Feature of troyee accounting software conform International Accounting Standard (IAS). All back-end, front-end and reporting software are built-in with troyee accounting software. In troyee accounting software, managing business operations is very simple: while creating new Ledger, you are required to classify it suitable under relevant Accounts Group to tell the software the nature of the Ledger and where it will appear. This is necessary at this stage as all Reports are prepared on-line the moment you enter transactions (Vouchers). In case of Manual Book keeping, this classification is done at later stage (after preparation of Trial Balance, Nominal Accounts are transferred to Profit & Loss Account through Journal Entry, Real and Personal Accounts are posted to Balance Sheet under proper heading i.e. Groups). The advantage is that your accounting software for garment industry are always Real-Time and any modification is instantly reflected. For any queries, please Contact Us.
Beyond standard entry modules and reporting, if required, there are opportunity for customization at different entry level in accounting software for garment industry and reporting level through discussion and mutual understanding.
Contact: Head Office: 46, Kazi Nazrul Islam Avenue, Dhaka
Production Planning and Production Scheduling Software can uniquely defined as production planning software, production scheduling software. We sale all types of planning software. T&A, Planning Board, For any queries, please Contact Us. This software named Production Planning and Production Scheduling Software portion for any type of apparel / any other manufacturing business. This software can maintain raw material and other accessories. This software keep track of supply chain management. So you can monitor the tracking system of your production. Accurate Data forecasting in the dynamic dashboard will keep right track of every process stages of production and to take necessary actions or decision for balancing the entire production operations in a system.
Features of Production Planning and Production Scheduling Software
Now we will discuss about Production Planning and Production Scheduling Software below-
Material Resource Planning
Visual Plan Board
Production Planning
Production Inventory Control
Production Configuration
Materials & Product
Batch & Job Production
Integration with other solutions
Multiple Production Unit
Wastage Monitor & Control
Factory Capacity Plan Entry
Critical path wise automatic even target date predefine after receiving PO sheet. It’s required to plan for every crucial steps of operation on the basis of shipment date. By Time Action Plan merchandiser can forecast their operational dead line for every individual order process. Management gets clear view of every individual order working progress status & auto notification for any inconsistencies are exists. Below data is entered for capacity plan –
Month: November
Year : 2020
Working Days: 29
Working Hours: 10
Total Men: 7000
Total Line: 45
Efficiency :High / 2%
Basic Order Information Entry
Production planning department will enter basic order and style information from PO sheet. For ERP system data will inherited from Garments Merchandising Software Module. For Single Planning management Module we need to enter below basic information-
Order Number: Ord5678
Style Name: 2Pk Jordan
Buyer Name: s.Oliver
Order Quantity : 10000
Color : Red
Size: XL (Select from)
Season : Rain
Shipment date: 09/09/18
Order Projection Entry
This is important module of production planning software. Order Projection means order estimation for future in factory. Merchandiser enter order projection from planning module. IE manager should know about some data of garments style and order.
Order Number:
Year:
Month :
Monthly Order Qty,
Monthly Total CM,
Planning Total Capacity,
Projected Total Capacity,
Monthly Buyer Capacity
Production Sewing Entry Form
Production Cutting Date (PCD): 20/02/18
Sewing Input Date: 23/12/19
Sewing Output Date: 19/12/19
Plan Board Functions
Split: We can split the plan board according to customer requirement. It is possible to split a style
Shipment date wise,
Shipment country wise,
Shipment lot wise,
Shipment size wise,
Shipment color wise,
Shipment production wise
Shipment customize wise
E.g. Buyer H&M, Style- Ar8876. Here we have total 5000 pics quantity including wastage and actual = 49000 pics quantity. Now we are going to actual plan it in line number 1, line number 2 and line number 3. Suppose we are assigning in line number 1= 20000, line number 2= 20000 and line number 3= 10000. So 20000+20000+10000 = 50000. It is possible in plan board
Generate Planning Report : Production scheduling software showing actual value in excel report. The software generate a excel sheet that generate all type of schedule information e.g. Floor Number
BUYER Name
Line Number
O/QTY
O/Qty +%
Line Allo.
Qty
O/NUMBER
COLOR/LOT/PO
Style Change Month of March
print/emb
EX-Factory
Fabric Inhouse Date
PCD
Date
Remarks
Learning Time Generator: production scheduling software generate learning time accurately
Flexible Working Hours: This software has flexible working garments production hour. The user can change working hour because shipment date may be change or factory manager may decide a style need to finish quickly.
