Application for CPP Category License for Generator

Application for CPP Category License for Generator

Application for CPP Category for Generator

Dated: 05/12/2018

To
The Secretary,
Bangladesh Energy Regulatory Commission,
TCB Bhaban, 1 Karwan Bazar,
Dhaka-1000.

Application for small CPP category license.

Sir,
Please refer to your Memo No. BERC/JJK dated 17th January, 2018 and our application Issue No. 2018 dated 26.10.2018. I am Mazful Islam the  of Auto Garments Ltd. have applied for BERC CPP license. Disconnect the power source of the cable laid into channel  and  clean  dust  and  debris  of  all  interior components. Establish a periodic cleaning program and maintain records of the activities. Provide cover made of noncombustible material on the channel for preventing ingress of dust and debris in future. In this connection, BERC officially reviewed the submitted documents and application and found some incomplete documents submitted by my representative, in this circumstances, we made our all incomplete documents updated which are attached for your kind attention and submitting to BERC for further process.

We hereby certify that the information contained in the documents submitted herewith is accurate to the best of our knowledge.

Your cooperation will be highly appreciated for acquiring the small CPP license as soon as possible for running our business smoothly.

Thanking you,

Attached:

  • Boiler Remove from Ground Floor
  • Roof Top Free 18%
  • New Building furnishedCopy of application for DoE clearance certificate.
  • Date of commissioning of each generator
  • Type of the Power Plant (Technology)
  • Heat rate of each generator
  • Generator checklist License
  • Development / promotion of my Junior
  • Stair Dismantle
  • Sample Section Relocation (3 times)
  • GP Tower Removed
  • Exit make at 4th & 5th floor of production building to office building
  • Stair remove from 5th floor and Penetration remove from 5th and 6th floor (male stair)
  • Disciplinary Action
  • 4th to 5th floor Organize of AKL Office Building
  • 3rd Exit of Production Floor
  • Annual Capacity factor of the Power Plant
  • Physical Layout of the Power Plant
  • Brief of protection & metering system.
  • Layout plan of Earthing & foundation with earth resistance
  • Information regarding Environmental Compliance of the plant
  • Secondary Exit of Finished goods godown 2
  • Child Care Center shift
  • Space reduce from JEL (add space with AKL Finished goods)
  • Accord / Alliance Finding Correction
  • List of the applicant directors having interest more than 10% in the company.

Type of the Power Plant

Sl. No.Description of GeneratorParticular of fuelPower Plant Type
 

 

01

 

 

Generator CATTER  PILLER , Model: C1822635

 

 

 

Diesel to be used for Generator

 

 

 

Diesel Power Plant  (Standby)

 

 

02

 

 

Generator CATTER  PILLER , Model: GE22P700-1

Generator Commissioning Checklist and Report

Generator Commissioning Checklist and Report

Generator Commissioning Checklist

According to Mass-Circular of BERC (Bangladesh Energy Regulator Commission) refers their rules of 2003 section 27 & 28, all party must have to collect License or Waiver Certificate from BERC by 31 July, 2018. In this regards we need to apply for License or Waiver Certificate for rest of our Generator Checklist  which are still not applied.

SL NO.Generator Commissioning Checklist DescriptionDate of commissioning
01Generator CATTER  PILLER , Model: C186335, Prime power  1500 RPM, 50HZ, 400/230 Volts, Country of Origin USA, Local Supplier Bangla Trac Ltd.12 February ,  2018
02Generator CATTER  PILLER , Model: GEP700-1, Prime power  1500 RPM, 50HZ, 400/230 Volts, Country of Origin USA, Local Supplier Bangla Trac Ltd.26 September,  2018

Attachment :

Commissioning Report of Engine Model no- C-1558

Commissioning Report of Engine Model no- GEP00700-1

HEAT RATE OF EACH GENERATOR

Sl. No.Description of GeneratorHeat Rejection ParticularDM9823
01Generator CATTER  PILLER,  Model: C1800635Following   programs   and   test   results   are   not conducted and kept.

 

1.Maintenance  program   (periodic  inspection  and

testing program)

2.Thermographic   scanning  inspection  report   of

electrical equipment (tri-annual base)

3.Electric  safety  program    (training  on  electrical

safety)

Heat Rejection to coolant (total)

165KW9384 Btu/min
Heat Rejection to exhaust (total)487KW27696 Btu/min
Heat Rejection to after cooler91KW5175 Btu/min
Arrange  periodic  inspection  &  thermal  scan  to identify    the    overloading,    loose    connection, unbalanced load which may cause the excessive heat-rise and take action Audit ingly.

