What is Alcohol Wear Testing Machine ? How Does it Works?

What is Alcohol Wear Testing Machine ? How Does it Works?

What is Alcohol Wear Testing Machine? How Does it Works?

  • Alcohol Wear Testing Machine test station: two
  • load: 50 ~ 1000g
  • travel: 10 ~ 60mm (manually adjustable)
  • speed: 5 ~ 60 times / min (knob adjustment, LCD
  • display)
  • Counter: 0 ~ 99999999 times (presettable, LCD
  • display)
  • load weight: 50,100,200,300,500g each 2
  • friction medium: standard cotton cloth, eraser, a
  • Chinese 2B pencil two
  • alcohol or other liquid friction rule: two
  • eraser rubbing stencil: two
  • pencil rubbing rule: two
  • size (L × W × H): 500 × 450 × 600mm …

Chemicla Nature

  • chemicals are not labelled with warning sign/safety label (i.e. alcohol, scrap oil, solvents) and are not segregated and stored safely
  • Chemical Consumption for dyeing machine
  • chemicals not stored in secondary container (e.g. diesel oil drums, chemical containers in spot removal rooms, chemical storage area of washing section)
  • child care room found near generator room causing excessive noise levels
  • amount of toilets/urinals per male and female workers is not as per law. no doors or curtains at toilet cubicles to ensure privacy
  • detergents of washing plant stored at goods in storage area, should be kept in laundry area or other safe, separate location
  • diesel barrels are kept without protection
  • No exhaust fan at spot removal room or common chemical store room
  • no MSDS displayed where chemicals are stored and used (chemical store room, spot removal room)
  • no spot cleaning room (there should be one for each finishing section)
  • No water connection at eye wash station
  • PPE missing in chemical store
  • spot cleaning room found not fully covered (no door or door open during working hours)
  • spot cleaning rooms without eye wash station (wash basin) and proper ventilation
  • spot removing operator not aware of hazards of spot removing agents

Specification of abrasion testing machine

  • Counter: adjustable 0-99999999 times
  • Round-trip: 0 – 60 times (adjustable)
  • Friction distance: 10mm – 50mm can be adjusted freely
  • Test bar can be adjusted up and down the required istance
  • Size: 63x45x37 (LxWxH) cm
  • Accessories:
  • Test rod 75 g ± 1 2 sticks
  • Rub the head of alcohol 11 ∮ 2 sticks
  • Weight 500 grams, 200 grams, 100 grams, 50 grams, 25 grams, 20 grams, 10 rams each two 2 pieces of sandpaper, 1 brush, a set of tools

Steel Ball Drop Impact Test Machine Specification and Description

Steel Ball Drop Impact Test Machine Specification and Description

Steel ball drop impact test machine

Steel ball drop impact test machine Falling height: 0-2000mm adjustable
Control method: DC electromagnetic control
Ball weight: 55 64 110 255 535g
Power: 220V, 50HZ, 2A
Impact Testing Machine Size: about 50 * 50 * 220cm
Weight: about 25kg

