What is Service Concessions & Waivers Report for an Factory

What is Service Concessions & Waivers Report for an Factory

Service Concessions

What is Concessions & Waivers Report

Concession:  A revision to the standard for a fabric, sundry item or garment finish that is applicable for the duration of the item.  Service Concessions are determined & agreed upon prior to the start of production. Read about PP Spray Cabin Machine

Waiver:   A “one time only” agreement for the quantity specified in the purchase order or contract.  Performance must be improved for the next shipment or within an agreed upon timeframe

Product components must be qualified, either individually or as part of a product, prior to first production . Development & production testing is performed in accordance with the test protocols defined by Product Integrity (PI)

Product Development & Sourcing (PDS) & Manufacturing Operations (MO) are responsible for ensuring that components are tested during development & are approved prior to issuing production

MO is responsible for ensuring that production testing is acceptable at time of shipping Testing Failures Testing lab will communicate results directly to the submitter – usually a PDS or MO representative

If a failure occurs, the submitter is responsible for  working with the supplier, contractor and/or Technical Services to make the necessary improvements to meet the standards

The submitter is responsible for following the retest procedures & having additional samples tested, prior to making any requests for a concession

If the retest results in a failure, a concession or waiver to the standard may be requested Concession / Waiver Request

PDS/MO requestor fully completes the Concession-Waiver Request Form and sends this with all applicable test reports & tested specimens (if needed) to the PI Quality Analyst for review Incomplete information will delay the review process – all forms must be fully completed

The PI Analyst will review the information with the requestor & determine if a concession/waiver is feasible given the nature of the failure and the scope of the program

If the concession is feasible, the PI Analyst will assign a number & communicate the revised standard to the requestor If the concession is not feasible, the PI Analyst will summarize the reasons why in the “Comments” section of the request form and return this to the requestor

In the event PI does not approve the concession, the concession request may be reconsidered for approval the Product Management Director & the Merchandising Director, in consultation from the Regional Product Integrity Leader

Requests for reconsideration must be forwarded to these 3 individuals and must include all of the previously submitted documents

Note:  Requests for Service Concessions /waivers for Global Products may differ slightly in order to ensure implications for all markets are well understood.  In these instances, contact the Regional Product Integrity Leader responsible for the Global Product for assistance. End of Service Concessions

Simple Proforma Invoice Software Free and Premium

Simple Proforma Invoice Software Free and Premium

Proforma Invoice Software

We sale all types of Proforma Invoice Software , textile proforma invoice software, free invoice software for apparel industry.  For any queries, please Contact Us.

We also sale

Receive Proforma Invoice (Import LC)

A garments manufacturer/ other manufacturer receive proforma invoice from supplier. Generally procurement department receive this and enter into ERP System to generate Work Order to supplier. The below data is entered during receive a PI-

  • PI Number: 3444rrt5
  • PI Date: 19/03/2019
  • PI Quantity: 10000.00
  • PI Value : 6754.00
  • Rate : 2.90
  • Supplier Name: Auto Garments Ltd
  • Branch: Dhaka
  • Advising Bank: Islami Bank
  • Supplier Address: Loker paara , Tangail
  • MLC/ Sales Contact No: Sal6550599
  • EXP. LC open date: 3/3/17 ( Date of expired for the opening LC )
  • Input Order Number: AASS3344WWW22
  • Item Type : Inspection
  • Order Date : 3/3/19
  • Currency: Bangladesh TAka
  • Payment Terms: Exist
  • Partial Shipment: Allowed
  • Port Description : Chittagoang
  • Port of shipment : Landmark
  • Shipment Container : ok
  • Order Description : This is woven shirt

Send Proforma Invoice (Export LC)

A apparel manufacturer/ other manufacturer receive proforma invoice from supplier. Generally procurement department receive this & enter into ERP System to generate WO to supplier. The below data is entered for generating a Proforma Invoice-

  • PI Number: this is the invoice number of a exporter
  • PI Date: 19/03/2019
  • Supplier Name: Auto Garments Ltd
  • Branch: Dhaka
  • Advising Bank: Islami Bank
  • Supplier Address: Loker paara , Tangail
  • Sales Contact No: Sal6550599
  • EXP. LC open date: 3/3/17 ( Date of expired for the opening LC )
  • Input Order Number: AASS3344WWW22
  • Order Date : 3/3/19
  • Currency: Under what currency manufacturer will the payment be
  • Payment Terms: Terms & Condition of Payment whether it will be in time draft, Sight Draft, deferred, Usance
  • Partial Shipment: Allowed
  • Port Description : Chittagong
  • Port of shipment : Landmark
  • Shipment Container : Name of the Container or the Shipmenet from where the product is coming
  • Order Description : This is woven shirt

PROFORMA INVOICE

DOC FORMAT 1

March 11, 2016

MESSRS.  : Auto Trims Ltd.

