voluntary

Obtain each employee’s signature, on a weekly basis, stating that he or she understands the difference between mandatory and voluntary overtime

Maintain a copy of  Auto  written approval on file

Overtime Wages

All overtime must be paid in accordance with local labor laws.  (See Nike Standard on Wage.)

Document Retention

All time keeping records, time cards and other accounting documents must be retained on the contractor premises for a minimum of twelve months.

What is CNC Lathe Machine For Textile and Garment Factory

CNC Lathe Machine

Specification:

a. Maximum Swing Diameter: 400 ~ 550 mm
b. Maximum Turning Diameter: 250 ~ 400 mm
c. Maximum Turning length: 500 ~750 mm
d. Stroke X/Y/Z: X = 200 ~ 275/ Y = (+40/-40), Z = 500~750 mm
e. Rapid Speed X/Y/Z:X =12~24, Z = 24~30 M/min
f. Cutting Speed: To be mentioned
g. Hydraulic/Programmable Tail Stock with foot paddle switch: To be Mentioned
h. Chips conveyer with chips cart: Attached with machine Standard
j. Spindle:
(1) Max Rotation Speed: 4000 ~ 7500 rpm
(2) Chuck Size: Ø 210 ~ 300 mm
k. Tail Stock:
(1) Taper: MK4/equivalent
l. Turret:
(1) Number of Tools (minimum):12
(2) Tools Location : VDI 30/VDI 40/equivalent
(3) Number of Live Tools (min.):12
(4) Max. Rotation Speed: 4000 ~ 7500 rpm
m. Control System (CNC Type):Latest version of FANUC/ Siemens/HAAS
n. Hydraulic System:
(1) Operation pressure: To be mentioned
(2) Oil Capacity of tank: To be mentioned
p. Hydraulic/Pneumatic System: To be mentioned
q. Power supply: 380~400 V, 3 ph, 50 HZ
r. Available of Integral of ON Line Automatic Voltage Regulator (AVR): To be mentioned separately with KVA. Price to be
Mentioned separately.
s. On line diagnosis and troubleshooting option: To be
mentioned in details with price separately
t. Following Spares/equivalent items must be supplied with
each machine:
(1) Sleeve for holding tool (Morse Taper #1 & #2):05+05= 10
Nos.
(2) VDI 30 Radial & Axial Live tool Holder (for Drilling):03+03= 06 Nos.
(3) VDI 30 tool Holder Drilling:05 Nos.
(4) VDI 30 tool Holder for Turning Left & Right:08+02=10 Nos.
(5) Insert Holder for Turning (Left Hand), Model (DDJNL 1616H11):10 Nos.

(6) Insert Holder for Turning (Right Hand), Model (DDJNR 1616H11):03 Nos.
(7) Insert Holder for Turning (Left Hand), Model (SDJCL 1616H11):10 Nos.
(8) Insert Holder for Turning (Right Hand), Model (SDJCR 1616H11):03 Nos.
(9) Insert for Turning Insert Holder, Model (DNMG 110408- pm 4325):100 Nos.
(10) Insert for Turning Insert Holder, Model (DCMT 11T 304- pm 4325):100 Nos.
(11) Bearing for Tail Stock: 02 Set
(12) Bearing for Lead Screw: 02 Set
(13) Water Gun:01 Nos
(14) Hard Jaw (Auto Block):02 Set (each set Contain 3 Nos)
(15) Soft Jaw (Auto Block):04 Set (each set Contain 3 Nos)
(16) Spring Collet (Ø1 ~Ø20) mm: 02 Set (each set Contain 20 Pcs.)
Country of Origin
Country of Assembly
Port of shipment
Country of manufacture & Name of Manufacture
Country of Main Component (All Servo motors, Spindle Motor, Control system including servo drives & Monitor(HMI), Hydraulic Pump, Lead Screw, Main body, Tool Magazine, Pneumatic actuators, Vector drive (if avail) and electronics
PCB cards)