 

Heat Rejection to atmosphere from engine

83KW470 Btu/min
Heat Rejection to atmosphere from generator.319KW18141 Btu/min
02Generator CATTER  PILLER , Model: GEP70000-1Exposed   flexible   conduit   must   be   run   either horizontally or vertically and not at an angleSame as above

Application for Generator Commissioning Checklist

The Chairman,

Bangladesh Energy Regulatory Commission

TCB Bhaban (3rd Floor)

1, Karwan Bazar, Dhaka-1215

Dear Sir,

We hereby request you to kindly issue a license waiver certificate for KVA power generation at the location mentioned in the application form.

We are providing herewith the required information and attested copies of the documents along with the application form.

We are paying herewith Application Fee as mentioned bellow:

  • Amount (in Taka): BDT. 20000.00 (In words): Taka Two Thousand Only
  • Demand Draft/pay order no: (For Bank outside of Dhaka city Only DD will be accepted)
  • Date of payment:
  • Name and Branch of the Bank: IFIC Bank, Gulshan Branch, Dhaka    We hereby certify that the information contained in the documents and mentioned in the application form submitted herewith are accurate and complete to the best of our knowledge.

Thanking you,

Yours Sincerely,

LIST OF DOCUMENTS & PAPERS FOR WAIVER CERTIFICATE OF GENERATOR

  • Original Catalogue of Generator.
  • Copy of Article of Association & Memorandum of Company.
  • TIN Certificate
  • VAT Certificate
  • Trade license no. & Validity
  • Electricity Bill. (Last Paid)
  • Gas Bill. (Last Paid)
  • Demand Draft No.
  • Date of Payment.
  • Name & Branch of Bank.
  • Name of the Applicant.
  • Address of the Applicant.
  • Location of the Generator.
  • Number of Generator.
  • Purpose of such Waiver.
  • Purpose of such Generator of Electricity.
  • Period Required for Waiver.
  • Load to be served by Generator:
  • Total Load:……………KW:
  • Lighting:……………….KW
  • Other…………………….KW
  • Present Electricity Provider šŸ™ PDB/REB/DESCO/Other).
  • Information of Generator:
  • Manufacturer:
  • Brand:
  • Type:
  • Capacity šŸ™ in KW).
  • Year of Manufacture:
  • Name of The Fuel:
  • Fuel Requirement:(Leter/Kwh):
  • Estimated Fuel Cost (Per Kwh):
  • Manual/ Automatic Start:
  • Details of the Safety Measures:
  • Information of the Building & Land:
  • Name & Address of the Land-owner:
  • Name & Address of the Building-owner:
  • Name & Address of the Factory-owner:
  • Consent of the owner of the Land or Building
How to Collect Certificate of Newly Installed Boilers

How to Collect Certificate of Newly Installed Boilers

Collect Certificate of Newly Installed Boiler

For your information, a new Type Best Boilers has been installed at Auto Garments Ltd at, Dhaka is going to operate very soon. Set  up  the  above  program  and keep  the  test result. But the certificate of boiler still not collected from the respective source. Due to unavailable of certificate the factory can not go to the operation. Besides some forthcoming social compliance audit will hold in that factory very soon. If we couldn’t show the boiler certificate to buyer it must affect in audit report. It  must  be  used  proper  material  to  support  the aluminum cable duct instead of wire. In this regards, pls arrange the certificate against the newly installed boiler at Auto Garments Ltd. so that the factory can run the boiler as they scheduled and the forthcoming audit will fare from any observation in this regards. For your information & necessary action please

Regarding BGMEA Membership Certificate of Auto Garments Ltd.

AUTO TEXTILE  has a policy to work continuously on the conservation of energy leaded by Ex-Director. Moreover the company has got a team which does it every day and submits report to MD for any mishaps. The maintenance department has a list of jobs done for the conservation of energy and the internal audit committee has got the list of works to complete to conserve the energy efficiently. IPS system may be relocated, to other location, to provide adequate and safe working space (1 meter preferably). Provisional BGMEA membership certificate of Auto Garments Ltd. has been expired on March 04, 2009. Its to be noted that it’s an important certificate what to be shown during social compliance and others audit. By this time some buyers had made schedule to audit the factory. If we can’t show the valid BGMEA membership certificate during audit we might be fall down on corrective action plan (CAP). In this circumstances you requested to arrange the BGMEA membership certificate of Auto Garments Ltd. in the earliest time so that we can move for any effective social or others audit.

Group Insurance Certificate for All BGMEA Members Factory

Group Insurance Certificate for all BGMEA members’ factory of our group. That entire certificate has been expired from 06 May 2009. I will be pleased if you make me informed about the progressive of collecting renewal certificate of Group Insurance. If you submitted the documents and necessary paid pls provide me the documents so that we can show the progress to buyer during audit. In this regards pls collect and provide us the Group Insurance Certificate or any temporary supporting documents from the respective department so that we can carry on the audit effectively. For your information and necessary action for Best Boilers.