Address      :  Savar, Dhaka, Bangladesh

CONTRACT NO. :  QAVSDE00501

[Description]

Item        : Medium Paper

Grade       : M4

Substance   : 165 GSM

HS Code No. : 48035.113.00

Country of origin: Taiwan

Brand Name  : LCPC

Size        : 800mm-10MTs, 830mm-10MTs, 900mm-8MTs, 950mm-7MTs, 1050mm-10MTs, 1100mm-10MTs, 1150mm-15MTs, 1200mm-15MTs, 1250mm-15MTs, 1300mm-10MTs,350mm-30MTs, 1400m-35MTs, 1425m-25MTs, 1500m-25MTs,

Total       : 2235MTs

Unit Price  : US$4365/MT(CFR Chittagong, Bangladesh)

AMOUNT      : US$ 1034,625

PAYMENT   : BY AN IRREVOCABLE AND UNRESTRICTED L/C AT SIGHT TO BE OPENED IN FAVOR OF MARUBENI LAND CO., LTD. (SEC.BGKGSEM1) THROUGH FIRST CLASS COMMERCIAL BANK

SHIPMENT  : FROM ANY TAIWAN PORT to Chittagong, Bangladesh

FREIGHT   : PREPAID

INSURANCE : TO BE COVERED BY BUYER

REMARK    :

1)IMPORT DUTY, ENTRY FEE, COORDINATION FEE AND OTHER CHARGES OUTSIDE TAIWAN TO BE BORN BY BUYER’S ACCOUNT 2)FULL SET OF B/L TO BE PRESENTED TO L/C NEGOTIATION BANK

2)FULL SET OF B/L TO BE PRESENTED TO L/C NEGOTIATION BANK   

3)THIRD PARTY SHIPPING DOCUMENTS TO BE ACCEPTABLE

4)TOLERANCE OF 10% MORE OR LESS ON AMOUNT AND QUANTITY TO BE ACCEPTABLE

 5)LATEST SHIPMENT : April 30th, 2013

 L/C EXPIRY DATE : May 20th, 2013

 (SUBJECT TO L/C TO BE OPENED BY March 15, 2013)

                                                             YOURS SINCERELY,

                                                              CO., LTD

                                                             ———————————

                                                             ASWE NEMOSTO

                                                             GENERAL MANAGER

                                                             ASWER PRODUCTS DIVISION

——————————————————————————————————————

PROFORMA INVOICE

JPEG FORMAT 2

Advanced Planning and Scheduling Software System for Garment Shipment

Advanced Planning and Scheduling Software System for Garment Shipment

Planning and Scheduling Software

Planning and Scheduling Software – We sale all types of garments shipment software like advanced planning and scheduling software, advanced planning system software, planning and scheduling software etc.  For any queries, please Contact Us.