CNC Lathe Machine Conditions:
a. All axes must be integral to the machine, no attachment to be used as any axis.
b. Machine must be able to perform flowing operations: (1) Turning, (2) Drilling, (3) Reaming etc.
c. All accessories, attachments, tools, cutter, fixture etc required to perform the above mentioned job to be supplied and mentioned with price in offer.
d. Automatic Chip Rimming System with conveyer belt/screw type Must be provided with each machine (Price of conveyer belt/screw type should be quoted separately).
e. Standard cooling, lighting, lubricating & control system (Software & Hardware) should be provided with machine.
f. 1 x Operators manual and programming manual (Hard & Soft Copy) in English must be supplied with each machine.
g. 1 x Maintenance/Repair manual (Hard & Soft Copy) in English (including electrical/electronic circuit diagram, mechanical drawing Etc.) Must be supplied with each machine.
h. The supplier should give service support for ten years after installation of machine.
j. Local Training: Duration of training should be at least 16 working days. Following information must be given as under :

Training Schedule of CNC Lathe Machine:

a. Machine Operators Training :

08 working Days

  • Machine operation, maintenance, trouble shooting and repair training : 08 working days

Topics of CNC Lathe Machine:

  • Details operation of electrical, electronics, pneumatic system, hydraulic system and mechanical system with diagrams in details
    • Control system: program loading and unloading, debugging, editing and servo drive and servo motors interconnecting and parameter setting in details.
    • Troubleshooting: Artificial problems to be created by removing sensors and changing the parameters of servo drive and servo motors then faults diagnosis and repair procedures.
k. Machine installation, trial run and operational with maintenance, training is to be provided by the certified engineers’ of machine manufacturer at BOF site within 30 days after receiving Machine by BOF. Otherwise penalty will be imposed at the rate of 2% (Two) but not less than 1% (One) and will not exceed 10% (Ten) of the total LC value.
l. Pre-shipment Inspection (PSI): PSI of the machine will be Carried out by 03 BOF persons for 04 working days (excluding journey period). All cost of the PSI to be borne by BOF.
m. Warranty for one year after acceptance.
n. Fast and slow moving spares with quoted price are to be given with the tender including yearly escalation minimum for ten years.
p. Certificate of Mother factory of country of origin must be submitted with the offer.
q.    Each tool holder should have one full set of tools with the machine. Price of full set of tools must be mentioned separately.
r. All drives and Motors should be of same Control System.
s. Prices of essential spares for each machine must be quoted separately along with price escalation for 10 years
t. If any component/part of the machine is from the country other than the machine manufacturing country then the name of the Country (which also must be of group ‘A’ country) must be mentioned with the component/part.

We are a Manufacturer of all Types N95 Respirators

N95 Respirators

Dear Sir/Madam,

We are a professional manufacturer of all types of non woven products in Bangladesh. We specialize in three series of products including disposable medical consumables, industrial personal protective equipment, and beauty salon disposable products such as face maskand N95 respirators.
Weve got trade licenses for face masks and N95 respirators. And now we have enough stock.
Please call me if you need face mask and N95 respirators.

Cloth Mask 

We supply all kinds of cloth mask  with good quality , Our production of masks has
been put into use in this new pneumonia epidemic. Now the development of the global epidemic is getting more and more
serious, and the demand for masks is increasing.

We try our best to provide the source for customers who need masks.

AMK Disposable Medical Surgical Mask

Unit PriceUSD x.xx/pcs
Amount(/bag)10 pcs/bag
Amount(/box)50 pcs/box
Amount(/carton)2000 pcx/carton
Carton Size55x45x60 cm
Weight8KG/carton
StatusIn STOCK
Volume(per carton)0.15
Chargeable by Courier30 kgs
Chargeable by Air25 kgs
Courier fee Door to Door(Less than 8000 Units)USD 100+USD 35  per kg
Min order 2000 units by CourierAround USD 1150
(1 carton/0.15cbm/30 kgs)USD 0.58 per unit
By Air +100KGS(Door to Airport)Around USD 2500

AMK KN95

Unit PriceUSD x.xx/pcs
Amount(/bag)10 pcs/bag
Amount(/box)50 pcs/box
Amount(/carton)2000 pcx/carton
Carton Size70x30x50 cm
Weight9 KG/carton
StatusIn STOCK
Volume(per carton)0.11
Chargeable by Courier21 kgs
Chargeable by Air17.5 kgs
Courier fee Door to Door(Less than 12000 Units)USD 100+USD 35  per kg
Min order 2000 units by CourierAround USD 1150
(1 carton/0.11cbm/21 kgs)USD 0.42 per unit
By Air +100KGS(Door to Airport)Around USD 2625
(12000 Units/6 cartons/0.6cbm/105 kgUSD 0.22 per unit

Medical Masks.

