Air Emission and Ozone Depleting Substances

Air Emission and Ozone Depleting Substances

Air Emission 

SLEQUIPMENTS NAMECAPACITY
1Compressor15 kg
2Air Conditioner4.5 tone
3Air Conditioner1.5 tone
4Air Conditioner1.5 tone
5Air Conditioner1.5 tone
6Air Conditioner2 tone
7Air Conditioner2 tone
8Air Conditioner2 tone
9Refrigerator8 cft
10RefrigeratorSmall
11Micro Hiace  A/CMicro
12Micro Voxcy  A/CMicro
13Micro Honda  A/CMicro
14Heat Logo Machine03 kg
15Heat Logo Machine03 kg
16Heat Logo Machine03 kg
17Seam Tape Machine03 kg
18Seam Tape Machine03 kg
19Seam Tape Machine03 kg

Ozone Alert Substances 

SLEQUIPMENTS NAMECAPACITY
1Compressor 15 kg
2Air Conditioner4.5 tone
3Air Conditioner1.5 tone
4Air Conditioner1.5 tone
5Air Conditioner1.5 tone
6Air Conditioner2 tone
7Air Conditioner2 tone
8Air Conditioner2 tone
9Refrigerator8 cft
10RefrigeratorSmall
11Micro Hiace A/C 
12Micro Voxcy A/C 
13Micro Honda  A/C 

Green House Gas (GHG) Inventory

SLEQUIPMENTS NAMECAPACITY
1Compressor 15 kg
2Air Conditioner4.5 tone
3Air Conditioner1.5 tone
4Air Conditioner1.5 tone
5Air Conditioner1.5 tone
6Air Conditioner2 tone
7Air Conditioner2 tone
8Air Conditioner2 tone
9Refrigerator8 cft
10RefrigeratorSmall
11Micro Hiace A/C 
12Micro Voxcy A/C 
13Micro Honda A/C 

STAFF
• Staff refers to employees (including permanent, temporary, intern, dispatched, vocational) that are not directly involved in the production process. This includes staff from the office, cleaning, security and research and development departments.
• If there is a canteen and dormitory in the facility, employees in the canteen and dormitory shall be counted as staff.
• If certain services are subcontracted (e.g. canteen management and cleaning staff) to external service providers, they shall counted as staff as well.

ORDINARY WORKING DAYS
• Ordinary working days refer to days that workers are expected to spend on work activities as stipulated in laws or regulations, in each specific month.
Does NOT include extra working hours on week off and public holidays.

PERFORMANCE DATA DEFINITION:
• The total number of workers who have been hired within the month, regardless of which recruitment channels used (e.g. internal reference, third party labor brokers, online job posting and recruitment at the gate).
• Include dispatched workers, student workers, interns, part-time workers and workers who are hired for temporary purpose.
It should include every one that has gone through the recruitment process. For example, if a worker has finished the recruitment process, but quits on day 1, he/she should be counted as well.

Sewing Software for Garment Line Input.

Sewing Software for Garment Line Input.

Sewing Software 

Sewing Software and Bundle Cutting Input Free ERP is also known as Cutting Inventory Module. This is the part of The user can start the sewing input process here. After completing this process sewing output process will start. Receiving print and embroidery is very important section here. The use can see total 17 step here after login. Please contact us for demo. We sale it.  For any queries, please Contact Us.

Major Features

  • Automatic Barcode Update of Production Status
  • Manual Update of Production Status
  • Search Specific Barcode
  • Hourly garment production monitoring with genuine factory efficiency calculation
  • Identify produced cost per minute calculation
  • Order wise post gain production costs analysis
  • Order wise pre gain production costs analysis
  • Order wise pre loss production costs analysis
  • Order wise post loss production costs analysis
  • Style wise post gain production costs analysis
  • Style wise pre gain production costs analysis
  • Style wise pre loss production costs analysis
  • Style wise post loss production costs analysis
Technical Requirements of Fire Hydrant System

Technical Requirements of Fire Hydrant System

Fire Hydrant System

Fire Hydrant System -Auto  requires Vendors to provide their employees with safe, clean, and healthy conditions throughout all work facilities, including clearly marked and passable aisles; easily identified, accessible and unblocked fire exits; adequate medical facilities, adequately lighted and ventilated production areas; clean restrooms; potable water; reasonable opportunities for rest breaks during the workday; and well maintained machinery.  Fire exits must be clearly marked and unlocked during working hours. …