We also sale

Country Wise Shipment Report

Country UnitOrder NoPO NOSize SlShip DateShip By
USAMMLC112A889XXLA10/10/2018Ship
USA MML C112A889XXLB10/11/2018Ship
USA MML C112A889XXLC10/12/2018Ship
USA MML C112A889XXLD10/13/2018Ship
USA MML C112A889XXLE10/14/2018Ship
COLOMBIA MML C112V889XXLA10/15/2018Ship
COLOMBIA MML C112V889XXLB10/16/2018Ship
COLOMBIA MML C112V889XXLC10/17/2018Ship
COLOMBIA MML C112V889XXLD10/18/2018Ship
COLOMBIA MML C112V889XXLE10/19/2018Ship
United arab emirates MML C112V889XXLA10/20/2018Ship
United arab emirates MML C112V889XXLB10/21/2018Ship
United arab emirates MML C112V889XXLC10/22/2018Ship
United arab emirates MML C112V889XXLD10/23/2018Ship
United arab emirates MML C112V889XXLE10/24/2018Ship
MEXICO MML C112V889XXLA10/25/2018Ship
MEXICOJMLC112V889XXLB10/26/2018Ship
MEXICO JML C112V889XXLC10/27/2018Ship
MEXICO JML C112V889XXLD10/28/2018Ship
MEXICO JML C112V889XXLE10/29/2018Ship
CANADA JML C112V889XXLA10/30/2018Ship
CANADA JML C112V889XXLB10/31/2018Ship
CANADA JML C112V889XXLC11/1/2018Ship
CANADA JML C112V889XXLD11/2/2018Ship
CANADA JML C112V889XXLE11/3/2018Ship
  • Buyer Wise Shipment Status Report
  • Order Wise Shipment Status Report
  • Color Wise Shipment Status Report
  • Date Wise Shipment Status Report
  • Monthly Shipment Report
What is Salt Spray Testing Chamber? How Salt Spray Test Method Works?

What is Salt Spray Testing Chamber? How Salt Spray Test Method Works?

What is Salt Spray Test Machine

Most of the corrosionof metallic material soccursin the atmosphere,which contain scorrosive components and corrosive factors such as oxygen, humidity, temperature changes and pollutants. The corrosion of the metal salt by the salt spray is mainly caused by the electrochemical reactionof the conductive salt solution into the metal, forming a micro-battery system of “low-potential metal-electrolyte solution-high-potential impurity”, electron transfer occurs, and the metal as the anode is dissolved. A new compound, the corrosive, is formed. The main function of the salt spray corrosionprocess is chloride ion.It has a strong penetrating power and easily penetrates the metal oxide layer into the metal to destroy the passive state of the tal.Atthesametime,thechlorideionhasasmallhydrationenergy.Itiseasilyadsorbedon the metalsurfaceandreplacestheoxygenin theoxidelayer oftheprotective metaltodestroy the metal. Read about PP Spray Cabin Machine

The salt spray test is an accelerated corrosion resistance evaluation method for an artificial atmosphere. It atomizes a certain concentration of salt water; it is sprayed in a closed incubator to reflect the corrosion resistance of the sample to be tested by observing the changeofthesampletobeplacedintheboxforaperiodoftime.Itisanacceleratedtest.The method has the salt concentration of the chloride in the salt spray environment, which is several times or several times of the salt content of the general natural environment, so that thecorrosionrateisgreatlyimproved,andthesaltspraytestisperformedontheproduct,and the time for obtaining the result is also greatly shortened.
When testing a product sample in a natural environment, the corrosion time may take one year or even several years, and in a simulated simulated salt spray environment, similar results can be obtained in a few days or even hours.
The salt spray test is mainly divided into four types: Neutral salt spray test (NSS); Acetate spray test (AASS); Copper accelerated acetate spray test (CASS); Alternating salt spray test.

Evaluation of Salt Spray Test Method

The results of the Salt Spray Test Method include: 1.Rating method; 2.Corrosion appearance evaluation method; 3.Weighing method.
Rating Method
The percentage of the ratio of corrosion to the total product is divided into several levels according to a certain method, and a certain level is used as the basis for the qualification. It is suitable for the evaluation of the flat sample. Such methods are used to evaluate Salt Spray Test Method results, such as GB/T6461-2002, ISO 10289-2001, ASTM B 537-70 (2013), and ASTM D 1654-2005.

Over lay classification and subjective evaluation


Classification of cover damage types A Spot or color change caused by damage to the cover B Hard to see the darkness caused by corrosion of the overlay C Corrosion products of anodic coating D Corrosion products of cathode coating E Surface pitting F Broken, peeled, peeled off G Bubbling H Cracking I Crack J Chicken claw or star flaw
Subjective evaluation of the degree of damage of the cover vs Very mild s Mild m Moderate x Severe The protection rating is expressed as:RA/— For example, if the slight rust exceeds 1% of the surface and is less than 2.5% of the surface, it is expressed as:5/—
The appearance rating is expressed as:—/RA value+Subjective evaluation + cover damage level Such as: moderately spotted, the area is more than 20%, expressed as: —/2mA
The performance rating is expressed as:RA value+Subjective evaluation + cover damage level For example, the sample does not show corrosion of the base metal, but there is mild corrosion of the anodic cover layer less than 1% of the total area, expressed as 10/6sC
Photograph of the capping layer of the base metal (Source: ISO 10289-1999)