Other Machinery

  • Single needle lock stitch
  • Single needle lock stitch
  • Single needle chain stitch
  • Two needle lock stitch
  • Two needle chain stitch
  • Over lock
  • Multi needle chain stitch
  • Feed off the arm
  • Button stitch
  • Button hole
  • Bar tack
  • Snap button
  • Zigzag stitch
  • Saddle stitch
  • Blind stitch
  • Collar forming
  • Collar btm cutting
  • Collar turning
  • Fusing
  • Front plkt. fusing
  • Sleeve plkt. forming
  • Cloth Cutting
  • Band knife
  • Cloth drill
  • Neck press
  • Auto. strapping
  • Thread sucker
  • Boiler
  • Generator
  • Compressor
  • Die cutting
  • Fabric inspection
  • NEEDLE DETECTOR MACHINE
  • FIRE PUMP MACHINE
  • HI SPEED MAYA COMPUTERISE EMBRODERY
  • MOTOR POWER SAVING MACHINE
  • ELECTRONIC LOOKSTITCH BUTTON/SEWING HOLDER
  • CLOTH DRYER + SLITTING MACHINE
  • SPOT LIGHTFAN LAMP + FAN HEAT EXCHANFE
  • HYDROLIC EXTRACTOR + BLOWN LINE MACHINE
  • AIR DRYER COMPRESSED
  • GENERATOR SET
  • SPARE PARTS OF STEAM BOILER
  • CURING OVEN MACHAINE BAG/HANGER MACKING
  • DRYERS MACHINE
  • STEAM IRON INDUSTRIAL
  • FUSING PRESS MACHINE
  • MACHINE FINGERLES
  • SINGLE FACER & FLUTE
  • WINDING/REELING MACHINE
  • SOFTNER TREATMENT PLANT
  • SPAN FIXING MACHINE
  • TRIMMING MACHINE THREAD, WIRE CRINKLE
  • DRILL MACHIE CLOTH
  • INSPECTION MACHINE CLOTH
  • FOLDING MACHINE
  • STRAPPING MACHINE
  • INDUSTRIAL EXHAUST FAN
  • BOLTSEAL/CABLE CONTRAINER LOCK
  • TWO NEEDLE CHAINSTITCH M/C
  • PIN TUCK (25 NEEDLE)
  • PIN TUCK (12 NEEDLE)
  • MULTINEEDLE CHAINSTITCH M/C
  • FEED OFF THE ARM
  • BUTTON HOLE M/C
  • BUTTON SEWING M/C
  • AUTO. STRAPPING M/C
  • BARCODE ATTACH M/C
  • CONE WINDER
  • COLLAR TURNING M/C
  • INTERLINING STRIPPING M/C
  • SPOT WELDING M/C
  • BOILER
  • BUTTON TESTING SOLUTION
  • INTER LOCK FLAT BED
  • PF-PULLAR
  • RIBBON CUTTING M/C
  • LIGHT BOX
  • GSM TESTING M/C
  • NUMBERING M/C
  • BAR TACK M/C
  • PIN HOLE M/C
  • ZIG-ZAG STITCHING M/C
  • SADDLE STITCH M/C
  • BLIND STITCH M/C
  • COLLAR BOTTOM CUTTING M/C
  • COLLAR FORMING M/C
  • STRAIGHT KNIFE CUTTING M/C
  • BAND KNIFE CUTTING M/C
  • CLOTH DRILL M/C
  • DIE CUTTING M/C
  • FUSING M/C
  • FUSING M/C
  • SIDE SEAM FUSING M/C
  • FRONT PLACKET FUSING M/C
  • ARM HOLE FUSING M/C
  • SLEEVE PLACKET FORMING M/C
  • NECK PRESS M/C
  • FABRIC INSPECTION M/C
  • METAL DETECTOR M/C
  • HAND HELD NEEDLE DETECTOR
  • THREAD SUCKER M/C
  • GENERATOR
  • SNAP BUTTON M/C
  • END CUTTER M/C
  • COMPRESSOR
Industrial Engineer Duties and Job

Industrial Engineer Duties and Job

Industrial Engineer Duties

Industrial Engineer Duties – Make the operation bulletin. Make the Line Layout. Setup the Manpower. Setup the Machineries. Setup the Machine attachment guide, folder  and others. Pre -production Plan for Line. Line Target fix up. Improve the Line monitoring system. Improve the quality monitoring system. Improve the I.E Monitoring system. Improve the supervisor & Line Chief Monitoring system. We also sale Employee Management System Software Free/ Premium