Upload Style: The user can upload style in different company uniquely. E.g. If a user upload Buyer H&M, Style- Ar8876 in Autogarments Ltd. Company, Then int does not show in Auto Fashion Limited
Style Reallocation: The user can reallocate style always. Suppose line one is allocate with Order A and B, then the user can set Order C between A and B. It looks like A C B
Style Period Reallocation: It is possible to reallocate the duration of production through this software. Suppose a plan board is generated according to buyer data for 10 days from 1st October to 10th October. So plan board will occupied 10 days in one line. The workers of XYZ garments are very expert, so they can do it in 8 days. In this situation the user can minimize 10 days to 8 days by using this software.
Empty Uploaded Style: If a user uploads a style from software into plan board then the software won’t show this style again. As a result, the users do not confuse
TNA Facility: The plan board received data from TNA also
Cutting Scan Management System can be tread as very good production manufacturing Software. Please contact us for all types of RMG software. For any queries, please Contact Us.
Fabric Manufacturing System
Fabric Costing
Fabric Order Booking
Fabric BOM with Recipe
BOM Consumption and material purchase cost ceiling.
Material purchase (Import \ Local)
Material Planning
Production Planning
Garment Costing
TNA
Garment Order Booking
Garment BOM
BOM Consumption and material purchase cost ceiling.
Material purchase (Import \ Local)
Planning Board
Material Planning
Production Planning (from the fabric manufacturing to garment shipping)
Manufacturing order
Material receipt (Gate Entry GRN)
Quality
Material issue based on the material issue request
Section/Operation wise Garment production tracking (Cutting.Production and finishing, Embroidery, Screen Printing)
Container planning
Export invoice.
Manufacturing order
Fabric production tracking machine wise— Yarn dyeing, Lab Dyeing , Knitting, Bleaching, Washing, Fabric Dyeing, Fabric dewatering, Fabric Printing etc Material receipt with Gate Entry GRN
Quality
Material issue based on the material issue request
Packing
Invoice.
Scanning Process
Step-1 (Print Barcode): First we should print the barcodes on paper.
Step-2 (Cut Barcodes): Then we will cut pieces by pieces above printed bundle cut. After that we will separate it serial wise. If we cut the above printed paper it will be total 10 pieces of barcode sticker.
Step-3 : Pick a barcode for scan by barcode scanner. Please look the image below for one barcode sticker which will be scan
End Step-4 : Now login software as cutting module
Now we will go to Print/Embroidery section if any otherwise we will go directly to sewing production section
Sample department manage all Sample Development Software related information in this section. We are the authorized distributor of all largest software company in Bangladesh. For any queries, please Contact Us.
Sample Management Software Feature
Merchandiser will request Sample Require Date from Sample module, After that a sample master will approve date
Working instruction Report
Material Instruction Report
Parts Instruction Report
Send Initial sample/first sample/ fit sample to buyer
Revise/modification initial sample.
Approved initial sample d. Buyer request for size set/sales man sample
Send size set/ Sales mat sample to buyer with PP (Pre Production) Sample.
A merchandiser and sample master input specific sample’s data
Approved PP Sample (PP Sample must be approved for all buyer).
Full production trigger with PP Sample.
Send Production/Shipping sample to Buyer.
Finally complete production
Sample Development Entry Form
Sample master enter different types of sample data for sample development in Sample module. For ERP system they will get technical sheet data from Garments Merchandising Software module. For single module a user need to enter following data into system
Buyer Name : GEORGE
Order No: Ord764554
Color: Red
Merchandiser’s name: Masiyat
Season : Summer
Technical file Receive Date: 12/10/18
Style name: 30 PK SS REG WHITE SHIRT
Style Number: 548755
Order Image: Inserted
Order description : 30 PK SS REG WHITE SHIRT
Size Range: 14.5N – 18.5N
Sample Size: XXL
Sample Requested Merchandiser Name: Rahman
Sample Agreed By : Mr. Jeny (Head of Sample Department)
Sample Agreed Date: Sample Dept Head
Sample Type: Fit/ White Seal/ Blue Seal
Remarks(Sample): Better
Entry Date : 14/10/18
CAD Consumption:
General Consumption
Fabrics Width : 61”
Fabric/Yarn Details,: 65% Polyester 35% Cotton
Factory: Running
Embroidery : Required
Print: Not Required
Technical File Send Date: 12/12/18
Techpech Upload: Available
Unit of Measurement: Meeter
Sampling Size Ratio: By Sample Master
Techpech Document Name: George UK.Order 5656447.html
Prototype Send Target Date: 20/12/18
Actual Prototype Send Date : 20/12/18
Air Waybill No of Actual Prototype Sending: NA
Second Prototype Send Date : 20/12/18
Delivery: Follow the p/o sheet
Air Waybill No of Second Prototype Sending,
Forecasted Order Quantity: 54587 pcs
Prototype Comments Received Date : 20/12/18
Sample Image: Front Side / Back Side
Order Cancel or Accept Reason: Due to Failed of shrinkage
Working Instruction Entry Form
These are collections of information derived from different file like PO, precosting etc. Working instructions can input in our software system. Working instruction are very important for cutting sections. Without inputting working instruction in garment ERP cutting department can make cutting plan as we as barcode generation.