We are in Medical equipment and devices llines.. And now, we could offer the following medical products:

1. Masks;

2. protective products;

3. melt-blown non-woven fabric for medical masks.

4. Central oxygen supply system and purification equipment.

And if you have any related requirements, please do not feel hesitant to contact us.  

Tip for Mask purchase:

  1. Above Mask is FOB Dhaka Bangladesh airport have more CAO /Charter flight resource than other mainland airport,  if you purchase EXW / FOB Dhaka Bangladesh,  you have to wait for the flight space for more than one week.
  2. if you purchase a mask from Dhaka Bangladesh mainland,  you need to check the location of the factory,  since you might have consider the inland transportation cost and also the transport time, it will take 2-5 days.
  3. Form 1st Apr,  Dhaka Bangladesh government carried out more strict measurement to inspect all Medical supply export shipment to ensure it is good quality,  many Mask manufacturer without proper medical supply export license or permit is not allowed to export any more.
  4. To sum up,  our Mask is Free to go in Dhaka Bangladesh , outside Dhaka Bangladesh mainland,  you don’t have worry tips 123,  and our mask ready to go,  top quality,  the most important thing than price. 
  5. Upon payment,  we  will book the flight space immediately, once space is confirmed,   closely connection form our Dhaka Bangladesh  warehouse to HKG airport within one hour driving.  
  6. That is our advantage , and the reason to purchase our constant mask stock in Dhaka Bangladesh


Best & Rgds

Mashiur

Commercial Building Cost Estimator with Materials

Commercial Building Cost Estimator

Commercial Building Cost Estimator is very important for the owners. Without budget the building owner count huge cost. Any way we are showing below some example

Tinset Building Cost Estimator for Boundary

Mistri Mansur: 140 Tk Square Fit, Wall: 9Fx10F (A2Z), Bricks: 1 Gari = 3000, Tanki 7F/10F

Mistri Leon: 240 Tk Square Fit, Wall: (A2Z)

Building Cost Estimator for Boundary

This low range cost estimator is show below for 30′ X 34′ space

DateItem Name and DescriptionQtyCost (bdt)
01/02/20Boundary Bricks 157312584
01/02/20 Sands 1/21200
01/02/20 Bricks and Sand Caring from RoadN/A2200
01/02/20 Labor N/A3500
01/02/20 Donate to Other N/A700
01/02/20 Cement 52150
TotalTotalN/A

Building Cost Estimator for 2 Room (Labor)

