Rotary Printing Machine

Screen Repeats: Rotary Printing Machine -Lab-Scale Rotary Printing Machine Min. 10 m/min or Higher Min. 500 mm Min. 10 m/min or Higher Min. 500 mm

Screktipe: Rotary and Blade/Rubber Min. Sarrpie size Min. 60×128 cms or higher Can be used for flat bed printing Squeegee Rod type, Blade type
Electromagret strength 1-100%

Pre Production Procedure

PURPOSE

The purpose of this procedure is to ensure that potential risks involved in the production of future production are assessed and documented and that all standards and specifications are clean. Read also Printing and Packaging Machine Spare Parts

SCOPE

This procedure applies to all styles.

RESPONSIBILITY AND AUTHORITY

It is the responsibility of the Pattern Technical Manager to ensure the implementation of this procedure.

PROCEDURE

Once the customer approves contract seals, the internal pre production meeting can commence.  A factory pack will be sent to the factory with a duplicate contract seal so the factory can prepare for the meeting.  The meeting can take place in Production unit.

  • In attendance should be:
  • Pattern Technical Manager,
  • Quality Assurance Manager,
  • Operation Manager,
  • Industrial Engineer,
  • Garment Technical Assistant,
  • Fabric Technologist,
  • Merchandising,
  • Head Mechanic,
  • Cutting Room Manager,
  • Training Manager,
  • Production Manager,

The meeting will follow the pre production agenda taking into onsideration comments made about the risks during development, possible risks nvolved concerning the production of garments for the season ahead, machine capabilities, key quality points / availability’s and training / skills required are discussed.

Components are categorized in 4 main areas:

  • Planning
  • Pre manufacturing
  • Manufacturing
  • Finishing

Bulk Component Approval Procedure

PURPOSE

The purpose of this procedure is to ensure that bulk components are signed off and approved prior to bulk production.

RESPONSIBILITY AND AUTHORITY

It is the responsibility of the Pattern Technical Manager, Quality Manager, Fabric Technologist & Merchandiser to ensure the implementation of this procedure.

PROCEDURE

  • On receipt of Product Spec the relevant Purchasing Clerk orders trims required.
  • On receipt of trims the factory complete 4 bulk component cards containing:
  • Thread approvals;
  • Fastenings;
  • Bought in components;
  • All sew in labels;
  • UPC labels / fabric composition stickers;
  • Box end labels / bag seal;
  • Button / swing tickets;

Bag Reference, relevant to style / Price Sticker / Hanger / Attachment etc.The Pattern Technical Manager, Quality Manager, Fabric Technologist & Merchandisers will sign 4 bulk component cards. These are to be distributed as follows.

  • One to North Street,
  • One to Trim Stores,
  • One to Production,
  • One to Style File,

This allows bulk cutting when bulk authorisation is issued.These Bulk Component Cards are kept for reference:By the factory and in the Head Office Style File