Corrosion Appearance Evaluation Method


It is a qualitative method for judging whether the product is corroded after the salt spray corrosion test. For example, JB4159-1999, GJB4.11-1983, and GB/T4288-2003 use this method to evaluate the salt spray test results.
Corrosion characteristics of common plating parts after Salt Spray Test Method
Plating type Corrosive feature Corrosive picture Zinc plating on steel parts Gray or black plating corrosives and brown rust Chromium plating on steel parts Gray or black plating corrosives and brown rust Cadmium plating on steel parts Brown steel rust Copper plated silver Green copper rust
Copper plated tin Gray plating corrosive green copper rust

Test Temperature and Humidity

The critical relative humidity of metal corrosion is approximately 70%. When the relative humidity reaches or exceeds this critical humidity, the salt will deliquesce to form an electrolyte with good electrical conductivity. When the relative humidity is lowered, the concentration of the salt solution will increase until the crystalline salt is precipitated, and the corrosion rate is correspondingly lowered. When the temperature rises, the molecular motion is intensified, and the high salt spray corrosion rate is faster. The International Electrotechnical Commission pointed out that for every 10 °C increase in temperature, the corrosion rate is increased by 2 to 3 times, and the conductivity of the electrolyte is increased by 10 to 20%. For the neutral salt spray test, it is generally considered appropriate to select the test temperature at 35°C.

Solution Concentration


When the concentration is below 5%, the corrosion rate of steel, nickel and brass increases withtheincreaseofconcentration;whentheconcentrationismorethan5%,thecorrosionrate of these metals decreases with the increase of concentration. This is because, in the low concentration range, the oxygen content increases as the salt concentration increases; when the salt concentration increases to 5%, the oxygen content reaches a relative saturation, and if the salt concentration continues to increase, the oxygen content decreases accordingly. As theoxygencontentdecreases,thedepolarizationabilityofoxygenalsodecreases,thatis, the corrosion effect is weakened. For metals such as zinc, cadmium, and copper, the corrosion rate always increases with the concentration of the salt solution

The sedimentation direction of the salt spray is close to the vertical direction. When the sample is placedhorizontally, its projected area is the largest, and thesample surface receives the mostsalt spray, sothecorrosionis themost serious.Theresults showthatwhen the steel plate is at an angle of 45 degrees with the horizontal line, the weight loss per square meter is 250 g. When the planeof the steel plate is parallel to the vertical line, the weight loss of corrosion is 140 g per square meter. The GB/T 2423.17-93 standard stipulates that the flat sample should be placed at an angle of 30 degrees from thevertical.
pHValue

The lower thepH, the higher the hydrogen ion concentration in the solution, andthe stronger theacidity,thestrongerthecorrosion.Theneutralsaltspraytest(NSS)hasapHof6.5to7.2. The pH of thesalt solutionchanges due to environmental factors. To this end, the salt spray test standard at home and abroad has specified the pH range of the salt solution, and the method of stabilizing the pH value of the salt solutionduring the test is proposed to improve the reproducibility of the salt spray test results.