Date MistriQtyTakaRoomDescription 
18/5/18Head Mistri1500Room 1n
18/5/18Support Mistri1500Room 1n
29/5/18Head Mistri1550Room 1n
29/5/18Support Mistri2750Room 1n
30/5/18Head Mistri1550Room 1n
30/5/18Support Mistri2750Room 1n
31/5/18Head Mistri1550Room 1n
31/5/18Support Mistri1400Room 1n
1/6/2018Head Mistri1550Room 1Batch
1/6/2018Support Mistri31100Room 1Batch
2/6/2018Head Mistri1550Room 1n
2/6/2018Support Mistri2750Room 1n
3/6/2018Head Mistri1550Room 1n
3/6/2018Support Mistri2750Room 1n
4/6/2018Head Mistri1550Room 1n
4/6/2018Support Mistri1750Room 1n
5/6/2018Head Mistri1550Room 1n
5/6/2018Support Mistri2750Room 1n
6/6/2018Head Mistri1550Room 1n
6/6/2018Support Mistri2750Room 1n
7/6/2018Head Mistri1550Room 1n
7/6/2018Support Mistri2750Room 1n
8/6/2018Head Mistri1550Room 12 colanm dhalay
8/6/2018Support Mistri1400Room 12 colanm dhalay
9/6/2018Head Mistri1550Room 12 colanm dhalay
9/6/2018Support Mistri1350Room 12 colanm dhalay
19/6/18Other2700Room 1Mati Vhora
20/6/18Other1400Room 1Mati gorto
10/7/2018Head Mistri1550Room 2mati
10/7/2018Support Mistri1400Room 2mati
11/7/2018Head Mistri1550Room 2khacha
11/7/2018Support Mistri1400Room 2khacha
12/7/2018Head Mistri1550Room 2kolam
12/7/2018Support Mistri1400Room 2kolam
13/7/18Head Mistri1550Room 2mati
13/7/18Support Mistri2750Room 2mati
14/7/18Head Mistri1550Room 2Batch
14/7/18Support Mistri2750Room 2Batch
15/7/18Head Mistri1550Room 2Short colom
15/7/18Support Mistri2750Room 2Short colom
18/7/18Head Mistri1550Room 2Rod Kata Gread Beam
18/7/18Support Mistri2750Room 2Rod Kata Gread Beam
18/7/18Other Labor2500Room 1Mati Vhora
19/7/18Head Mistri1550Room 2Centaring
19/7/18Support Mistri2750Room 2Centaring
20/7/18Head Mistri1550Room 2Beam Dhalay
20/7/18Support Mistri2750Room 2Beam Dhalay
21/7/18Head Mistri1550Room 2Gatni
21/7/18Support Mistri2750Room 2 Gatni
6/8/2018Head Mistri1550Room2kolam
6/8/2018Support Mistri2750Room2kolam
7/8/2018Head Mistri1550Room2kolam
7/8/2018Support Mistri2750Room2kolam
8/8/2018Head Mistri1550Room1Gatni
8/8/2018Support Mistri2750Room1Gatni
9/8/2018Head Mistri1550RoomGatni
9/8/2018Support Mistri2750RoomGatni
10/8/2018Head Mistri1550RoomGatni
10/8/2018Support Mistri2750RoomGatni
11/8/2018Head Mistri1550Room Gatni
11/8/2018Support Mistri2750RoomGatni
12/8/2018Head Mistri1550RoomGatni
12/8/2018Support Mistri2750RoomGatni
13/8/18Head Mistri1550RoomGatni
13/8/18Support Mistri2750RoomGatni
14/8/18Head Mistri1550RoomNilton Centaring
14/8/18Support Mistri2750RoomNilton Centaring
15/8/18Head Mistri1550RoomNilton Centaring
15/8/18Support Mistri2750RoomNilton Centaring
16/8/18Head Mistri1550RoomNilton Rod
16/8/18Support Mistri2750RoomNilton Rod
17/8/18Head Mistri1550RoomNilton Dhalai
17/8/18Support Mistri2750RoomNilton Dhalai
19/8/18Head Mistri1550RoomGatni
19/8/18Support Mistri2750RoomGatni
20/8/18Head Mistri1550RoomGatni
20/08/18Support Mistri2750RoomGatni
21/8/18Head Mistri1550RoomGatni
21/8/18Support Mistri2750RoomGatni
Other Other 01500
Total50300