  • Proper Drawing means of shop drawing all details with section wise: 
  • When engineering controls cannot eliminate or significantly minimize a hazard in a way that poses little to no threat of injury to employees, vendors shall provide all affected persons with the appropriate personal protective equipment or clothing, and require its proper use. Piping Drawing / pipe Line drawing.
  • Legend of all equipment and fit-up details.
  • Each joint fit-up details.
  • All local laws and regulations shall be complied with.. Elevation details.
  • Each elbow & T-joint detail drawing.
  • Pipe Support drawing details.
  • Safe working Load of a pipe Support.
  • Safe working Load of a royal bolt (which has provided)
  1. Written welding procedure with detail for proper clarification.
  • Bevel Cutting details.
  • How many pass / layer to be made for the welding?
  • Details of root gap, penetration details and confirmation of welding.
  • Standard of the welding?
  1. Welding joint inspection :
    1. Such as UT / MT or at least MPI (Magnetic Particle inspection )
  2. Welding Joint certificates are required prior to Hydro test.
  • Graph record required for hydro test / static.
  • Clear hydrostatic procedure should be submitted before test start.
  • Certificates are to be submitted with joint numbers for future plan.
  1. All catalogs & User manual of valves, elbow, to be submitted with the materials for actual reference and prove of capacity.

Smoke Detection System:

  • Proper Drawing means of shop drawing all details with section wise.
  • Capacity of each devices with catalogs.
  • Catalog of control panel, User manual of Fire Hydrant System

Fire door:

  1. Proper Drawing means of shop drawing all details with section wise.
  2. Written Details of the fire rated door capacity, such as maximum temperature (Celsius / Fahrenheit) capacity.

Conclusion

Fire Hydrant System -Vendors shall identify all sources of hazardous materials in the workplace and prevent or sufficiently limit employee exposure.  Vendors must adhere to all applicable laws and regulations regarding exposure to hazardous materials.

CC Camera Housing Cable and DVR Check List

CC Camera Housing Cable and DVR Check List

CC Camera Housing Cable Checklist

  • Camera / lens focus and auto
  • iris adjusted properly
  • Camera field of view is adjusted to customer’s requirements
  • Camera / housing viewing window is clean, inside and out
  • Camera lens is dust free
  • Interior of camera enclosure
  • is clean and dry.
  • Check operation of pan tilt, and zoom focus. Use controller in control room to check all these operations
  • Check wiring and cable
  • harnesses for wear and fray
  • Check to make sure cable is
  • dressed properly
  • Check connectors and cable entry points for loose wiring
  • Coaxial cable is transmitting an adequate video signal to control room. Signal should be free of distortion, tearing, and rolling, etc
  • Make sure all coaxial
  • connectors are insulated from conduit and pull boxes
  • Monitors are free from picture
  • burn-in, and distortion
  • Monitors have proper
  • contrast and brightness
  • DVR/NVR are functioning properly and provided distortion free recording
  • DVR/NVR should be sent out for professional cleaning, and belt changes. This should occur on a regular basis
  • (at least every18 months).
  • All control equipment is operational. Switchers allow
  • proper sequencing and call up.
  • Multiplexers are properly
  • encoding and decoding.
  • Matrix switcher keyboards are fully operational
  • Clean all monitor screens, control panels, and keyboards with a diluted cleaning solution
  • Check all coaxial connectors on the back panels for loose connections
  • Check all power connections to insure AC plugs are not loose or power cables frayed

Records:

The organization shall establish & maintain procedures for the identification, maintenance & disposition of environmental records. These records shall include training records & the results of audits & overviews.

Environmental records should be legible, identifiable & traceable to the activity, product & service involved.

Environmental records shall be stored & maintained in such a way that they are really retrievable & protected against damage, deterioration or loss. Their retention time shall be established & recorded.

Records shall be maintained, as appropriate to the system & to the organization, to demonstrate conformance to the requirements of ISO 14001.

Apparel ERP Software for Garment Finishing Section

Apparel ERP Software for Garment Finishing Section

Apparel ERP Software – Garment Finishing

Apparel erp software for garment finishing section is the end process of a garment factory. The garments manufacturer can buy apparel erp software module wise or integrated module wise. If they buy module wise then he need to enter basic finishing data at the starting level in finishing department. . If they buy integrated module wise then he need not to enter basic finishing data at the starting level in finishing department. The data will come form concern department.  For any queries, please Contact Us.

Finishing Software 

  1. Planning and Scheduling Software System for Garment Shipment

More Software

Major Features

  • Barcode Auto Update for Finishing Status
  • Manual Update to get Finishing Status
  • Automatic Packing List Generation