Check List for Fire Safety Device 

  • Access limited or barred to DB / DB blocked
  • Access limited or barred to the panel / panel blocked
  • Access limited/barred to MCB/MCCB-box
  • Access limited/barred to Socket. Access limited/barred to Switch-Board
  • Access limited: Earth-bar not accessible inside the panel
  • Air gap between phases less than 25 mm in cases of bare conductors (e.g., bus-bars)
  • Ammeter / Voltmeter/indicator/PFI auto-controller not working
  • Ammeter/Voltmeter’s selector switch bad
  • Bunch of cable/multiple wires /looping wire connected at incomer MCCB/MCB’s input/output terminal
  • Bunch of cable: looping from incomer MCCB/MCB’s input terminal
  • Bunch of cable connected at bus-bar
  • Bunch of cable: Multiple connections through one outlet of final-BBT
  • Bunch of cable: Multiple connections ( more than two) through one socket outlet
  • Burning sign on conductor at incomer MCB/MCCB’s input/output terminal
  • Burning sign on conductor at the connection point to bus-bar
  • Burning sign on Current Transformer inside the panel
  • Burning sign on phase bus-bar, Burning sign on socket
  • combustible wooden board : Use of wooden board/enclosure for MCCB/MCB
  • Combustible material in the generator room
  • Combustible material in the substation
  • Combustible material near the HT panel/ HT line
  • combustible wooden board: Tube light /Bracket Light/spot light/Normal light installed on wooden Board
  • Combustible wooden board: X-former installed on combustible wooden plank
  • combustible wooden board: Grinding M/C (or other M/Cs) installed on wooden platform/table/combustible material
  • combustible : Light-shed tied with combustible material
  • Combustible material in touch of MCB/MCCB-Box
  • Combustible material in touch of Socket
  • Combustible material in touch of Switch-Board
  • Combustible material is used to seal the Panel Board
  • Combustible material on / touching (adjacent to)/attached on the panel
  • Combustible material on Cable Tray
  • Combustible material on or touching (adjacent to) Cable Tray
  • Combustible material in Cable Trench, Combustible material tied with/in touch of BBT
  • Combustible material touching exhaust fan
  • Combustible material used as support for the Cable Tray
  • Combustible material used as support for the panel
  • Combustible materials: Socket installed on combustible materials
  • combustible wooden board: Cable channel made with combustible wooden board
  • combustible wooden board: SB installed on combustible material/wooden board
  • Combustible wooden board: The live parts of the panel (buses) are guarded with combustible wooden board
  • Combustible material in touch of / near motor
  • Combustible material in touch of/near wire/cable
  • Combustible material near the Cable Tray
  • Combustible material near the panel ( Just below or with in 3feet)
  • Combustible material near any Electrical Apparatus
  • Combustible material near BBT, Combustible material near IPS-Unit
  • Combustible material near Light-shed
  • Combustible material near MCCB/MCB-box
  • Combustible material near Switch-Board
  • Combustible material near/surrounding Socket
  • Combustible material used as support for any installation
  • Combustible material: IPS-Unit kept on combustible material
  • Earth-bar shorted with neutral-bar
  • Earthing cable not connected properly at the panel door
  • Earthing: One point frame earthing of the generator instead of two
  • Flexible cord’s outer insulation discontinued
  • Lint/dirt present in the transformer area
  • Lint/dirt present on the top and at the bottom of the transformer
  • Lint/dirt: Lint/dirt present in the S/S or generator room
  • Lint/dirt present in the S/S room
  • lint/ dirt, spider-net or combustible material present inside the panel board
  • Improper installation of light sheds
  • Improper installation of MCB/MCCB
  • Improper installation of socket
  • Improper installation:-Cable laying on the Cable Tray improperly
  • Improper installation:-Ceiling fan blade at accessible height
  • Improper installation:-Chemical stored inside the maintenance room without any proper separator.
