It is the responsibility of the Operation
Manager, Merchandise Manager, Planning Manager and UK Planning Manager to
ensure the implementation of this procedure.
PROCEDURE
First availability dates are agreed with
the manufacturing unit and detailed on the business Critical Path. From weekly production meetings / telephone
conversations it is understood whether or not these dates can be achieved. If the dates / Qty’s cannot be achieved the
Factory informed to UK planning Manager and customer is advised in advance and
a new flow is submitted.
As these qty’s detailed on the flow arrive
in to the warehouse, they are made available to the customer weekly. (Where
sizes are out of buying ratio factory will chase for the balance.)
Using the position to flow document stock
levels is monitored and where potential issues arise the customer is inform by UK
head office.
Fortnightly the customer may send through a backlog sheet showing their version of the contract position and where discrepancies exist between both documents, the customer is advise. This continues through the life of the style until all customer stock is sold.
Ratio control sheets are raised by the team and monitored weekly to make sure the stock is being produced to agreed ratios. Smoke Tube Boiler
Nap Raising Machine – It is apparent from the components of Digital Bangladesh listed above that we will require a holistic approach that will address all of the components systematically. An important implication of that is that the government’s administrative structure should be re-organized to handle such policy-making that spans across different sectors…
Fabric carts for handling coton , polyester, linen, velvet
Case Study
Sunday, April
came. Our director sir saw the portrait & window display. He liked it &
appreciated us. And finally, Victor came; we all welcomed him by giving &
throwing flowers. When he was going upstairs, He showed him the portrait. He
liked that so much that he started taking photos. After visiting all the floors
we had a meeting and the chief guest was victor Rawlinson. After the meeting we
were doing our daily grinds. Suddenly sir called our team coordinator& us.
We met victor again. He appreciated us for our extra ordinary works. This
influenced us to go for the next step & show our creativity.
Victor left.
sir came to us & appreciated us again & shook hands.
What we visualized & designed, everything took its own shape & it was amazing to watch that & have that feeling.
For most drying processes of fabrics, it is not desirable that all water evaporates. For textiles, the optimum moisture level is their natural moisture level (e.g. 7% for cotton). Drying beyond the natural moisture level takes extra time and energy and besides, it tends to reduce the quality of the fabric.
In practice, evidence shows that 22% to 80% of the heat consumption in tenters and dryers is due to the heating of fresh air. Substantial energy savings can be achieved by reducing the quantity of drying air, e.g., by adjusting the flaps in the air outlets or controlling the frequency of the exhaust ventilator. The optimum quantity of drying air is determined and/or controlled according to the moisture level of the air and/or the pressure level in the machine.
An important point is that, in case the air supply to the burner is reduced, there is a danger that too much carbon monoxide is produced. Therefore, the air supply to the burners cannot be reduced indefinitely. In those cases, it is preferable to adjust or replace the burners. In all this, it is important to make sure that the air flow is sufficiently strong for removing dirt and moisture.
In case making adjustments to the air flow proves impossible, controlling the moisture level of the dried fabric can still save energy. By monitoring the moisture level of the dried fabric directly or indirectly, the drying time and the conveyor belt speed can be adjusted.
Jet Dyeing Machines: M/C process capacity width 1 Singeing 150 m/min. 1200-3200 mm. 2 Desizing 150 m/min. 1200-3200 mm 3 Scouring 150 m/min. 1200-3200 mm 4 Bleaching 150 m/min. 1200-3200 mm 5 mercerization 150 m/min. 1200-3200 mm
Manufacturing Accounting Software is used in all manufacturing company world wide. This is very easy and user friendly software. You can use it RMG sectors. Please contact us by submitting a comment below on Leave a Reply box, Cell# +8801792525354 or For any queries, please Contact Us.
We are pleasurably invited your company to please involve us by work as High quality, longevity, eco friendly and extra-powerful Air-conditioner Importer, Supplier and consultant to get more satisfied 24/7 service complete work with decorative, patterned and time framing by supply & delivery, strong fitting, perfect fixing, expert testing & commissioning of following under attachment price. We sale Asset Management Group Wise Allotment Software sss
TON
General
Ac Price
Other
Hitachi
LG
Carrier
1.0
tr➡
48,000
36,000
45,000
45,000
30,000
1.5
tr
65,000
46,000
55,000
56,000
38,000
2.0
tr
75,000
56,000
65,000
65,000
48,000
2.5
tr
1,15,000
95,000
95,000
1,15,000
72,000
3.0
tr
119,000
120,000
85,000
Cassette
type
1.5
tr
85,000
72,000
75,000
85,000
55000
2.0
tr
95,000
95,000
90,000
98,000
65,000
2.5
tr
1,20,000
1,15,000
108,000
1,25,000
78,000
3.0
tr*
1,45,000
1,31,000
1,22,000
1,72,000
98,000
4.0
tr*
1,60,000
1,55,000
1,42,000
1,92,000
115,000
5.0
tr*
1,70,000
1,70,000
1,55,000
125,000
Ceiling
type
3.0
tr*
1,45,000
1,31,000
1,32,000
1,70,000
98,000
4.0
tr*
1,55,000
1,48,000
1,52,000
1,92,000
115,000
5.0
tr*
1,65,000
1,68,000
1,65,000
125,000
floor
standing
2.0
tr
1,18,000
1,01,000
1,15,000
1,20,000
70,000
2.5
tr
1,45,000
1,23,000
1,22,000
1,40,000
85,000
3.0
tr*
1,75,000
1,41,000
1,32,000
1,72,000
98,000
4.0
tr*
1,95,000
1,58,000
1,42,000
1,92,000
115,000
4.5
tr*➡
2,10,000
1,72,000
1,55,000
125,000
We expertly supply, VRF, DUCT, and Chiller type air-conditioner.
Mutually negotiate and flexible be payment terms.
VRF, Duct & Chiller maximum, 1 year lengthy payment terms.
WARRANTY TERMS
Residential- Compressor 5 years. Spare parts 2years. Sale service 3 years Commercial-Compressor 2 years. Spare parts 1 year. Sale service 3 years. Every 6 month later free servicing.24/7 service In Price & terms we are always negotiate and flexible. Quantity/frequency for local items/works is not fixed. Quantity of these components may increase or decrease due to actual situation at field level or due to change in design Thus total cost is also variable for these components but rate given / approved shall remain same.