Main Material of a Building

DateProductsQuantityPriceTotal Price
27/5/18Rod 5″4′384/66625383
27/5/18Rod 3′83/8625195
3/6/2018Rod 5″74664884
3/6/2018Rod 8ml28/2661861
8/6/2018Rod 8ml29/8641907
8/6/2018Tarkata4 Kg80320
1/6/2018Belcha1 Pics350350
1/6/2018Balti1 Pics180180
1/6/2018Tin006500
1/6/2018Simenter Khuti6 Pics Pics2950
SabekCement6 Bag4902940
8/6/2018Cement3 Bag4901407
31/05/18Cement12 Bag4905880
25/5/18Khua150 Feet03000
25/5/18Briks1000016000
25/5/18GI Tar n0120
25/5/18Lohan090
25/5/18Bladen0500
19/6/18Kath Rentn04100
19/6/18Bit Sand1 Hidrolik15001500
1/6/2018Sand1 Hidrolik35003500
1/6/2018Sand50 Feet03800
2/6/2018Pinn0100
2/6/2018pvln0500
27/5/18Guna3 Kg0325
8/6/2018Guna1 Kg 250M137137
20/6/18Briks1000010000
29/6/18Cement44801920
29/6/18Rod 16mn6311504
29/6/18Rod 12ml 8mln633326
29/6/18Khua150 Feet00
14/7/18Polithin30 Feet15150
14/7/18Chot10 Gauge50500
14/7/18Rod16 Ml676311
14/7/18Cement7 Bag4903430
15/7/18Bit Sand1 Hidrolik16001600
18/7/18Tarkata1 Pkt00
18/7/18Chock1 Pkt00
4/8/2018Briks2000 pcs010000
19/6/18Kath RentRoom202000
6/8/2018Cement10 Bag4804800
6/8/2018Sand1 Hidrolik30003000
12/8/2018TarkataRoom300300
14/8/18CementRoom4904900
14/8/18Rod 8mlRoom631285
14/8/18Rod 10 mlRoom631965
15/8/18TubewelTotal Parts42604260
15/8/18Newspaper2 kg3060
15/8/18Van Vara100100100
16/8/18Tubewel Mistri26001200
21/8/18Gas Chulann4100
22/8/18Pvl Labrnn1000
24/8/18Electric Partsnn931
24/8/18Kath 7-Sep5503960
25/8/18Tin Screwnn453
26/8/18Tinn2615500
26/8/18Kathn550638
26/8/18Van Varann700
26/8/18Satar Advancenn10000
27/8/18Sutar nn4000
27/10/18Briksnn10000

Bricks Calculation

4/8/2018Briks2000 pcs010000
20/6/18Briks1000010000
25/5/18Khua150 Feet03000
25/5/18Briks1000016000
27/10/18Briksnn10000
29/6/18Khua150 Feet00

Standard Birth Room Costing

DateProductQuantityPriceTotal
05/07/20Bricks 1400800012000
07/07/20Sand2 Toli13002600
10/07/20Cement144306020
12/07/20Rod40Kg20002000
15/07/20Con. LaborContact1670016700
17/07/20Pipe LaborContact33003300
18/07/20Tiles LaborContact35003500
20/07/20Sanitary ItemAll93009300
20/07/20Tiles ItemAll96009600
21/07/20Sanitary ItemAll1165511655
21/07/20Sanitary ItemAll10001000
22/07/20Kua21 Part1202600
23/07/20Soil Labor1600600
24/07/20Cement 54302150
25/07/20Cement74303010
26/07/20OthersAll10001000
27/07/20Van RentAll800800
TotalTotalTotalAll88035
Best Misting Fan for Outdoor Cooling System

Best Misting Fan for Outdoor Cooling System

Best Misting Fan

We can also use our best misting fan and misting system to cool down athletic sporting events… at every level, from professional sports to college, and even high school and private events. There is a wide range of misting equipment, systems and configurations to choose from, meeting the needs of your particular Outdoor Cooling System sporting event

Outdoor Cooling System

Many People are unable to enjoy their yard or patio in summer. Our misting system can lower temp.by 10-12°C Outdoor Cooling System & indoor without wetting principle of working of textair centralize fogging system. 1) Water is forced at high pressure through special ant droplet nozzle with 0.1,0.5,0.2 mm orifice forming a fine fog like mist with billions of microscopic droplets. 2) When water droplets evaporate changing from liquid to gas the surrounding air cools, Millions or these droplets are evaporating every second. This tiny droplet Quickly absorb heat present in environment & evaporate hence the air will cool down. 3) you will feel chill or comfort when breeze strike your skin. This cooling is due to evaporative cooling 4) Low pressure system creates large, heavier droplets that drops to ground, wetting people & surrounding with minimal cooling. In contrast TEXT-AIR high pressure nozzle creates fine mist droplets that flash evaporate & cool the air instantly

Industrial Cooling

Water fogging system are installed for conditioning of large indoor area in industries. This can reduce enormous power consumed for air conditioning of large area. Air conditioning of large industrial warehouses, including those which need to operate with open doors and windows is possible with misting system. Misting systems becomes ideal for cooling large areas like industrial sheds, cotton / linen storage godown, garages, workshops or stadium for play ground or to dissipate high heat emissions from industrial processes like foundries, textile spinning and weaving mills

Principal

Evaporative cooling is responsible for the chill you feel when a breeze strikes your skin. The air evaporates the water on your skin, with your body heat providing the energy. By forcing water, by means of a high pressure pump, through our specially designed misting nozzles, we create a fog made by ultra fine water droplets with an average size of less than 10 microns. These tiny water droplets quickly absorb the energy (heat) present in the environment and evaporate, becoming water vapor (gas). The energy (heat) used to change the water to gas is eliminated from the environment, hence the air is cooled.