Inter lining: Non fuse at collar, paper fused at band, side seam gusset & slv tab.
Main label: At at yoke inside 1.5 cm below from band edge 4 side st.
Size label: Under the middle of main label.
Fit label: Regular fit att at band top side middle.
Spare btn.: 11 mm att at 2nd care label
Collar stay: n/a.
Collar : Stan collar (single layer) band top side contrast jersey fabric with polyester tape binding, nose edge to binding gap 3.5 cm. Polyester tape loop at collar cb visible 5 mm.
Cuff: na
Pocket: 2 chest mitered pkt with flap, pkt rolling 2 cm, inside d/fold 2.5 cm, pkt (l×w) position follow the spec.
Sleeve short: 2.5 cm rolling d/fold with d/ndl top st, st to st gap 6 mm, slv tab (l×w) 10×2.5 cm, position 11.3 cm.
Lower: 2.3 cm rolling d/fold width 3 ndl chain st (follow the sample)
Thread Tnstruction : 100% polyester / Top st 20/3, dtm ,( side seam in side chain st colour 3070 for all colour) lower part 3 chain st color 9635/3118/5873 for all colour) follow the approve trim card.
ButtonInstruction: (828 ) 4 hole as supply: 11 mm neck 1pce front 6 pcs , 1 pce ateach pkt & slv tab .
String Instruction:
Mod Hangtag:
Price Ticket Hangtag:
Ean Sticker :
Fist Care label: Att. At l.h.s seam 10 cm up fm btm hem . Barcode, care & extra instruction lbl att. Together same position. (as worn) .
Second Care label: N/A
Size Label: la-sl-1069962
Loop Label : la-wl-1069959
Parts Instruction for Cutting
Parts instruction is essential for cutting section. Before cutting we need to go through clothing designer apps system
Front: 2.8 cm width 5 mm welted kansai (2 part ) balance match. Embroidery at left chest 1 cm up fm pkt middel, logo embroidery at left side seam 7 cm up fm btm hem 2 cm away from side seam.
Front Left:
Front Right:
Slive Left: 0.6cm shell fabric binding bias cut, tack at slv edge point,
Slive Right:
Back: 0.6cm top/stc at cb seam. /Plain
Back Left:
Back Right:
Upper:
Lower:
Yoke: Double
Parts special Measurement:
Functions of Sample Development Software
Customer Name / Buyer Name: : Name of Garments Buyer select from dropdown list/ showing automatically as locked status
Merchandiser Name : Name of Garments Merchandiser select from dropdown list/ showing automatically as locked status
Season: A text field to input by merchandiser , it is the name of the season.
Technical File Receive Date: Select the date when garments merchandiser received the technical file from client.
Style Name: Text field to input by merchandiser ,the name of style.
Style Number: Text field to input style number , input by merchandiser , get from technical file.
Style Image: Image upload field from merchadiser to store sample’s image.
Style Status: It is a dropdown field contains order status, Is the order is confirmed by buyer or rejected . If confirm/rejected , remarks which is the reason
Style Description: A text field to type style description by merchandiser of style .
Size range: Select size range from from dropdown list / It will show automatically as lock status
Sample size: A text field to input the sample size by merchandiser
Sample Requested Merchandiser Name: The requested merchandiser name will show in text field
Sample Agreed By : Agreed by Head of Sample Department
Sample Agreed Date: Enter by Sample Dept Head
Sample Type: Enter sample type by merchandiser Fit/ White Seal/ Blue Seal
Fabric/Yarn Details: A text field field to input Fabric or Yarn composition information related details information.