Industrial Engineer Duties List

  • Implement the “Work measurement and Productivity Evaluation” systems, to know the currant level of performance (Baseline), and provides proposal where it should be with the current resources and implement it.
  • Implement the “Motion and Method study” systems, to simplify and reduce the time of process to effectiveness and cost reduction.
  • Practice the “Cross Functional Approach” to identify and remove the process barriers.
  • Track the Progress through Measurements in the BRT (Barrier removing team) and CFT (Cross functional team), to achieve the improvements (Initial Entitlement
  • Involving day-to-day line balancing due to absenteeism.
  • Conducting operator training program & providing training manual
  • raining activities test papers etc.
  • Maintain operator-grading system.
  • Maintain operator skill inventory.
  • Conducting operator motivation program.
  • Doing activity sampling.
  • Implement new work study
  • Prepare factory daily schedule.
  • Follow up the factory production and efficiency.
  • Calculate cost per minute.
  • Find out style SMV by time study.
  • Maintain the schedule of Industrial engineering department.
  • Production planning and control.
  • Solve the bottle neck problem.
  • Improve the individual process production.
  • 10. Prepare necessary reports of Industrial engineering department.
  • Analysis the existing lay out
  • 2.Capacity study
  • Find out the capacity gap
  • Do the activities sampling for sewing percentage.
  • Production flow up in bottleneck operation.
  • Method study
  • Find out the method gap.
  • Incentive scheme based on individual efficiency.
  • SWOT analysis
  • Productivity improvement project on RMG factory
  • Supervise factory efficiency
  • Improve the operation target
  • Find out the bottle neck operation line
  • Study the production skill assessment of the operator
  • Method engineering.
  • Identify the best method of doing the job.
  • Reduce the fatigue of the workers by avoiding unnecessary movements.
  • Improve productivity that is more valuable output from every unit of input (money, Time Land & energy)
  • Improve utilization of recourses (Man, Method, Materials & Machines)
  • Provide opportunity to achieve maximum results with minimum effort.
  • Help train operator by standardizing methods.
  • Quotation making and dispatching
  • Order receiving and schedule preparing
  • Shipment schedule preparing
  • Preparing production planning and executing in floor
  • Making correspondence to home and abroad
  • Assembly line balancing
  • Machine wise manpower setting
  • Work method and process development
  • Wastage reduction and productivity improvement
  • Selection of new equipment to reduce production time and improve process
  • Proper operation of sewing m/c, heat cutting m/c, automatic and semi-automatic machines to ensure product quality
  • Responsible for cutting section
  • Man and machine allocation as per requirement of job
  • Job scheduling according to emergency
  • Work method and process development
  • Wastage reduction and productivity improvement
  • Have to communicate with other Departments for smooth flow of operation
  • Proper operation of straight knife, vane knife and spreader to ensure product quality
  • Preparation of isometric drawing, orthographic views and detail working drawings of product.
  • Preparation of production planning documents.
  • Machine wise manpower planning and work scheduling.
  • Designing and manufacturing of system furniture as per the layout approved by customer.
  • Man management and quality assurance.
  • New ideas to product improvement and documentation making.
  • Study operation and find out bottle neck
  • Assembly line balancing
  • Initiate JIT production
  • Productivity Analysis and improvement.
  • Production planning using ERP Software (SAP).
  • Production Management
  • Technical and Mechanical assistance for Production Floor
  • 3M (man-machine-material) management for optimum productivity.
  • Productivity Analysis and improvement.
  • Production Planning.
  • Production Management.
  • Production and Layout Design and Line Balancing.
  • Quality Control.
  • Sewing Research and Development.
  • Technical and Mechanical assistance for Production Floor.
  • Machine Promotional Activities.
  • Inventory Planning.
  • Supply Chain Management.
  • Holding International Seminar Frequently.
  • Holding Factory Study; In-house Training & Seminar; Yearly open Seminar Nationally.
  • Market Research and feedback R&D team for product development.
  • Production Planning & Controlling.
  • Make Garment’s Operation Breakdown.
  • Machine Layout Setup by Work Study System.
  • Line Balancing System Setup.
  • Find out Garments SMV
  • Set Target (Line + Factory).
  • Efficiency calculation (Line, Factory Cutting & Finishing with Incentive Bonus System)
  • Production & Manpower Evaluation.
  • Garment’s Costing Find out.
  • Break Even Efficiency Find out.
  • Garments Consumption.
  • Method of manufacturing.
  • Method Improvement for Reduce Unnecessary Working Hours & Hand Workers.
  • Arrangement of Plant And Machinery.
  • Arrangement of Work Station.
  • Proper Uses of Equipments.
  • Time Study.
  • Activities Sampling.
  • Analysis of Past Records & Improvement.
  • Find out Bottle Neck & Solution.
  • Find out Cutting & Finishing S.M.V Efficiency Report, Make Layout & Set Target.
  • Quality Controlling.

Conclusion

Industrial Engineer Duties are to Find out the bottleneck operation and improve it. Guidance about Line blanching and improve the production. Alert to maintenance for machine breakdown & instruction to improvement. Improve the floor & Line in varmint. Improve the Cutting, Sewing  & Finishing productivity. Improve worker-recruiting system. Efficiency & Non productive time monitoring in the Factory.

