As the factory owner and during the course of finalization of the reports and remediations plan described above, you must confirm that you understand the reports and will fully execute, within the provided timelines, all of the identified necessary remediations from the inspection reports. Should you face difficulty regarding the resources to complete these required remediations, please be informed that you should discuss options for identifying sources for the required resources with the Accord signatory brands producing at your factory. This does not mean the brands will directly provide you the needed resources but they are obligated to work with you to find the resources. Please note that the reports and necessary remediations will be simultaneously provided to the factory owner, each brand produced at the factory, and the worker representatives. …
Please be aware that within 6 weeks of the initial reports, the results of the inspection reports and necessary remediations will be published on the Accord website. Updates
Boiler room (Use of electric devise & use of stem pressure pipe)
Generator room (diesel, electrical fault & electric short circuit)
Improper operation or maintenance electrical equipment.
Improper storage or use of flammable liquids
Smoking in prohibited areas
Accumulation of trash
Hot work operations without proper controls.
PPE & Handtools required: Safety Shoe, Hand gloves, Fire Safety , Hard hat. Spanners, Adjustable wrench, Hammer, Lifting gears.
STEPS Safe Working Procedure
SAFETY STEPS
CRITICAL STEPS
1
Issue Permit to work for the cooler cleaning
Planning check sheet must be filled and other supporting certificate to be issued.
Discuss and instruct the team clearly
The work team must understand the total work.
2
Water from the cooler to be released. Inlet and outlet air piping to be hung.
Lifting gear and sling to be used for lifting pipes.
Lifting gears and slings to be selected properly.
3
Inlet and outlet flanges are to be opened.
Manually lifting and carrying of flanges to be prohibited.
Flange bolts are to be opened such that no damage occurred in the bolt thread.
4
Fix 02 nos I-bolt on the inlet endplate of the cooler tube bundle. Then pull the tube bundle for opening from the shell.
Lifting gear should be used for pulling purpose and it should be fixed with permanent settings.
Care should be taken so that baffle of the tube bundle has not been broken during pulling.
5
Tube bundle is then cleaned with high pressure water jet followed by chemical soak.
Proper PPE should be used.
Proper concentration of acid to be maintained.
6
Refit the tube bundle in the cooler shell.
Lifting gear and sling to be used for lifting flanges and pipes.
Care should be taken so that baffle of the tube bundle has not been broken during tube bundle fitting.
Routine work
Designated task or activities where the boundaries of the scope of work are well defined and unchanging. Such activities are recurring and identified as having sufficient potential hazard to require a Preplanned Permit, Certificate or Checklist to carry out the designated task.
Non-Routine Work
Task or activities where, because of the nature of work, a unique permit to work shall be issued.
Procedure
Carry out a survey where work permits are required on site.
List all those personnel authorized to issue and sign off work permits. Use form 3100 attached.
Train everyone concerned with work permits:
It is your responsibility as a permit acceptor to:
understand and carry out the work to be done
be in line control and remain in direct line supervision of the work whilst it is being arried out.
ensure that you understand the work procedures, the potential hazards and safety precautions and comply with the permit conditions.
stop work immediately and notify the permit issuer if there is any change in the permit conditins.
check inspect, confarm, before you sign accepting the permit.
if in doubt ask. Do not guess.
after completing the work the hand back procedure must completed to protect you from future liability.
Planning: use checklist
Preparatory work: to create safe working condition found from checklist 3107 before issue of permit or preplanned permit.
Execution: Formally issue permit in Form No. 3100, work to be monitored & supervised to ensure that the safe working conditions are maintained.
Hand Back: the permit to be formally handed back to the issuer.
Regularly check that work permits are completed correctly and field for 12 months.
During use a copy of the permit must remain with the person doing the work or team leader.
Conclusion
Within two weeks of the completion of all 3 initial inspections, you will receive the reports and remediation requirements identified through the initial inspections. You will be offered one week to provide comments on the reports to the Chief Safety Engineer (CSI). The CSI will then finalize the reports and necessary remediations. The final report and remediations plan will be concluded in consult Safe Working Procedure
with you as the owner, the signatory brands produced at your factory, and the engineering team.
Fire Alarm Bell and Fire extinguishers are provided on maximum every 550 Sqf. 3.5 fts height from the ground level. And round red strip line are marked at the eye high to point out from the distance. The area around at ground is marked with the red line to keep the area free all the time. And checked Periodically every day. Smoke free Fire Door & Push bar door: We have Smoke free Fire Door & Push bar door in All Floor. Smoke free Industrial Emergency Light: We have Smoke free Industrial Emergency Light in Every floor. …
Written Safety Policy :
Once an Fire extinguisher and fire equipment is installed, the responsible person ensure to post all fire equipment use instruction, labeled in proper way and daily/weekly inspection, maintenance, testing of fire extinguishers and fire equipment that they are in proper working condition and always ready for use.We have a written Fire Safety Policy, Which Is Posted On The policy board In Each Production Floor.
