Packed-bed gas absorption process unit: should preferably be made of MS pipe 1.25 x 1.25 inches and all piping, feed tank and collecting tanks should be of good quality plastic/SS material. It should have a CO2 cylinder with control valve, pressure regulator and pressure gauges for cylinder pressure and regulated pressure is supplied with the set-up for the absorption process of CO2 in water. You can read also Hoover Side Impeller Apparatus for Garment. The unit The unit must have 4 inch wheel for easy movement: sss
Fair Remuneration
Are minimum wages ensured for all workers according to respective grades?
Are workers paid overtime wages as per law?
Is there a sufficient system to let workers check/ verify their wages?
Is the payment frequency legal?
Are the wages records of the workers maintained and kept by the factory for the last 12 months?
Are the workers allowed to avail earned leaves?
Are the workers allowed to avail casual leaves?
Are the workers allowed to avail sick leaves?
Are the workers allowed to avail festival holidays?
List of similar installed Sample Warping Machine in universities/industry in Pakistan and worldwide with their contact information List of trained engineers available for after sale service/maintenance Additional Points: …
Specification of Sample Warping Machine
The Customer shall be liable for and fully indemnity the Company against all duties, taxes, and import levies, deposits, demurrage or outlays of any kind levied in any part of the world in connection with the goods. When goods are accepted or dealt with by the Company upon
instructions from the Customer to collect freight, duties, charges or other
expenses from the consignee or any other person, the Customer shall remain responsible
for paying the same if they are not upon delivery paid by such consignee or
other person.
3materials: Cotton, Polyester Cotton, Kevlar, Carbon, Glass, Jute or similar
Sample Warping Machine al Working Width: 850 mm or higher
Stationary hook system for better grip of synthetic yarn
Warping with ring technology
Equipped with 5 leasing rods and 2 leases
Setup for knotting
Power back up for emergency shut down in safe mode
Real time data acquisition / analysis system (fixed)
All parts / accessories required to make machine operational on site
Raw Material
The Customer warrants the accuracy of all descriptions,
values and other particulars furnished to the Company for customs, consular and
other purposes. A document signed by the Company but prepared by the Customer
shall under no circumstances by evidence of the condition or the correctness of
the declared nature, quality, quantity or weight of the consignment at the time
of receipt by the Company.
In the case of livestock the Customer further warrants that there has been and will be no breach of the international Air Transport Association Live Animal Regulations, a copy of which the Customer acknowledges having seen and by which is destined for the purpose of these Conditions.
The customer will fully indemnity the Company against all
losses which it may suffer and all penalties and expenses which it may sustain
by reason of the breach of any warranty given by Customer.
The words “goods” shall include livestock in
these Conditions where the context so admits.
Design NO: fabric must be well straight respecting the grain
Stripes width OK
Quality OK
Color NO: to be darker
Design NO: fabric must be well straight respecting the grain
Stripes width OK
Quality OK
Color NO: too grey and blue
Design NO: fabric must be well straight respecting the grain
Stripes width OK
Quality OK
Color NO: too grey to be brighter
Design NO: fabric must be well straight respecting the grain
Stripes width OK
Quality OK
Color NO: too yellow
Design NO: fabric must be well straight respecting the grain
Stripes width OK
Sample Warping Machine Quality OK
Finished Product Order Process:-
On getting the inquiry
from the customer, the below points to be clarified:-
Customer’s FSC Claim
requirement
LOGO sizes and logo
placements
Other specs like GSM etc.
Upon clarification of
above, the Logo has to be down loaded from FSC Websight and make the lay
out and place the logo on the product and send to SGS Sri Lanka for
approval.
The record will have to be
preserved with:-
Upon approval of the logo
and lay out by SGS Sri Lanks the approved logo and lay out to be
distributed to Design Dept, production floor and QA Department.
Sampling And Bulk
Paper requisition has to be issued by production floor to Store for samples.
On each issue of the Paper requisition, store has to be attached the updated paper inventory report.
After approval of the sample, production floor will issue requisition for bulk paper requisition.
Store will update the latest paper inventory report upon issuing the paper for bulk.
Distribution of the latest inventory report:
QA Audits
Qa Audit to be carried out in line production.
QA Inline Audit report to be preserved with QA and Production floor,
Upon completion of the production, the final inspection to be carried out by QA and distribute the Final Inspection report to MR and Production floor and store.
Delivery Documents To Prepared:-
For delivery the below documents to be prepared.
Commercial Invoice
Packing List
Challan
All documents must show :
FSC JOB number
FSC Claims
Delivery Quantity
GSM etc.
Conclusion
End of Sample Warping Machine article. Highlights the points on the orders of offset printing goods to be executed at our off-set printing unit.