Chemical Consumption for Dyeing Fabric

Chemical consumption

Chemical consumption are the main ingredients used with dyes and auxiliaries means the aids or helper to get better results like levelness, adsorption, crease free and other quality parameters. But WATER (H2O) is the important  ingredient needed in all dyeing…

  • We can say that we save 55 lac BDT for last seven month as compared with previous year. We Sale Clothing Inventory Management Software ERP for Sale
  • 2019 January to July dyes chemicals cost= 64899261.0 Tk, Production= 1908754.0 Kg
  • 2020 January to July dyes chemicals cost= 59391698.0 Tk, Production=2192949.0 Kg
  • Switch off the power when not in use. Total production increased=284195.0 kg
  • Lab. Dyeing machines must not be operated without cooling water. Production Increased=16.58 %
  • Considering product mix we can say productivity increased= 16.58 %
  • Total cost decreased=5507563.0 Tk
  • Cost decreased= 17.22 %
  • Consumption on sales’2009= 9.09%
  • Consumption on sales ‘2010=7.84 %( updated 29.07.2010)
  • Net savings = 5507563.0 Tk (for last seven months)
  • Gross savings= (5507563+ 1602859) = 7110422.0 Tk (because production increased= 16.58 %)

L : R    1 : 8

600C Dyeing

CIBA f/w % <  0.3 0.3 – 0.5 0.5 – 1.0 1.0 – 2.0 2.0 – 3.0 > 3.0
Salt g/l 10 20 30 40 50 60
Soda ash g/l 5 5 7.5 10 5 5
NaOH (50%) g/l nil nil nil nil 0.3 0.5
Cibacel DBC g/l 1-1.5 1.0-1.5 1.0 1.0 1.0 1.0
Anti-crease g/l 1.0 1.0 1.0 1.0 1.0 1.0

L : R    1 : 8

600C Dyeing

Levafix % <  0.2 0.2 – 1.0 1.0-2.0 2.0-3.0 3.0-5.0 >5
Salt g/l 10 20 30 40 50-60 80
Soda ash     (no NaOH) g/l 2 5 8 10 10 12
NaOH (50%)    (no soda ash) g/l   0.3 0.7 0.9 1.2 1.4
Cibacel DBC g/l 1-1.5 1.0-1.5 1.0 1.0 1.0 1.0
Anti-crease g/l 1.0 1.0 1.0 1.0 1.0 1.0

L: R  1: 8

600C Dyeing

Remazol % <0.2 0.2-0.5 0.5-1.0 1.0-20 2.0-3.0 3.0-5.0 >5.0
salt g/l 10 20 30 40 50 60 80
Soda ash g/l 5 5 7.5 10 5 5 5
NaOH(50%) g/l nil nil nil nil 0.5 0.5 0.7
Dekol S g/l 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Anti crease g/l 1.0 1.0 1.0 1.0 1.0 1.0 1.0

L: R  1 : 8

820C Dyeing

Procion % <  0.5 0.5- 1.0 1.0-1.5 1.5-2.0 2.0-2.5 >2.5
Salt g/l 30 60 60 70 80 90
Soda ash g/l 5 10 15 15 15 20
Dekol S g/l 1.0 1.0 1.0 1.0 1.0 1.0
Anti crease g/l 1.0 1.0 1.0 1.0 1.0 1.0

L : R    1:8

920C Dyeing

Procion % <  0.5 0.5- 1.0 1.0-1.5 1.5-2.0 2.0-2.5 >2.5
Salt g/l 40 60 70 80 90 90
Soda ash g/l 10 10 15 15 15 20
Dekol S g/l 1.0 1.0 1.0 1.0 1.0 1.0
Anti crease g/l 1.0 1.0 1.0 1.0 1.0 1.0

Buyer Questionary for a Factory

  • Does factory have safe chemicals usage? (provide Oeko Tex )
  • Does factory maintain Lab test?
  • Does factory have available fire equipment?
  • First Aid kits are sufficient?
  • Environmental Management
  • Are all evacuation route marked clearly?
  • Is there found any necked cable?
  • Are all safety issues of cutting /sewing/ finishing/ washing/ printing followed?
  • Keep the working area, machine, and everything always clean. Put everything in its proper place and have a proper place for everything. Does factory maintain updated photograph on each section for fire fighters & rescue team?
  • Does factory maintain a tracker for recording of production activity including chemical usage per style/ date of production for easier tracking system?
  • Does factory provide proper instruction for safety equipment usage?
  • Are workers regularly trained on the usage of PPE?
  • Does factory provide training on Fire / first aid?
  • Does factory provide Health & Safety Awareness training?
  • Emergency exit sign are sufficient?
  • Does factory have written standard operating procedure/ work instruction?
  • Does factory post sign of personnel protective usage?
  • Is there sign of no smoking?
  • Is there sign of high voltage?
  • Are there signs for occupational health & safety awareness?
  • Does factory have emergency team?
  • Are there sufficient rubber mat for Ironman?
  • Does factory conduct Fire drill on monthly basis?
  • Does factory checked fire equipment regularly?
  • Does factory have proper waste water treatment? (proved with independent lab analysis)
  • Is the fire alarm active?
  • Does factory have sufficient Eye Washer?
  • Does factory have License from government?
  • Does factory have proper collecting tank?

