Fan Coil System

  • Fan Coil System = Proper earthing condition
  • Inspection for damage of Electric contact point
  • Check proper functioning of all the switch
  • Check any water leakage
  • Clean the drain line to protect Fan Coil System
  • Any damage of the condensed collection tray
  • Check the insulation wet or dry
  • Any damage of the insulation
  • Check the function of solenoid valve
  • Any water leakage
  • Check Fire Extinguisher
  • Inspection for damage of Electric contact point
  • Check the condition of the fins
  • Check any block
  • Clean properly
  • Check the function of the sensor
  • Pipeline for Fan Coil System
  • Outer surfaces of the equipments
  • Painted the rusted surfaces area

Critique and Discussion

Immediately following the drills, key supervisory personnel should prepare a written critique and discuss their conclusions to analyses the success of the drill in achieving the planned objectives. The discussion session can take place at the scene of the drill or in a central gathering location . The discussion session can take place at the scene of the drill or in a central gathering location such as the coffee shop or mess room. The critique discussion should The discussion session can take place at the scene of the drill or in a central gathering location such as the coffee shop or mess room. The critique discussion should

• Review the emphasis of the drill.
• Discuss the problems which occurred during the drill.
• Assess whether the drill was conducted realistically.
• Discuss other possible situations that could have developed.
• Establish the aspects that in most critical need of practice in further drill.Reporting : Every safety drill shall be reported and filed in the Construction site/platform/vessel safety drill
register. The report shall include the following topics:
• Aim of the drill.
• Participants.
• Equipment used.
• Log of the drill completion
• Weak and positive points.
• Conclusions for improvement.