Industrial Cooling with Misting

Misting systems are installed with enormous advantages for air-conditioning of large indoor areas due to high benefits and reduced energy consumption. Create a safer and more productive working environment. Cooling employees, equipment and processes can lead to happier employees and big profits. Cooler workers are safer and more productive. Cooler machines last longer and can produce more. Many processes that need cooling can be speeded up using mist cooling. Air conditioning of large industrial warehouses, including those which need to operate with open doors and windows, was until now impossible with conventional systems. Today, however, misting systems becomes ideal for cooling large areas (industrial sheds, garages, workshops) or to dissipate high heat emissions from industrial processes (foundries, machinery). Cooling effect can also be combined with humidity control to increase productivity in specific industries (paper, wood, textiles). Water is sprayed under pressure by special patented nozzles capable of generating very fine droplets, of less than 10 microns, which are immediately absorbed by the air without wetting surfaces and objects below. The results are significant: low cost of installation and operation, immediately effective, cooling effect is located only in areas of interest, possibility of installation in an enclosed, semi-open and open environment. COSTS Important aspect of misting systems are highly limited costs if compared to traditional industrial air conditioning. Installation is easy and fast since systems are supplied in modular kit, with polyamide tubing and quick couplings. Or misting systems are for Outdoor Cooling System

Garment Production Planning Meeting Minutes Specifications

Garment Production Planning Meeting Minutes Specifications

Garment Production Planning

  • Mr. ZZZ  started with a proposal of introducing Fabric Team for fabric procurement to achieve better supply chain correspond regarding fabric issue. It can be maintain by Production Planning Software. aaa
  • He also talked about Garment Production Planning schedule & later on adjustment due to difference between actual & virtual quantity.
  • Some of the fabric issue was resolved after previous meeting, but still problem with TCNS buyer’s fabric is still there.  
  • Mending issue for fabric came as a vital point which became a headache for the factory concern & identified as a major barrier for on time flawless shipment.
  • Some accessories & finishing rework issues were identified which was creating difficult situation for the factory.
  • Lack of space in finishing space creating problem to store finished goods (due to advance production).
  • Proper breakdown of order sheet required for hustle free assortment in production & packing. (specially for Perry Ellis)
  • Decrease of production efficiency has been identified due to lack of order.
  • Discussion began with same mending issue but at a different perspective, as Mr. MMM believes it is a lot safer to mend fabric before going for cutting or production as Mr. LLL preferred mending on finished garments. 
  • Delay in fabric delivery by local mills . Often they delay to give their opinion how they will resolve fabric defect which cause us shipment delay.
  • Accessories are not being received on given time.  He mentioned some merchandisers place booking of finishing item very lately which causes difficulties to execute consignment in due time.
  • Order crisis in factory  resulting decrease in efficiency.
  • Thread inhouse issue creating production delay.
  • Thread issue will be solved within very short he mentioned but adding another note on thread issue, he mentioned to get thread approval before getting PP sample approval.
  • In reply to factory concern on advance production issue, he mentioned in some cases an order contains several PO & some of them have delay shipment date but to achieve pick Garment Production Planning efficiency production is done in one shot.
  • Mr. HHH started with reply to grumbles against factory , as he mentioned most of the cases they don’t get wash standard to follow to achieve desired wash quality. Moreover for delayed delivery of goods  caused by buying office as they don’t provide wash approval on time. Some  reasonable time is required to execute an order but in most of the cases they don’t get enough time.
  • Mr. XXX gave his observation on meeting as he appreciated everyone for their open discussion. In his observation factory need some improvement in their supply chain & technical dept. An internal team of expert team he proposed can be introduced to resolve the technical issue of Garment Production Planning