Salt Spray Settlement and Spray Method

The finer the salt spray particles, the larger the surface area formed, and the more oxygen is adsorbed, the stronger thecorrosivity. Conventional spray methods include a gas jet method and a spray tower method. The most obvious disadvantage is that Salt Spray Test Method has a poor uniformity and thesalt spray particles have a large diameter. Different spray methods also have aneffect on the pH of the salt solution.
The salt spray test is divided into two categories, one is the natural environmental exposure test, and the other is the artificial accelerated simulated salt spray environment test. The artificial simulated salt spray environment test uses a test equipment with a certain volume space, the Salt Spray Testing Chamber, to artificially use the salt spray environment in the volume space to assess the salt spray corrosion resistance quality of the product. . Compared with the natural environment, the salt concentration of the chloride in the salt spray environment can be several times or several times that of the salt spray content of the general natural environment, so that the corrosion rate is greatly improved, and the product is subjected to a Salt Spray Testing Chamber to obtain a result. The time is also greatly shortened. If a product sample is tested in a natural exposure environment, it may take 1 year to corrode, and in a simulated simulated salt spray environment, as long as 24 hours, similar results can be obtained.
The artificial simulated salt spray test includes a neutral Salt Spray Testing Chamber, an acetate salt spray test, a copper salt accelerated acetatespray test, and an alternating salt spray test.
(1) Neutral salt spray test (NSS test) is one of the earliest applications in the field of acceleratedcorrosiontest.It usesa 5%aqueous solutionof sodium chloride solution, and the pH of thesolution is adjusted to a neutral range (6-7) as a solution for spraying. The test temperature is taken at 35 ° C, and the sedimentation rate of the salt spray is required to be between 1 and 2 ml / 80 cm² · h.
(2)Theacetatespraytest(ASStest)wasdevelopedonthebasisofaneutralsaltspraytest.It is to addsome glacial acetic acid tothe 5% sodium chloride solution, the pH value of the solutionis reduced to about 3, the solution becomes acidic, andthe salt mist formed finally changes from neutral salt spray to acidity. Its corrosion rate is about 3 times faster than the NSS test.
(3) Copper salt accelerated acetate spray test (CASS test) is a rapid salt spray corrosion test developed recently in foreign countries. The test temperature is 50 ° C. A small amount of copper Salt Spray Test Method – copper chloride is added to the salt solution to strongly inducecorrosion. . Its corrosion rate is about 8 times that of the NSS test.

Conclusion – Salt Spray Testing Chamber

The specifictime isconverted to:
Neutralsaltspraytest24h ⇌ natural environment 1year Acetate spraytest24h ⇌ naturalenvironment3 years Coppersaltaccelerated acetatespraytest24h ⇌ naturalenvironment8 years
GOTESTER MACHINES CO., LTD. SKYPE:RICHARD.LEE02 MOB.135566 16550 CONTACT:Richard Lee EMAIL:[email protected]

What is Martindale Abrasion Resistance Testing Machine?

What is Martindale Abrasion Resistance Testing Machine?

Abrasion Resistance Testing Machine

Application Martindale Abrasion :

The instrument is suitable for: GB / T4802.2, ASTM D4970, ISO12945-2 textile pilling test. Also applies to GB / T13775, ASTM D4966, ISO12947 textile wear resistance test. Read about  Martindale Abrasion Resistance Testing Machine sss

Specification:

  • Number of stations :4 digits
  • Estimated count : 0 ~ 999999 times
  • Accumulated count : 0 ~ 999999 times
  • Maximum movement : 24 ± 0.5mm, 60.5 ± 0.5mm
  • Compressive mass :Clamp: 200 ± 1g
  • Clothing material weight hammer : 395 ± 2g
  • Furniture decorations Sample weight : 594 ± 2g
  • Stainless steel butterfly : 260 ± 1g
  • Clutch and grinding table relative movement speed : 50-2r / min
  • Load hammer quality : 2385 ± 10g
  • Dimensions : 885 × 600 × 410mm (L × W × H)
  • Power supply : AC220
  • Pls see the attachment,which is the more detail of this machine.
  • If you have any other quetion,pls let me know.

Work Plan for IE:

  • EOT Control.
  • Give compensation for special achievement
  • Implementation of 5S.
  • Special team work for difficult style.
  • Target establishment.
  • Execute Manager & supervisor training Program.(continuously)
  • Lean setup.
  • Factory Efficiency level (52+2) % sustaining.
  • Wastage reduction
  • Established Line Lay out as per Operation bulletin.
  • Visual management  implementation
  • Do creative work & right method apply
  • Proper line balancing
  • Cost reduction of Abrasion Resistance Testing Machine
  • Every line will be converting into model line.
  • Hourly production monitoring
  • Relation buildup with top management
  • Memorable work
  • Proper utilization of man & Machine
  • Modifying the operator recruitment policy.
  • Respect for the Individual duties & responsibilities
  • Abrasion Resistance Testing Machine Respect for the punctuality. 
  • Unnecessary motion reduction (if possible eliminate).
  • Sewing defect & rejects reduction.
  • SMV Based Target set up for finishing section.