Fire Indications :
Once an Fire extinguisher and fire equipment is installed, the responsible person ensure to post all fire equipment use instruction, labeled in proper way and daily/weekly inspection, Evacuation Plan, Fire Security Team – Fire Fighting Team + Evacuation Team + Rescuer Team, Fire Safety Policy & First Aid Kit Are Kept in each floor Near Factory Exit. Clearly Instructed In Both Languages (English + Local)
Electrical Fire Alarm Bell & Visible Bell:
DCP Fire extinguisher suitable for Use at Solid Fire (A class). Incase of emergency use all kinds of Fire. Emergency push bells are installed either side of in production floor. And also Visible Bell for generator and biler operators.
Smoke Detector:
Once an Fire extinguisher and fire equipment is installed, the responsible person ensure to post all fire equipment use instruction, labeled in proper way and daily/weekly inspection, maintenance, testing of fire extinguishers and fire equipment that they are in proper working condition and always ready for use. Centralized Smoke Detector system are installed in floor to detect any smoke generate.
Exit Light:
Auto switch on glow type exit light is provided on every exit point to see from the distance. It is connected with IPS Backup and also keep smoke free industrial E.light.
Fire Drill :
Fire drill conducted every after 6 months. Fire drill exercise observation reports are being kept in register for any learning points.
Evacuation Area:
We have separate Area for All Workers .
Barred window and External Exit.:
Provided facilities for using External exit for Worker ,if any emergency time able to get out from factory .
Evacuation Drill :
Evacuation drill is conducted once in a month to keep all workers in practice for safe emergency evacuation.
Fire Hydrant Box:
Fire Hose Rills are installed in both sides in the floor
Emergency Light /Industrial Emergency Light:
Emergency light & Industrial Emergency Light is installed in floors & on the exit staircases for sufficient light in case of electricity failure.
Material Safety Data Sheet MSDS Are Properly classified, filed & summarized In Local Languages. Workers are trained In Chemical Safety Using MSDS. Hygiene Environment Pure Drinking Water is Supplied In Each Floor. Floors are cleaned daily with disinfectant. Toilets are properly ventilated And cleaned daily with disinfectant. Soap are Supplied In Toilets. Canteen & Dinning Hall Company provides the meal to Workers. Floor & tables top are cleaned with detergents. Canteen room is clean & tidy. CCTV CCTV certificated factory.
Section IV: Environment Policy Environment Policy We have an environmental Policy Which Is posted on the Wall In Each Production Floor. Section VI: Welfare
First Aid Facilities First Aid Kits are put up on wall nearby each Production Floor. Our qualified Doctors trained for First Aid Friends . Medical Dining Hall Have sitting have more 30 % of all employees. Bonus 02 (Two ) Festival Bonus shall be paid to employees In each Year. This bonus is Paid Festival (e.g; EID). After completing one year everypersons get 50 % of Gross Salary.
STAFF • Staff refers to employees (including permanent, temporary, intern, dispatched, vocational) that are not directly involved in the production process. This includes staff from the office, cleaning, security and research and development departments. • If there is a canteen and dormitory in the facility, employees in the canteen and dormitory shall be counted as staff. • If certain services are subcontracted (e.g. canteen management and cleaning staff) to external service providers, they shall counted as staff as well.
ORDINARY WORKING DAYS • Ordinary working days refer to days that workers are expected to spend on work activities as stipulated in laws or regulations, in each specific month. Does NOT include extra working hours on week off and public holidays.
PERFORMANCE DATA DEFINITION: • The total number of workers who have been hired within the month, regardless of which recruitment channels used (e.g. internal reference, third party labor brokers, online job posting and recruitment at the gate). • Include dispatched workers, student workers, interns, part-time workers and workers who are hired for temporary purpose. It should include every one that has gone through the recruitment process. For example, if a worker has finished the recruitment process, but quits on day 1, he/she should be counted as well.
Fire Hydrant System -Auto requires Vendors to provide their employees with safe, clean, and healthy conditions throughout all work facilities, including clearly marked and passable aisles; easily identified, accessible and unblocked fire exits; adequate medical facilities, adequately lighted and ventilated production areas; clean restrooms; potable water; reasonable opportunities for rest breaks during the workday; and well maintained machinery. Fire exits must be clearly marked and unlocked during working hours. …
Proper Drawing means of shop drawing all details with section wise:
When engineering controls cannot eliminate or significantly minimize a hazard in a way that poses little to no threat of injury to employees, vendors shall provide all affected persons with the appropriate personal protective equipment or clothing, and require its proper use. Piping Drawing / pipe Line drawing.