  • Improper installation:-DB installed at a height out of normal reach
  • Improper installation:-DB installed in the chemical room / chemical store
  • Improper installation:-Empty earth-bar
  • Improper installation:-Empty neutral-bar
  • Improper installation:-Equipment-earthing and system-earthing shorted
  • Improper installation: Extension line taken from ceiling rose point instead of socket outlet.
  • Improper installation:-Lamp holder at an accessible height & without any lamp
  • Improper installation:-MCB/MCCB installed without enclosur
  • Improper installation:-Neutral & earthing of transformer are connected at the same point
  • Improper installation: No neutral-bar at all
  • Improper installation:-Normal light (uncovered) above combustible materials
  • Improper installation:-Normal light above combustible materials or chemical in store
  • Improper installation:-Normal Socket installed in the chemical room /chemical store
  • Improper installation:-Normal Switch Board installed in the chemical room / chemical store
  • Improper installation:-Pump/Motor base not made properly
  • Improper installation:-Pump/Motor not fixed with base properly
  • Improper installation:-SB installed at an inaccessible height
  • Improper installation:-Scotch tape used to tie wires inside the panel board instead of cable tie.
  • Improper installation:-Cable conduit on wall not clipped properly
  • Improper installation:-Rod-gap not aligned
  • Improper installation:-Indicators not in proper sequence (R-Y-B)
  • Improper installation:-No cover on cable trench specially in sub-station and generator room.
  • Improper installation:-Undressed messy wire present inside the panel.
  • Improper installation:-Undressed power electrical conduits.
  • Improper installation:-Wiring channel under the table
  • Lighting: No/insufficient light on working platform in the maintenance room
  • Lighting: No/insufficient lighting inside the S/S or generator room
  • Loose:-Bracket light holder loos
  • Loose:-Ceiling rose loose
  • Loose:-Light shed loo
  • Loose:-MCB/MCCB-box loose / broken / not sealed
  • Loose:-Socket loose / broken / not sealed
  • Loose:-Tube light guard loosens and tied with copper-wire
  • Mechanical guard :-No/ broken /discontinued /insufficient mechanical guard on power cable at wall/floor
  • Mechanical guard :-No/ broken /discontinued /insufficient mechanical guard on wiring cable
  • Missing: Horn-gap upper/lower part missing
  • Missing: Bracket light cover missing
  • Missing: Silica gel of x-former breather becomes brown
  • Missing: Transformer breathers oil pot em
  • No earthing connection at electric iron (if metal body)
  • No earthing connection at spot removing spray gun
  • No ECC:-Motor ECC not done
  • No frame earthing at generator
  • No earth bus-bar at all
  • No earthing connection at any rotating M/C
  • No earthing connection at auto shaker M/C at lab
  • No earthing connection at cad tester M/C at lab
  • No earthing connection at fridg
  • No earthing connection at grinding M/C
  • No earthing connection at kettle
  • No earthing connection at Socket
  • No earthing connection at the welding M/C
  • No earthing connection at the welding M/C (or other M/C)
  • No ECC at any electric equipment
  • No ECC:-at IP
  • No ECC:-Cable armor not connected with the ECC
  • No ECC: Pump suction and delivery pipe ECC not done
  • Inadequate ECC at electrical equipment/Panel/ Motor
  • No earthing connection at the panel door
  • No ECC:-Cable channel body earthing not done
  • No ECC:-Cable trunking body earthing not done
  • No/insufficient/incomplete lightning protection
  • No/insufficient/unsafe stair at the entrance of the substation     
  • No/insufficient/unsafe stair to the entrance of lift room
  • Not sealed:-BBT end cover missing
  • Not sealed: Drill M/C (or other M/C’s) connection terminal not sealed properly
  • Not sealed: Generator’s supply terminal box not sealed
  • Not sealed: Motor connection terminal cover not sealed / glanded