In order to restructure the procedure for payment of Conveyance Allowance Rules to the employees and staff of Auto Forum Ltd. Control that land transport subcontractor operations meet the required standards . We sale Online Vehicle Management System Software Pick and drop, trip to purchases, visit of several units, meeting with buyers, sample carrying or performing any other official work in the interest of AUTO Group, a rule is hereby formulated as follows:
NEGOTIABLE TRANSPORT ALLOWANCE FACILITIES:
Any or all of the following consequences; Injury or fatality, damage to the environment, material or loss of image. Company will provide a negotiable flat transport allowance for “Group A” (Not for all and as well as Management has right to reserve this provision) only to pick & drop from residence and other duties in office hour to discharge their official duties smoothly. This allowance will fix up before his/her joining at company. This amount may cover from Tk. 15,000.00 to 20,000.00 based on location, distance of his/her residence and also priority, necessitate, demand, seniority and considering other bench mark
Any vehicle owned or rented by the contractor and used for the construction of the project. The vehicle shall be used for transporting project personnel and materials. Above mentioned limit may be relaxed in some special cases considering the involvement of the development work of the company.
POOL VEHICLE FACILITIES:
Any organization or entity that is performing works relating to the SMI project contracted. Pool vehicles facilities will provide only to “Group B” category for to and from near his/her residence. Those who will not avail negotiable Conveyance Allowance Rules facilities of “group A” may enjoy pool vehicle facility.
Any person employed by, or under contract to the project driving a vehicle for the project construction. “Group C” category will not be entitled for pool vehicle facilities for to and from near his/her residence. This category may avail this facility if the accommodation is available in any route.
Movement order (in the prescribe form) to Journey to be
taken from Admin & HR Dept. and dully signed by the Department Head and
General Manager (Admin & HR).
After completion of journey, Conveyance Allowance Rules with supporting papers to be submitted in the Accounts department within 03 (three) days for checking by Admin Dept. with the recommendation of Department Head and General Manager (Admin & HR).
The above rules may be amendable when the Management so desires
RESPONSIBILITIES
SMI is totally committed to the safe operation of road transportation, providing clear operating procedures and standards, which must be met by Contractor and its subcontractor operating transportation within the scope of the project constructions.
Project Manager;
Will demonstrate a committed to conduct land transport operations in a safe, healthy and environmentally responsible manner, Such commitment will be achieved by ensuring that adequate facilities, for vehicle selection and maintenance, and drivers training are established in early phase of the project.
HSE Manager:
Will ensure the implementation and control of a land transport management procedure that provides vehicles, facilities, personnel and equipment that conform to the project HSE Management System principles and standards.
Section Manager
Allocate the necessary resources to land transport operations
Promote land transport safety issues in meetings, including manager’s meeting
Communicate clearly that land transport safety standards are an important project requirement
PROCEDURE Doc. No DTMS-HSE- PG007
LAND TRANSPORTATION
Provide appropriate training and assessment for all parties involved in land transport operations
Encourage safety promotions and employees suggestions to improve safety performance and practice.
(Set plans and objectives, and monitor vehicle safety performance of all employees
LANDS
TRANSPORTATION MANAGEMENT PROCEDURE
The project,
as an integral part of the HSE Management System, shall instigate a Land
Transportation Management Procedure that will define the Driving Rules which in
turn will ensure that the following items are managed and clearly documented:
Driver and personnel management (selection, training etc…)
Responsibilities and duties of subcontractor
Compliance with Local laws and traffic regulations
The implementation of active journey management and risk assessment where appropriate
The main objectives of LTMP (Land Transportation Management Procedure) shall be to improve driving performances and to ensure vehicles are fit for purpose and roadworthy, in order to achieve such an objective the following shall be implemented;
Objectives to improve driving
performance are set at regular intervals, as a minimum, at least annually
Communication of the requirements and conditions of this LTMP, by arranging translations, as appropriate, issue and display making it available to all persons, and integrating into contractual documents
Ensure that the project driving standard and the condition of the vehicles are not detrimental to the DEC corporate image
Specific audits shall be performed by the HSE Manager at regular basis
Local initiatives to improve driving standards are developed as part of the annual HSE Plan for the project
Safety driving performance is integrated into the individual end of year appraisal for Conveyance Allowance Rules
What is Fall Protection – Every year many construction workers are killed or seriously injured as a result of falls from height, most of these accidents are preventable. You can read HP Canon Printer Fuser Roller sss
What Is Fall Protection:
It involved every plan and equipment put in place to prevent people working at height from falling, it is important that before you make up your mind to go on height to work that all necessary protection are in place for your protection, viz sss
Guard rails system
Personal Fall arrest system
Safety nets etc
Warning Line system
Floor covering or barricade system
All these primary fall protection system must be constructed in such a way that it should be able to withstand the total weight that will be put on it in the event of emergency.
All personnel working at height must wear and use correctly a safety harness with double lanyard for 100% fall protection.
Tips on the use of double lanyard
Do not hook the two lanyard at the same time
Hook only one lanyard at a time, it is enough to hold you
Use the remaining lanyard to hook before removing the first one in case you want to change your location and there is obstruction that will not allow the first lanyard to travel with you
Do not tie knot on the lanyard, as this will reduce the strength of the lanyard.
Always hook up above your head to reduce the free fall distance