Chemical Materials Calculation

laboratory dyeing machine can dye fabric, yarn or even some accessories like button, zipper and loose fibre but main products are the knitted fabrics. Knitted fabrics have different constructions and GSM (weight of fabric in one square meter) and this have different dye pick-up or adsorption. Table given below shows the common fabrics produced at and used in laboratory.

Style Blend Finished GSM
Single Jersey (SJ) 100%  cotton 115 – 270
Single jersey (SJ) PC and CVC 100 – 300
Back Pique/La Coste 100 % cotton/PC/CVC 150 – 250
Polo Pique/Honey comb 100% cotton/PC/CVC 150 – 240
Jumbo Pique 100% cotton 200 – 250
Twill pique 100% cotton 180 – 250
Bubble knit 100% cotton 200 –250
Rib 1×1, 2×2 100% cotton/w/lycra 180 – 280
Herring bone 100% cotton/PC 180 – 280
Special design 100% cotton/PC As required
Industrial Cleaning Services

Industrial Cleaning Services

Industrial cleaning

Categories Cost Per person per month Total cost
Cleaners @ Tk. 3, 2250/- per Cleaner for 8-00 hours duty including reliever   Current requirement 05 nos X 3,2250/- Tk. 126,250/- including Chemical & Materials (Except Toiletries)
Supervisor @ Tk. 4,2000/- = ×01 for Supervisor each 8-00 hours duty. Tk.4,2000/-
Chemicals & materials (Except to toiletries) Required quantity to complete daily cleaning service. Included
  Total 20,2250/-
Floor cleaning machine + Brush to wash floor as & when necessary, Machine to be kept at your site. Per month (If Machine is placed)   4,0200/-
Rent for Vacuum cleaner per machine per month . (If Machine is placed)   12500/-
Taka Twenty five thousand seven hundred and fifty only. Tk. 25,2750/-
Vat & IT, if  any, to be borne by you, not including in the above quotation 
Payment Terms: Cleaning bill to be submitted at the end of the month and Payment of which to be made within first week of every next month.

Other terms and conditions:

  • 6 days in a week, If worker in Holidays O/T to be paid by you @ Tk. 30/- per hour per person.
  • Salaries, bonus, Accommodations for the cleaners to be borne by us.
  • Dresses to be provided by us.
  • Replacement to be made at quickest possible time.
  • Inspector to be sent to monitor the work.
  • Cleaning Chemicals, Materials (except Toiletries) to be provided by us.
  • Over time to be paid by you if workers work more than 08 hours over time will be count @ TK. .30/= per hour person.
  • Two Festival Bonuses equal to one month salary to be paid by you during the Eid-Festival. In this context, a separate bill to be submitted to you before Eid Festival.
  • This contract will be valid for one year up to 15 June 2008, may be renewed upon mutual consent. Either of the party can terminate service during this period by giving 30 days notice or pay in lieu. We sale Clothing Inventory Management Software ERP for Sale

Re: Manpower Allocation: In case of manpower increases/decreases the invoice value will be increased/decreased proportionately.

Thanking you

For Nepcons

How To Reduce Serum IgE in Blood?

Serum Ige Increase By Food

The below foods are responsible to increase Serum IgE in blood. After eating these food within few minutes/ few hours it will react. This is also called food allergy. We sale Chemical Inventory Management System

  • Egg
  • Soy
  • Peanuts (Bengali -China Badam)
  • Milk
  • Wheat
  • Gluten (Bengali- Moidai Prostut Atha)
  • Peanut
  • Tree nuts
  • Shrimp
  • Shellfish
  • Fish

Serum IgE can Reduce By Foods

  • Tomatoes
  • Ginger
  • Fatty Fish : salmon, tuna ,mackerel and sardines.
  • Olive oil.
  • Magnesium
  • Apples
  • Peppermint tea
  • Green leafy vegetables: such as spinach, kale, and collards.
  • Nuts : almonds (Kaju Badam) and walnuts (Akhrot)
  • Bananas
  • Vitamin A
  • Vitamin C
  • Fruits such as blueberries, strawberries, cherries, and oranges