Test to be completed for both male and female component individually. Test component to be fixed to the tensile testing machine using the correct clamp. aaa
In process inspection for the tension test and keep the records in the risk analysis report. Sample selection should be as per the. But zero tolerance.
Initially when machine setting or if any adjustment, factory needs to make 10 mock ups for testing. Once machine is set factory needs to test the machine for consecutive 05 passes for fty to start bulk. Test specimen needs to be attached to the risk analysis format
Everyday n the morning when production starts initial 05 production garments need to be checked and need fty to record the results in the Risk analysis report. if any single defective unit , fty needs restart with mock up process
Every day after lunch fty needs select sample qty as per the factory and conduct the tension test, record the data in Risk analysis report. If any single defective unit, fty needs to rescreen all the produced garments in the morning hours. fty should adjust the machine and restart the mock up process.
Mock up should be in actual materials and similar constructed counter specimens
Metal detection
Apply tensile strength gradually up to 20.2 LBS or 90 N for draw cord sleeving & 19 LBS or 84.5 N for button pull over a period of time of 10 seconds
Maintain same force for 10 seconds