Remarks(Merchandiser) : Good / Poor remarks by merchandiser
Remarks(Sample): Better/ Good / Poor remarks by merchandiser
Fabric/Yarn Composition/ Material : A text field field to input Fabric/Yarn composition related information.
Entry Date : 14/10/18. This is sample entry date
CAD Consumption: This is cad consumption data input by sample master
Consumption: This is general consumption data entered by a sample master. Some time we face group consumption, that means same style and same order may different consumption. IN our software we have option to this type of information
Fabrics Width : 61”. This data is input by merchandiser
Fabric/Yarn Details,: 65% Polyester 35% Cotton. This is fabric composition
Factory: Running . A dropdown field will show to select the factory name.
Embroidery : Required. Here Merchandiser can put embroidery information
Print: Not Required. Here Merchandiser can put embroidery information
Technical File Send Date: 12/12/18. When a merchandiser sent technical file after attaching file to the factory.
Techpech Upload: Available. Generally a merchandiser attached his order and style sheet. Eg. PO, BOM, Pi etc
Techpech Uploaded By : Merchandiser . Eg. PO, BOM, Pi etc
Unit of Measurement: Meeter/Yards etc
Sampling Size Ratio: This data is input by Sample Master
Techpech Document Name: George UK.Order 5656447.html
Prototype Send Target Date: 20/12/18. Approximate target date when samples will received from factories. This date always same for all assigned factories. Factory may send sample to the buying house or directly send to the buyer.
Actual Prototype Send Date : 20/12/18. Exact date when garments factories actually send the sample.
Air Waybill No of Actual Prototype Sending: NA. Not necessary all time. The serial number or token number of courier system by which the factory send the samples. Helpful For further tracking the samples if it not arrived at high time this token number
Second Prototype Send Date : 20/12/18. This prototype of garments also known as “First Fit Sample” . It is the second sample
Air Waybill No of Second Prototype Sending: The courier tracking/tracing number of 2nd prototype.
Forecaster Order Quantity: 54587 pcs. The Approximate quantity of order from the buyer. Generally this quantity remain as final order quantity but time to times it may varies.
Garments Prototype Comments Received Date : 20/12/18. When the comments is received from buyer behind the garments sample.
Order Status: Confirmed. This order is confirmed by a merchandiser and Final order quantity confirmed by the buyer.
Sample Image: Front Side / Back Side image is attached by fashion merchant
Order Cancel or Accept Reason: Due to Failed of shrinkage
Manual Working Instruction
An example of working instruction is given below-
* INTER LINING COLOUR & ART NO :- 0605 AT COLLAR , 6012 AT BAND , SLV TAB & GUSSET(S/CUT) OFF WHITE
*ENZYME RUBBER BALL WASH WITH SOFTNER. IRON : SOFT IRONING.
SPECIAL INSTRUCTION
4 ST AT 1CM .
5 MM TOP ST AT COLLAR, F/PLKT & BTM HEM * 1/16” TOP ST AT COLLAR JOINT , BAND JOINT & SLV TAB.
D/NDL TOP ST AT F/SHOULDER, B/YOKE, PKT & FLAP , ST TO ST GAP 6 MM. * 4 MM TOP ST AT FLAP JOINT.
SIDE SEAM FEED OF THE ARM BOTH SIDE AT FRONT , ST TO ST GAP 6 MM.
7MM FRANCH SEAM AT ARMHOLE JOINT.* BARTACK USE AT SIDE SEAM 1 CM UP FM GUSSET POINT.
HOLE MEASUREMENT: NECK SEAM TO 1ST HOLE 6 CM, LAST HOLE 11 CM UP FM BTM/HEM, OTHES HOLE S/BE EQUALE
ANY JOINT STITCH & PUCKERING NOT ACCEPTABLE .
Clothing Designer Apps
Some clothing designer apps are listed here –
Pinterest
Pantone Color Finder
Shopify
Sketch
Echotech
CAD
Lectra
Gerber
Techpacker
Tukatech
Instagram
Adobe Illustrator
Makers Row
BrandBoom
Slack
CLO-3D
Sample Reports
Color Wise Sample Report
Select Buyer : Radhamoni Select Style: All/ Style Name
We sale all Apparel ERP in cheapest price. We are the authorized distributor of all largest software company in Bangladesh. Please contact us by submitting a comment in below text box or For any queries, please Contact Us.. We also sale –