Legend of all equipment and fit-up details.
Each joint fit-up details.
All local laws and regulations shall be complied with.. Elevation details.
Each elbow & T-joint detail drawing.
Pipe Support drawing details.
Safe working Load of a pipe Support.
Safe working Load of a royal bolt (which has provided)
Written welding procedure with detail for proper clarification.
Bevel Cutting details.
How many pass / layer to be made for the welding?
Details of root gap, penetration details and confirmation of welding.
Standard of the welding?
Welding joint inspection :
Such as UT / MT or at least MPI (Magnetic Particle inspection )
Welding Joint certificates are required prior to Hydro test.
Graph record required for hydro test / static.
Clear hydrostatic procedure should be submitted before test start.
Certificates are to be submitted with joint numbers for future plan.
All catalogs & User manual of valves, elbow, to be submitted with the materials for actual reference and prove of capacity.
Smoke Detection System:
Proper Drawing means of shop drawing all details with section wise.
Capacity of each devices with catalogs.
Catalog of control panel, User manual of Fire Hydrant System
Fire door:
Proper Drawing means of shop drawing all details with section wise.
Written Details of the fire rated door capacity, such as maximum temperature (Celsius / Fahrenheit) capacity.
Conclusion
Fire Hydrant System -Vendors shall identify all sources of hazardous materials in the workplace and prevent or sufficiently limit employee exposure. Vendors must adhere to all applicable laws and regulations regarding exposure to hazardous materials.
Fire Fighting Equipment Manufacturers – Combustion caused due to chemical reaction between Oxygen, Combustible material and Heat is called FIRE. It is our one of the most precious gifts from the nature. The civilization of mankind started just after the invention of fire. Now fire has become a part and parcel of our day to day life. We can not think of our life without fire. But sometime such a precious gift can become harmful. It may destroy anything even the whole world..
Basic method of stopping or putting out FIRE is to remove any one of the three components (OXYGEN, COMBUSTIBLE MATERIAL, and HEAT) which are responsible in making of FIRE.
The simple method is a) Cooling
Blanketing
Beating
We kow that HEAT is one of the components of FIRE. If we can cool down HEAT then there won’t be any FIRE. This can be don by water or any non-flammable liquid or by use of water type EXTINGUISHER.
OXYGEN is also responsible for FIRE. Therefore O2 has to be removed to put out the fire. This can be done by covering the FIRE i.e. Blanketing. Even Beating effects removes the O2. These effects can be done by the use of appropriate FIRE EXTINGUISHER.
There are four types of Fire:
Solid Fire
Inflammable Liquid Fire
Electrical Fire
Explosive Fire
We can fight these different types of fires in different ways:
Solid fire usually occurs on solid materials such as cloths, paper, wood, rubber etc. Normally we can use water to extinguish this type of fire. If the burning material is small in size then it can be removed. We can also put out fire by hitting it with a wet towel or cover it with a wet blanket.
Inflammable Liquid fire usually occurs in oil fields, petrol pumps, petrol dumps etc. It is very hard to put out this type of fire as because the burning liquid keeps flowing and it burns whatever comes in it’s path. Water should not be used because these types of inflammable liquid are lighter than water and it helps burning the liquid. We should use sand or foam type extinguisher.
Electrical Fire is caused due to short circuit in the electrical wiring or in any electrical machines. In case of electrical fire we should never use water or water type extinguisher. If any water-based extinguisher used then chances of being electrocuted is very high.To fight this type of fire we should :
put off the circuit breakers,
put of the main switch, use powder type extinguisher or Hallon or Carbon-dioxide extinguisher
Explosive fires usually occur due to explosion of pressurized cylinders. Corrosive Material, Bomb, or Gas cylinders etc. In these cases of this type of fire we should follow the methods as prescribed for 2 and 3 judging the situation.
Fire Safety Plan
When there is a fire then there is smoke. The burning material gives Carbon Di Oxide. In case of rubber or any other synthetic material it omits carbon mono Oxide. Inhaling of carbon Mono Oxide is fatal. If a person inhales carbon Mono Oxide for more than 20 seconds, he may die. Therefore when there is fire we should –
Try not to inhale smoke as fire safety plan
Use cloth or wet towel to cover mouth and nose
Try to stay down towards floor as much as possible
(If using O2 extinguisher) do not inhale the smoke
Open all windows to let the smoke out
Don’t rush together towards the exit
Move in a line
Use emergency exits or any available exits
Statement of Fire Fighting Equipment
We have all most all the emergency fire fighting equipment (given below) to fight against fire or to avoid unexpected disaster caused by fire:
Fire Extinguisher* 42pcs
(ABC Dry Power -32pcs, CO2 -10pcs)
Hose Pipe 1pc(300 feet)
Water Bucket** 6pcs
Sand Bucket*** 6pcs
Fire Hook 6pcs
Fire Bitter 6pcs
Fire proof Hand Gloves 6prs
Stretcher 2pcs
Lock Cutter 1pc
Axe 1pc
Fire proof Blanket 1pc
* Sufficient Fire Extinguishers are available in every floor. These Fire Extinguishers are always checked whether they are in good condition or not.