  • Not sealed:-No cover is used over ceiling rose
  • Not sealed: Pump/Motor connection terminal cover not sealed / glanded properly
  • Not sealed:-Top-Bottom of Energy meter Box/Enclosure open (not sealed)
  • Not sealed:-Bottom of the panel (cable entry-exit point) is open
  • Not sealed:-Panel door not sealed properly
  • Not sealed:-Switch-Board loose / broken / not sealed
  • Not sealed:-Tap-off box not sealed
  • Not sealed:-The changeover switch enclosure not sealed
  • Not sealed:-The Panel board not sealed
  • Not sealed:-Top and bottom of the generator’s supply terminal box open
  • Not sealed:-Top of the panel (cable entry-exit point) is open
  • Not sealed: Circular Box cover broken
  • Not sealed: Circular Box without cover
  • Not sealed: No bush / gland at the cable entry-exit point
  • Nut-bolt-washer for electrical connection rusted
  • Panel door: Door lock bad
  • Panel door:Panel door-hinge broken
  • Panel door:Panel door cannot be closed fully
  • Panel door:Panel door cannot be opened fully
  • Panel door: Panel cover is fixed by nut-bolt
  • Panel door:Panel door is locked by pad-lock
  • Protection: Bypassing the Fuse
  • Protection: Bypassing the incomer MCBB/MCB
  • Protection: Bypassing the MCBB/MCB
  • Protection: MCCB/MCB’s knob broken
  • Protection: The incomer MCCB/MCB’s knob broken
  • protection: Lines taken for indicators/Voltmeter/Ammeter w/o fuse or MCB
  • Rubber mat ;-No rubber mat in front of the panel
  • Rubber mat ;-Non-graded rubber mat in front of the panel
  • separator :One slot left without phase separator at incomer MCCB’s input /output terminal
  • separator: No/insufficient phase separator at incomer MCCB’s output terminal
  • separator: No/insufficient phase separator at the MCCB’s input terminal
  • Splicing / improper cable joint at the same point of both phase and neutral conductors
  • Splicing / improper cable joint at the same point of both phase conductor and ECC
  • Splicing / improper cable joint at the same point of both phases
  • Splicing joint used instead of using earth-bar
  • Splicing joint: No ceiling rose used to connect the tube light /tube light shed (connected by splicing joint)
  • Splicing joint on cable inside Cable Channel without PIB tape
  • Splicing joint: Exhaust fan connection through no outlet (connected by splicing joint)
  • Splicing joint: Splicing at earthing bar
  • Terminal open:-Battery terminal is open
  • Terminal open:-Generator self starter’s connection terminal open
  • Terminal open:-IPS-battery terminal open
  • Unterminated /exposed wire/exposed conductor/exposed bus-bar end (live/dead) inside the panel
  • Unterminated/open/exposed wire (live/dead) throughout the factory.
  • W/O Lug: Connection at incomer MCCB’s input / Output terminal w/o lug
  • W/O Lug: Connection without lug at phase bus-bar
  • W/O lug: Wire connected to the PFI capacitor terminals without lug
  • W/O Lug: Connection without lug at earth bar
  • W/O Lug: Connection without lug at neutral bar
  • W/O Lug: Earthing connected with x-former body w/o lug
  • Water: Rain water enters into the substation
  • Water dropping on the board
  • Water dripping on exhaust fan
  • Water line (tap) touching (adjacent to) the Panel
  • Water line (tap) touching (adjacent to)/near the socket
  • Water line (tap) touching (adjacent to)/near the switch-board
  • Water line (tap) touching (adjacent to)/near to the light/light shed
  • Measurement, Current, voltage measurement for all circuits in the LT,DB,MDB,SDB with connected load
  • Insulation resistance, leakage current measurement for all power cables.
  • Earth resistance test for all earth pits.
  • Thermal scanning for all electrical joints. ( Transformer, Generator, LT, MDB,DB,SDB, power cables, Floor electrical joints general views)
  • Earth continuity test for the electrical equipment and related accessories as sample bases.
  • Document checking, Previous inspection result, notice for periodic inspection