ROPE LENGTH :
- Rope length in meter = Fabric Weight / Weight per running meter
- = Wt in kg*1000*100 / GSM*width in inch*2.54*2(tubular fabric)
- = Wt in kg*1000*100 / GSM*width in inch*2.54(Open Width fabric)
- = Wt in kg*1000*100 / GSM*width in centimeter*2(tubular fabric)
- = Wt in Kg*100000 / GSM*Width in Centimeter (for open width fabric)
REEL SPEED:
Reel speed = Rope Length / Cycle Time . Read more about Chemical Consumption for Dyeing Fabric
CYCLE TIME:
Cycle time depends on dyestuff. For turquoise ( Blue 21) and R ( Sp) ( Blue 19) dyes I recommend cycle time 2.0 min and for other dyes I recommend 2.5 min. sss
MAXIMUM LOADING:
Max loading in Kgs = Rope Length ( in mtr)* GSMWidth in Inch2.54*2(for tubular)/ 100000
= Reel Speed*Cycle Time*GSM*Width in Inch*2.54*2(for tubular) / 100000
End of rope length article
Trackbacks/Pingbacks