** Water Buckets are always kept with sufficient water.
*** Sand Buckets are always kept with sufficient sand as fire safety plan
Planned Job Observation
To formally observe Task Performance against written procedures in order to measure and maintain conformance to defined safe procedures and to determine training/retaining needs.
Procedure
Identify hazardous jobs.
Identify critical safety steps.
Identify safety equipment needed for each job.
Discuss jobs with Worker(s) before finalizing procedures.
Supply written procedures to Worker(s) and Supervisor(s)
Carry out review of procedures yearly.
Fire Fighting Team
We have a fire fighting team. There are 26 specially trained firefighters in that team. They know very well that what should they do at the time of emergency. Beside the fire fighting team all the workers have been made conscious about fire. There is a fire-fighting meeting on fire safety plan in every month according to the training and meeting schedule of the
The objective of this section is to implement and manage a system to effectively control the equipment and procedures necessary for fire protection and prevention…
Fire rated false celling required in the passage of printing section.
Printing section & Store mezzanine floor fire rated separation is required
Female prayer room need to remove from store.
Carton storage need to remove from central store.
LPS installation need to complete by audit date.
Grounding in generator room and ventilation in substation need to complete by audit date.
SLD need to complete by audit date.
Retrofitting works of structural and progress report need to preserve for auditors.
Drawing and certification required for smoke detection, fire door, hose system etc.
To clear indicate the location of fire equipment and to ensure its accessibility at all times.
Location of equipment uniformly markded.
Symbolic signs used to indicate location of equipment.
“Keep clear” areas demarcated and maintained.
Floors demarcated below extinguishers where practicable.
Wall behind extinguishers to be marked with Red / white chevrons where practicable.
ll staff trained to keep areas clear.
Deviations to be reported by the Safety Representative in his monthly report.
Siamese connection required at facility.
Need to update evacuation plan.
Few fog light are not functional in auto carton, paper roll go down, manual carton, office building, poly, top divider and printing shed etc.
Few Exit light are not functional in auto carton, paper roll go down, manual carton, office building, poly top divider and printing shed etc.
Emergency lights is inadequate and few emergency light are not functional in auto carton, paper roll go
Extinguishers missing in points.
Fire doors closure are obstacle by column.
Thermographic scan need to close.
Dead front construction required LT, HT and other panels.
Emergency circuit identification required.
Generator room, poly printing, office building stair, paper roll godown, dinning, ball press penetration (civil & electrical) need to close.
Locking feature need to remove.
Dust in fire equipment’s and electrical items and cable trenches. Need to clear dust from the said area.
Need to reorganize Generator room housekeeping.
Need to vacant and clean under the stair area of office building and store.
down, manual carton, office building, poly top divider and printing shed etc.
Inspection checklist of fire alarm, Hose reel and extinguisher is not updated from 3rd September16.
Extinguishers are found over charged, without tag pin, cover of dust, expired etc.
Occupancy load is missing.
Occupancy load marking is missing.
Occupancy layout is missing.
Identification not found or inadequate for emergency light, call point, substation, generator, fire alarm etc.
Need to close door in paper roll connecting door or fire door protected. Also need to separate ball press stair and office building secondary stair.
command room.
Masonry wall crack need to repair.
Lighting fixture required in applicable area; like inspection table, storage etc.
Higher sized breaker need to replace.
Wiring in the storage area need to secure, like wire dressing, cable tray using, cable tie using etc.
Mechanical guard is required for electrical equipment.
Transformer oil MSDS required in Bangla and English.
Need to relocate generator by keeping surrounding 1 meter gap.
Need to remove exhaust fan of generator room to make separate assembly point.
Need to clean fire command room. Also relocate combustible and all unused extinguisher from fire
Pump room construction need to separate to avoid hazard. Also required its housekeeping.
Hot work policy and procedure need to update
Any kind of Hot work need to stop on audit day.
The small generator need to remove from assembly area.
Generators need to keep separate with identification or waiting for installation or not in use.
Unused boiler should be marked and need to remove combustible materials.
Conclusion
All type of chemical and combustible need to remove from utility area. All Fire Rated Door Frame should be functional and need to remove rope, pipe or other holding equipments.