What is Micrometer Calibration of Measuring Tapes

What is Micrometer Calibration of Measuring Tapes

Micrometer Calibration

  • Micrometer Calibration -All measuring taps used in Auto Knitwear Ltd. Sewing Line, Measurement Checking, Final Inspection and Stores Dept. must be properly calibrated at an interval of 90 days  Read about Pressure Gauges Calibration Apparatus ..
  • Calibration of Tapes shall be performed by using the calibration standard. A Measuring Scale of 1 meter length with a valid accuracy shall be obtained and certified by Bangladesh Standard and Testing Institute (BSTI) centimeter sale measurement.
  • Manager Maintenance shall be the custodian for the Measurement calibration standard and it will be safeguarded from any unauthorized use.
  • The Measuring tapes shall be calibrated against the certified Standard in Centimeters scale. The record of such calibration shall be maintained in Calibration record form.
  • Maximum acceptable tolerance for the measuring tape shall be identified in the calibration certificate. Any tape showing readings greater than the acceptable limit will be withdrawn from the floor and replaced with a calibrated one.
  • Measuring tapes to be calibrated shall be measured to 1 meter (0-100cm) length from the starting edge against eh calibration standard tape and record shall be taken.
  • The reading of the tape under calibration (against 1 meter of the calibration standard tape) shall be taken and written down.
  • The deviation shall be calculated and converted into centimeters meter standard in the following formula : aaaa
  • Reading of standard    Reading of tape to be calibrated          Deviation/100cm

Bulk Production Procedure

PURPOSE

The purpose of this procedure is to confirm that prior to bulk production despatch from factory, garments representing of bulk production confirm to customer requirement

RESPONSIBILITY AND AUTHORITY

It is the responsibility of the Quality Assurance Manager to ensure the implementation of this procedure.

PROCEDURE

After the cutting authorisation for bulk has been received from head office, first bulk cutting is proceeding.

During the bulk production, for every style and colour will be selected and sent to the Head Office Garment Technical Manager

The Technical Manager will select a standard by measuring garments and comparing them to contract seal. The sky will then be taken together with the standard and style file to the Quality Centre for auditing.

Once the Quality Centre has audited sky pack the Technical Manager will approve for shipment of further bulk production by signing the audit report and returning it to the factory.  If sky pack fails the audit this is communicated back to the factory together with actions to be taken.

Four garments in all sizes will be selected, these must be checked for labelling, presentation and fitted, (using usual models), on approval, if these are approved, rack samples will be submitted to the customer.

If the customer does not approve the rack samples they will be returned to the manufacturing unit and stock will not be made available to the customer until satisfactory samples have been submitted.

Conclusion

Micrometer Calibration -All measurement tapes shall be given individual serial numbers. A calibration card showing calibration status, date of calibration and the next date for calibration shall be attached to all the calibrated tapes.

What is  Instrument Calibration of Weighing Machine

What is Instrument Calibration of Weighing Machine

Instrument Calibration

Instrument Calibration- Weighing machines shall be calibrated once a year from BSTI (Bangladesh Standards and Testing Institute) and certification shall be obtained. The interval for calibration may be shortened or lengthened as per recommendation of the BSTI. Manager Maintenance is responsible for calibration of inspection, measuring, and test equipment. Quality Control Manager is responsible for ensuring that only calibrated equipment is used for inspection, measuring, and test activities ….

Intervals of Calibration :

Calibration of Monitoring And Measurement Device shall be done at an interval defined in SOP or recording form or as recommended by calibration source.

Quality Control Manager shall assess calibration result every year and based on that assessment he may shorten or lengthier the interval of calibration.

 Instrument Calibration Procedure :

Written Standard Operating Procedure shall be used for all calibration of Monitoring and Measurement Device where calibration will be done internally using house method or to calibrate working device using calibrated standard.

Responsibility :

Maintenance shall be responsible for all calibration activities. During production, after reaching at the optimum temperature (above 800C), in case the lid of machine needs to be opened, operator must depressurise the machine and use hand gloves, eye-protecting glass etc. while performing such task for safety.

Any Monitoring and Measurement Device found to be out of calibration shall be removed from use by the concerned Manger Maintenance or Quality Control Manager and shall take appropriate action to re-calibrate.

Calibration Status :

The technology which is used to modify the appearance, outlook comfortable and fashion of the garments is called Garments washing. In this process a garments is provided a lucrative and glossy outlook Monitoring and measurement standards shall be labeled to indicate calibration status.

The calibrated Monitoring and Measurement Devices and measurement standard shall be identified by ā€œCALIBRATEDā€ label. The label shall identify the date calibrated (month, day, year), specific calibration due date and the initial of the person calibrated the equipment.

Conclusion

Instrument Calibration- Out of Calibration Monitoring and Measurement Device or having limitations of their use shall be labeled ā€œDO NOT USEā€.